Providing long term resilience for the South West rail network is the answer.
In the immediate short term, the reinstatement of the Okehampton to Bere Alston route should be positively considered and implemented as soon as possible. The course of this line would provide an interim relief route between Plymouth and Exeter should future disruptions occur on the current route. It would also have advantages for Central and North Devon economies as well. In hindsight, it can now be seen that Beeching made a very big slip-up by closing this particular section of the South West rail infrastructure.
In the longer term, a more practical solution would be the construction of a twin-track tunnel under the Halden Hills from a point just south of Exeter to a point South East of Newton Abbott. This proposal would provide stability and resilience. The distance between the two points is approximately eight miles. I mention this as a tunnel would appear to be the most economical and environmentally-friendly solution. It would also provide the minimum of disruption to local road traffic and when completed would provide an efficient high-speed alternative route with improved journey times to stations further east and west. The coastal route should also be kept and maintained to serve the local communities and also act as a second relief line should disruption or engineering work take place on the other two routes.
Yes, I know it will cost a vast amount, but in the long term it will be worth spending the money.
Looking way ahead, maybe it is the West Country and South West peninsula that should have a brand new high-speed route rather than the proposed HS2. Just thought I would also mention that as the Dutch have constructed some new tunnels and new high-speed lines such as the new 60-mile Hanzelijn Line that was completed in 2012, so what is preventing us from doing the same? This Dutch project is a typical example of positive planning for the future and that is what this country needs to do. Is it all a question of cost or are there local and/or national political considerations stifling so many of the issues?
The powers that be (National Rail, the local councils and the Government) have to start acting NOW before another coastal catastrophe takes place which it surely will sooner or later. Integrated co-operation and action between the relevant authorities is urgently required so let's see some real serious action for a change and not just a load wishful thinking about what could possibly be. Now is the time to turn real possibilities into some
positive action to create and build some long term resilience into the rail infrastructure west of Exeter.
In saying the above, the National rail staff and employees are doing a first-rate job in adverse conditions to get the Dawlish route repaired so the South West peninsula will be open for business again.