PHILIPE
Veteran Member
To run from beyond Cardiff to Portsmouth could only happen if franchising maps were redrawn.
The Cardiff-Portsmouth probably brings quite a few more places within one change of Cardiff. If it is cut in twain and through trains from S.W.Wales to Cardiff are cut you increase the number of changes needed to get to Havant or Brighton from 2 to four (at Swansea, Cardiff, Bristol/Bath and somewhere between Southampton and Portsmouth) for example.As for the loss of through trains from Cardiff to Pompey, as someone who lives in Bristol I can testify that these services all but empty out on arrival at TM. They're well loaded in and out, but not with the same passengers. Those who do remain on board from S Wales are further thinned out at Bath too. A Swansea-Bath EMU service and a TM-Pompey DMU service is a logical move. It would also allow what S Wales-Pompey line passengers there are easier, same platform changes at Bath rather than having to change at TM.
Couldn't it be shared between franchises? Either stock from one company with different staff on each side of Cardiff or run like (I believe) Carlisle - Newcastle (some services are Scotrail others are Northern).To run from beyond Cardiff to Portsmouth could only happen if franchising maps were redrawn.
The Cardiff-Portsmouth probably brings quite a few more places within one change of Cardiff. If it is cut in twain and through trains from S.W.Wales to Cardiff are cut you increase the number of changes needed to get to Havant or Brighton from 2 to four (at Swansea, Cardiff, Bristol/Bath and somewhere between Southampton and Portsmouth) for example.
The Cardiff-Portsmouth probably brings quite a few more places within one change of Cardiff. If it is cut in twain and through trains from S.W.Wales to Cardiff are cut you increase the number of changes needed to get to Havant or Brighton from 2 to four (at Swansea, Cardiff, Bristol/Bath and somewhere between Southampton and Portsmouth) for example
It isn't just Fishguard to Havant though is it, I didn't even mention Fishguard specifially in that post.What demand is there to get from Havant to Fishguard? Seriously?
It isn't just Fishguard to Havant though is it, I didn't even mention Fishguard specifially in that post.
That applies to trips from:
everywhere west of Cardiff (but particularly anywhere that has fewer trains to Cardiff after electrification) that doesn't gain a through service to Bristolif going to:
anywhere which can be accessed without a further change of train from any station between Bath and Portsmouth that is called at by the Cardiff-Portsmouth
Also, I don't think you've answered my earlier question:
Why are you not convinced about my suggestion of 155s/156s west of Swansea? Do you disagree that 155/156 would be suitable or is it that you believe my suggestions are not possible?
Possibly. Would they be suitable though? Not with the current interior layout certainly, and with a more spacious layout they probably wouldn't provide enough capacity.Someone could decide that the best place for Pacers would be hidden away from faster heavier trains on busy main lines due to their crashworthiness and turn the (relatively) self contained DMU services west of Swansea (inc HoW) into an all Pacer operation...
Possibly. Would they be suitable though? Not with the current interior layout certainly, and with a more spacious layout they probably wouldn't provide enough capacity.
We don't know how things will look after electrification, that doesn't stop us trying to work out what is suitable for what and what may or may not be a good solution.
150 or double Pacer, hard to say which is worse. Both have 75mph top speed and both have insufficient legroom and few (if any) tables. Pacers seem to waste less space with doors but I guess a 150 probably has more luggage space and more seats than a single Pacer (which I believe I have seen used on the boat train in the past passing through Ferryside).For those who hate 150s rather than a 158 on the Fishguard Boats should note that it was 142+143 pairing today.
Well, it is 2014, the Fishguard trial service ends this year. But when exactly? The 3-year trial started in September, but Septemeber, I recently discovered, isn't an 'official' timetable change. So, is the trial actually going to stop at the May or December timetable change, and if not does anyone know the actual date of the end of the trial?
I think this is a classic example of a strawman, Bob - i.e., misrepresent the opponent's position and then attack them for it.The next Welsh Assembly elections are held in 2016 an extended year,so the Minister has a year to bury bad news & cull the trial.
However with the cost of rebuilding the station Fishguard & Goodwick, some red faces will have to explain why it was rebuilt for a trial.
Personally I think the trial will be extended
Interesting views on the suituation, but it doesn't answer my question of when exactly the trial service ends.The next Welsh Assembly elections are held in 2016 an extended year,so the Minister has a year to bury bad news & cull the trial.
However with the cost of rebuilding the station Fishguard & Goodwick, some red faces will have to explain why it was rebuilt for a trial.
