Why doesn't it run all week? What's the history with this route?
I think there might be an argument to run a service on Saturdays as well as Sundays but I doubt a weekday service would really be justified, I believe friends of the S&C want service to Manchester airport via that route.
Apart from that there was just the service to/from Ribblesdale Cement (as it then was) at Horrocksford, which still runs (I think).
I don't think the linked threads cover this, so here goes:
North of Chatburn was built by the LYR to connect with the Midland's new route to Scotland (the Settle and Carlisle), competing with the LNWR West Coast route. Grouping in 1923 meant that it gradually lost importance as a through route.
All passenger services were withdrawn in 1962, but the line remained useful for diversions off the West Coast (which is how I first travelled it in 1972) and non-fully braked freights avoiding the modernised WCML (until that disappeared). Apart from that there was just the service to/from Ribblesdale Cement (as it then was) at Horrocksford, which still runs (I think).
The Sunday-only Dalesrail service was started as long ago as the 70's, but with no intermediate stops (I'd be delighted with a Saturday service as 47802 suggests).
Blackburn-Clitheroe was reopened 1994 as a commuter route but Clitheroe is very much the end of housing development.
Yes it does still run.
According to Freightmaster it runs three times a week (Monday, Wednesday, & Friday) one in each direction.
Also in the FM tables there is a empty Gypsum New Biggin to Warrington (Monday only, as required) and a daily departmental Carlisle to Crewe.
Doesn't the Carlisle-Chirk log flow follow this route (when it runs)?
Doesn't the Carlisle-Chirk log flow follow this route (when it runs)?
Wasn't that the Ribblehead service which has now finished.
My in-laws in Appleby were rather disappointed that the flow is one-directional, so folk from Blackpool can come for a day-out on the S&C, but they can't do a day-out to Blackpool.
Yes it does still run.
According to Freightmaster it runs three times a week (Monday, Wednesday, & Friday) one in each direction.
Also in the FM tables there is a empty Gypsum New Biggin to Warrington (Monday only, as required) and a daily departmental Carlisle to Crewe.
Astonishing considering there were 40 - 50 freights a day in the early 1970s.
I used to listen to them one after another struggling up the bank at Brownhill in both directions until about 2am when I eventually nodded off to sleep !
