I remember many moons ago the Fort William Sleeper being electrically hauled into Glasgow Central High Level, then a 37/4 hauled it via the link at Rutherglen & Glasgow Central Low Level.
I am not sure if this was booked or due to Engineering Works.
Can some kind person confirm this.
When the Fort Bill stopped going into Queen St HL, it was booked to run as one portion of a long rake into Central. The Fort Bill portion then ran down to Rutherglen, went round the North chord there and then through Central LL. It was booked to go this way for quite a long time.
One of the other portions went to Stranraer, there may have been a third.
If there was a third it may have been the second Inverness, back in those days there were 2 Euston - Inverness sleepers every night, one was a complete rake that ran solo the whole way, the other was a shorter portion that split/joined with others.
.