It's 2J96 from Woodgrange Park: http://www.realtimetrains.co.uk/train/L36678/2014/02/03/advanced
Interestingly it misses out Gospel Oak!
I caught it the other week from Wanstead Park (only as far as Blackhorse Road) and it was almost empty, in comparison to the one before that was so busy I couldn't get on!
Obviously starting only one station away rather than two has an impact on that, and does illustrate how many people board at Barking!
urban469 said:Fascinating! Thanks everyone for the info. Is that the only passenger-carrying DMU on LO outside of the Goblin line? Are there any services in the other direction?
Also, why do they need to get a DMU to Willesden Jctn every day - is there a service reason?
No through platform, as you must be aware of...![]()
Presumably it makes sense to send the DMU to Willesden Junction rather than terminate at Hampstead Heath, as it would need to head back to Willesden TMD anyway. There's also the problem of the unit blocking up the very busy NLL if it has to reverse at Hampstead Heath, or confused passengers trying to board the unit once it terminates!
Not sure if there's a return working in the evening, though.
I haven't been to Gospel Oak for so long I can't remember, but is there any way of converting the bay into a through easily? Or is it ridiculously difficult and/or complicated and expensive?
It's not a bay platform in the traditional sense, as I don't think there's anything particularly solid at the end of the line, so it wouldn't be too difficult to turn it into a loop.I haven't been to Gospel Oak for so long I can't remember, but is there any way of converting the bay into a through easily? Or is it ridiculously difficult and/or complicated and expensive?
It'd also require reinstatement of the south curve to allow them to run into Kentish Town - not sure how much the formation has been built on, but it sounds expensive already!(Being totally "blue sky"; for connectivity, half the trains could be diverted to Kentish Town (the line's old terminus) and half continue beyond Gospel Oak. But that would require a new platform at Kentish Town... which would be v expensive!)
It's not a bay platform in the traditional sense, as I don't think there's anything particularly solid at the end of the line, so it wouldn't be too difficult to turn it into a loop.
Who knows, it may be worth considering when the line is electrified - as there'll no longer be any particular reason to terminate all services at Gospel Oak. Depending on paths, some could continue through to Willesden Junction (or beyond).
Using the ruler on Google Earth it appears to be just under 100m long.
It's not a bay platform in the traditional sense, as I don't think there's anything particularly solid at the end of the line, so it wouldn't be too difficult to turn it into a loop.
Who knows, it may be worth considering when the line is electrified - as there'll no longer be any particular reason to terminate all services at Gospel Oak. Depending on paths, some could continue through to Willesden Junction (or beyond).
Then again, aren't some of these freights ceasing to use the GOBLIN and NLL when the Ipswich work is completed, so the paths should in theory become available anyway?