33Hz
Member
- Joined
- 2 Dec 2010
- Messages
- 513
As Deutsche Bahn have set the precedent with getting permission to run shorter, multiple units through the Channel Tunnel, how about the same for British operators? After all, if the model for splitting trains at Brussels to continue on 4.5 hour journeys has merit, then about about the same at London?
What about a build of 300+ km/h UK gauge tilt-capable trains that could form the basis for the HS2 "classic compatible" units? Leeds, Manchester, Liverpool, Sheffield and Cardiff will all be wired and 4.5 hours from Paris or Brussels by the end of the decade. They may not individually generate enough traffic for an 18 coach train, but 2 (or even 3) short trains operating in multiple might well be viable.
Yes, I'm aware of the immigration issues - let's assume they can be dealt with if the commercial need is there.
What about a build of 300+ km/h UK gauge tilt-capable trains that could form the basis for the HS2 "classic compatible" units? Leeds, Manchester, Liverpool, Sheffield and Cardiff will all be wired and 4.5 hours from Paris or Brussels by the end of the decade. They may not individually generate enough traffic for an 18 coach train, but 2 (or even 3) short trains operating in multiple might well be viable.
Yes, I'm aware of the immigration issues - let's assume they can be dealt with if the commercial need is there.
If trains from Liverpool, Manchester and Chester/Holyhead (the last only for trains to London, not international services) could pick up additional passengers at Birmingham it'd make through services alot more viable. As it is, Birmingham being on a spur of HS2 messes alot of things up. It messes up the environmental credentials of HS2 also (seriously, sucking enough electricity to do 200mph on a London - Birmingham service which only has 70mph cars to compete with).