There's a hell of a lot of short formed trains tonight following a pattern in recent weeks. Any idea why - a result of the storms perhaps damaging trains? Also a fair few train failures this week amidst other problems on the network.
Over recent months dating back to the olympics they had turned performance around since poor showings in 2011 and it has been good.
The problems with short formed really does highlight the need for more trains. I read lots on here on various threads about new stock for southern and south west trains but apart from a mention of 100 new vehicles in September there hasn't been much info about southeastern. I think these are to be 377/1 from southern coming in 2017 aren't they?
I know the London Bridge rebuild has to complete first which offers some interesting questions - before it begins in January some services are supposed to become 12 cars. Where are the extra Networkers coming from and what lines/services will benefit? When the rebuild does begin and with less paths available most if not all services will become 12 cars I assume except those that call at Woolwich Dockyard which can only be 10.
Another problem is that if there is a lack of stock the Victoria to Dartford service seems to take a hit first. That service is absolutely packed solid at rush hour with only 3 trains an hour - worse than many trains leaving central London terminals in my long and painful experience of it. I'm not sure SE realise this with it having to suffer short trains regularly and the first train around 5pm (30 minutes after the previous one) being diagrammed as standard at 4 coaches. Then with the next being short formed as well leads to some crushed conditions. New stock can't come soon enough to strengthen that service.
Over recent months dating back to the olympics they had turned performance around since poor showings in 2011 and it has been good.
The problems with short formed really does highlight the need for more trains. I read lots on here on various threads about new stock for southern and south west trains but apart from a mention of 100 new vehicles in September there hasn't been much info about southeastern. I think these are to be 377/1 from southern coming in 2017 aren't they?
I know the London Bridge rebuild has to complete first which offers some interesting questions - before it begins in January some services are supposed to become 12 cars. Where are the extra Networkers coming from and what lines/services will benefit? When the rebuild does begin and with less paths available most if not all services will become 12 cars I assume except those that call at Woolwich Dockyard which can only be 10.
Another problem is that if there is a lack of stock the Victoria to Dartford service seems to take a hit first. That service is absolutely packed solid at rush hour with only 3 trains an hour - worse than many trains leaving central London terminals in my long and painful experience of it. I'm not sure SE realise this with it having to suffer short trains regularly and the first train around 5pm (30 minutes after the previous one) being diagrammed as standard at 4 coaches. Then with the next being short formed as well leads to some crushed conditions. New stock can't come soon enough to strengthen that service.
Last edited: