ushawk
Established Member
anyway ive gone back to the office and managed to find a quiet spot to sleep, hopefully no security guards spot me
May i ask why ? Services are running.
Or is it because you have to sit in scum class ?
anyway ive gone back to the office and managed to find a quiet spot to sleep, hopefully no security guards spot me
One thing that has been totally overlooked on here is the fact that 5 of the top 10 years for rainfall in the 110 years since records began have actually occured in the last 10 years.
This is presenting a significant challenge to Network Rail in maintaining such things as embankments and drainage...
In that case how can you suggest the emergency timetables are over the top? A tree came down earlier on the wires at knebworth. The emergency timetable meant delays were pretty minor with everything, including stoppers, running round the loop. If the normal TT was in place it would certainly have caused chaos and led to lots of delays and cancelations along with choruses of "you have known about this storm since the weekend so why attempt a normal service..."
This might seem a silly question but I don't have a TV so I wouldn't know.
However when I did used to have one I remember frequently hearing this on the news "don't travel unless you have to" (or words to that effect) - meaning any form of transport.
Do they not do this any more?
The reason I ask is that a lot of people on here seem to be under the impression that driving is perfectly safe in these conditions (hence their belief that rail travel must also be 100% safe in any weather), however I'm pretty sure the news used to tell people not to go out!
I am sure it does present a challenge given the number of staff they have made redundant in recent years!!
Absolutely nothing to do with redundancies.......
But whilst we are on the subject, I seem to recall when put out on a voluntary basis, there was no shortage of takers. Which may be something to do with the very generous terms offered.....I just so happened to be working for Network Rail at the time.
Many Track Renewal Staff might not agree with that statement!!
Think I prefer Bob Crows view on it all.
Having been diverted via the Hertford Loop and nearly been cancelled at Peterborough, 1H05 (1549 from Kings Cross) terminated at Selby some 109 minutes down. This was done into platform 1 with a TP 170 already in the platform, which added another 23 minutes to its own delay of 5 minutes, now attributed as "This train has been delayed by passengers transferring between trains". Still we kept time with the Pacer via Goole!
Anyone got any idea what's happening Friday? I've heard it's supposed to be as bad as today, possibly worse, sadly we're due to travel back that day!
Think I saw you zip past Hertford North! Hope you enjoyed your unexpected HLL trip
If anyone wants a laugh/wants to feel sorry for some people, check out this service. Running from London King's Cross to Leeds, via Lincoln. Was due to take just under 4 hours, and it's already 2 hours late at Peterborough. At this rate it'll get to Leeds tomorrow morning![]()
Arun Valley has now closed trapping I believe four services. Due to flooding at Christ's Hospital and Pulborough, along with a few trees down. Flood warning for River Uck around Lewes and total loss of signalling at Havant box. A colleague of mine has been stuck with her train at Portsmouth Harbour since 16:30. Also power issue caused signal at Chichester to go back on a departing train.
Much more to come by the look of it!
The wind has brought down more than 60 trees on train lines, Network Rail said, while mud-slides and flooding also caused delays.
Staff had had to clear trampolines and sheds from the lines, the rail company added.
I went Doncaster - Newark via Lincoln (EC) on emergency diversion once so the route knowledge could have been there to go direct Lincoln - Doncaster?If anyone wants a laugh/wants to feel sorry for some people, check out this service. Running from London King's Cross to Leeds, via Lincoln. Was due to take just under 4 hours, and it's already 2 hours late at Peterborough. At this rate it'll get to Leeds tomorrow morning![]()
I went Doncaster - Newark via Lincoln (EC) on emergency diversion once so the route knowledge could have been there to go direct Lincoln - Doncaster?
NR must hate the weather. Especially their accountants.
Slightly OT, but a not inconsiderable number of people flying into Gatwick and Bristol have found themselves landing at Stansted or Birmingham.
Train hit a tree at St Mary Cray earlier causing severe delays from Victoria to Kent. One passenger reported that the train hit the tree and then allegedly slid along the tracks unable to break due to debris. All that even at the lowered limit of 50mph. Trains along that area do around 90mph normally. Shocking picture, must have been terrifying for the driver.
![]()