It won't let me copy and paste the summary table (section 3.14) http://www.agma.gov.uk/cms_media/files/capital_projects_and_policy_agenda_papers_8_11_13.pdf but in short:
Phase 1 would be:
* Tram-trains on existing Altrincham Metrolink route with no extension to Mid-Cheshire line.
* Marple would be a full tram-train line.
Phase 2 would be:
* Glossop
* Hazel Grove
Possible future options:
* Stockport-Altrincham (with interchange station at Baguley)
* Wigan via Atherton
With regards to the Mid-Cheshire line it says to look at alternative heavy rail options instead. Maybe a Western Airport link? I have thought for a while that the Mid-Cheshire line can't viability have both a tram-train service via Sale on top of a Western Airport link.
Phase 1 would be:
* Tram-trains on existing Altrincham Metrolink route with no extension to Mid-Cheshire line.
* Marple would be a full tram-train line.
Phase 2 would be:
* Glossop
* Hazel Grove
Possible future options:
* Stockport-Altrincham (with interchange station at Baguley)
* Wigan via Atherton
With regards to the Mid-Cheshire line it says to look at alternative heavy rail options instead. Maybe a Western Airport link? I have thought for a while that the Mid-Cheshire line can't viability have both a tram-train service via Sale on top of a Western Airport link.