Manchester77
Established Member
From Monday, Gate 2 of Old Trafford Depot (the one onto the Altrincham Line) will be fully operational under TMS control. This will allow 29 trams to be operated from the depot rather than the current 18 using the existing gate 3(the one onto the SML). The increase of trams is due to the transfer of Eccles/MediaCity trams to Old Trafford from Queens Road which will mean that trams heading back to the depot won't have to operate through the ATS signalled area. It looks as if Piccadilly - Altrincham trams will continue to be split between Old Trafford and Queens Road.