Personally I think the trial will be extended, anyone got £1Million spare cash. Wagair contract ends 2015 as does Geralds leased stock
Maybe it is a rational hatred for some Welsh Government policies? I myself am utterly furious with the policy of subsidising aviation, flying in the face of concern about climate change. That policy is illustrated in the form of RAF Valley-Cardiff flights, buying Cardiff Airport and the Cardiff Airport Express TrawsCymru service, which uses three of the high-spec buses orriginally ordered for the Carmarthen-Aberystwyth service (which is probablly the most called for rail reopening in Wales).I can't imagine what the (democratically-elected) Welsh Government has done that has upset you so much, as almost every one of your posts exposes your almost irrational hatred for them.
Extend the trial? That's an interesting fourth option. I thought it would be a choice of working out a new (permenant) service, back to just boat trains or closing the line altogether. A new permenant service would probably involve consultation, and unless the trial goes to December they probably don't have time to organise one of those. An extension of the trial period, with the same services, would get arround that issue quite nicely.I'm sure one of your "sources", who seem so forthcoming when it comes to leaking sensitive news when it suits your own agenda, must know whether the government is minded to extend the Fishguard trial.
In the current period of limited budgets and financial stress I think that extending the trial would be a neat political solution that continues to provide a service while avoiding having to commit to long-term expediture.Extend the trial? That's an interesting fourth option. I thought it would be a choice of working out a new (permenant) service, back to just boat trains or closing the line altogether. A new permenant service would probably involve consultation, and unless the trial goes to December they probably don't have time to organise one of those. An extension of the trial period, with the same services, would get arround that issue quite nicely.
Yes, that does sound like it might be a likely option.In the current period of limited budgets and financial stress I think that extending the trial would be a neat political solution that continues to provide a service while avoiding having to commit to long-term expediture.
An extension longer than the original trial service? That to me sounds more like making it a permenant part of the current franchise's commitments.Maybe perhaps extending the trial for another few years until the new franchise starts in 2018.
I hope the part about class 150s is not taken forward as I don't consider them appropriate for journeys of over an hour, or limited-stop services.N.P.T.F. said:Replace current service pattern with a two-hourly service to Fishguard, with all trains operating to / from Swansea. Services timed to connect with the Bristol trains at Swansea. Confirm rolling stock strategy for the service (refurbished Class 150s).
(My bold), although item 3 on that list will be a pain with the current rail service, would be better if all trains departed Fishguard Harbour at xx:53 and arrived at xx:27 (both these assuming 20 minute connection time at Fishguard Harbour, allowing for fairly lengthy delays).N.P.T.F. said:Proposed short term measures of relevance to North Pembrokeshire include:
- Higher frequencies, faster journey times and good connections to stations east of Swansea;
- Further growth in rail travel to support the vibrant Swansea Bay City Region economy;
- Co-ordination of bus and rail services in rural areas;
- Adoption of a collaborative approach to introduce a fully integrated ticketing system which includes all bus and rail services;
- Targeted marketing campaigns to promote rail services in the SWWITCH area to ensure that recent patronage growth is continued;
- Retention of the extra Fishguard trains
It probably would only take one extra unit to sort out the big gaps in the Fishguard service, but item 1. on the SWWITCH list above is likely to require a fair amount of extra stock in the lifetime of the current franchise. How do they think that can happen?Hopefully though when additional rolling stock becomes available perhaps the large gaps between services can be pluged
Your bias against 150s is noted once again. Would you prefer to forfeit services rather than use a 150. THERE IS NOTHING ELSE
At the moment there is nothing else, yes, assuming a single 153 doesn't provide enough capacity (which it probably doesn't). So, for now, I'd rather have a 150 than no service.Would you prefer to forfeit services rather than use a 150. THERE IS NOTHING ELSE
At the moment there is nothing else, yes, assuming a single 153 doesn't provide enough capacity (which it probably doesn't). So, for now, I'd rather have a 150 than no service.
Hopefully in the new franchise however things could be different. Certainly when the ValleyLines are electrified the franchise should be trying to obtain different sorts of DMU other than 150s.
Anyway, in the shorter term, while we are stuck with 150s, we still don't know when the current Fishguard trial is due to end.
As far as I am aware TOCs can withdraw services like this any time they want, it doesn't have to be an official timetable change date.Well, it is 2014, the Fishguard trial service ends this year. But when exactly? The 3-year trial started in September, but Septemeber, I recently discovered, isn't an 'official' timetable change. So, is the trial actually going to stop at the May or December timetable change, and if not does anyone know the actual date of the end of the trial?
I think any future inward cascade of "better than 150's" might be a tad difficult with the pace of electrification releasing units elsewhere BUT a big catch up to replace 14x fleets , especially in the Northern area , as there is organic growth in other parts of the UK on regional operations which have a better (sorry) payback than rural Pembrokeshire.
As far as I am aware TOCs can withdraw services like this any time they want, it doesn't have to be an official timetable change date.
No, my comment was purely to do with timetable change dates and the relationship between TOCs and NR.Not if the train services are contracted , or in the SLC (Service level commitment)