PHILIPE
Veteran Member
If 158s didm.t get involved with Ebbw Vale, they wouldn.t come to South Wales at all. All part of a bigger picture.
If 158s didm.t get involved with Ebbw Vale, they wouldn.t come to South Wales at all. All part of a bigger picture.
CT introduced them in summer 2000 on Cambrian Mainline did not go up coast, 2 trains had them 1 key morning departure was 3 car and and a 2 car came down in day and back as well before the 3 car ran down in evening ready for next day. Would have to go tt digging to tell you exact times.
Of course things went backwards when the Wales and Border franchise was created.
I was fortunate to have a ride on 170 639 from Machynlleth to Barmouth on what was then the 10:55 local service they ran it due to the unavailable 153.
Re. anthony and Gareth too:If 158s didm.t get involved with Ebbw Vale, they wouldn.t come to South Wales at all. All part of a bigger picture.
Re. anthony and Gareth too:
While it is annoying to have three 158s (I think) working stoppers to Maesteg and Ebbw Vale, south Wales does need them. I've just been on a short break / railway explore. As I've said many times before, the class 150 is woefully inappropriate for the Fishguard boat train, and this evening I had one on the 16:04 off Cardiff back to Fishguard too. All I can say is: "my poor knees".
Actually, perhaps there is something else I can say, the bus I only just managed to catch after getting off the train at FGW had more legroom (and it was the Fishguard Town Service bus, not one of the superb Optare Tempos YJ55BKE and YJ55BKF).
The 158s probably have to go to Canton occasionally for heavier maintainance they can't do at Machynlleth also don't they?
158s for the Cambrian hourly service should come from cutting the Holyhead - Birmingham in half at Chester and using 175s (released by using LHCS on one or two Manchester diagrams, which is probably the only way to boost the fleet size) on the Holyhead - Chester section (ideally extended to Crewe to make up, at least in part, for north Wales losing the indirect through trains to Birmingnham). Alternativly, if you can get some non-ERTMS 158s from other operators and don't have to cycle the ERTMS units through Canton you could use these on Holyhead - Chester and/or the south Wales workings to release the ERTMS 158s for Cambrian work.
Don't you consider class 150s on journeys of two and a half hours to two and three quarter hours to be a mistake? Or 2-car units on Manchester - Swansea workings? Ok, maybe they aren't DfT mistakes, but they are not right.Loco-Hauled trains are confined to history as I keep on repeating, however much people might suggest using them. They are used only in exceptional circumstances and for a very good reason, i.e. DFT making up for their own mistakes or outside sponsorship as in the case of Gerallt.
Loco-Hauled trains are confined to history as I keep on repeating, however much people might suggest using them. They are used only in exceptional circumstances and for a very good reason, i.e. DFT making up for their own mistakes or outside sponsorship as in the case of Gerallt.
What about Chiltern, modern history there.
What about Chiltern, modern history there.
Rhydgaled said:Don't you consider class 150s on journeys of two and a half hours to two and three quarter hours to be a mistake? Or 2-car units on Manchester - Swansea workings? Ok, maybe they aren't DfT mistakes, but they are not right.
And what about the proposed Cumbrian coast extras DRS are refurbishing mrk2s for?
Exactly, you go with what is available, which brings me to:What about Chiltern? There was no chance of them finding someone to finance a substantial new order of dmus for Oxford services but there was overhauled Mk3 stock and locos owned by Chiltern's parent company available after the demise of Wrexham & Shropshire.
If they could have got money to pay for new-build dmus, I'm sure that's what Chiltern would have opted for without hesitation, given their series of incremental orders for more 168s. In the absence of that money, then you go with what's available
So, if the money is dangled in front of ATW what will they do? Will they go get some suitable stock that is available (LHCS) for north Wales services to release 175s to release 158s from Chester - Holyhead?ATW have quoted WG options running into £ millions to run Cambrian hourly and other derivatives including extra Newtown to Shrewsbury trains. If the WG decide to fund ATW will have to be inventive but the prospect of extra money for them will override any concerns about lack of rolling stock. they will not turn around and say theres no stock if money is dangled in front of them.
But the 150s would be less unsuitable on the Maesteg and Ebbw Vale lines than they are on the Fishguard - Cardiff services, and there are 158s on Maesteg and Ebbw Vale. Swap the 158s off the Maesteg and Ebbw Vale diagrams onto the Fishguard diagrams.The 150s may not be ideal but if that's all there is available then that's how it is - unless, of course, you just don't operate the service and most passengers would rather have a train than no train.
ATW have quoted WG options running into £ millions to run Cambrian hourly and other derivatives including extra Newtown to Shrewsbury trains. If the WG decide to fund ATW will have to be inventive but the prospect of extra money for them will override any concerns about lack of rolling stock. they will not turn around and say theres no stock if money is dangled in front of them.
I recall a senior ATW Manager telling us at a SCRUA open meeting some years ago at Wrexham,"We are ready to commence extra services on the Cambrian,providing WG confirm funding them"
Not sure about Chiltern just using the W/S loco haul sets because they were there, the experience of W/S in using 67s/DVT was was seen by Chiltern as attracting extra business class customers.
IWJ the then WAG Minister modeled Gerald on W/S stock, but rushed in too quickly with the wrong class 57, I recall Andy Hamilton ceo of W/S saying "I would not touch class 57 with a barge pole" plus in my opinion IWJ did no market research on demand for a premier dining service between Holyhead & Cardiff,now reduced to a First class dining service between Rhyl & Cardiff.
Not sure about Chiltern just using the W/S loco haul sets because they were there, the experience of W/S in using 67s/DVT was was seen by Chiltern as attracting extra business class customers.
There was a Temporary Additional 150 covering for a long absent 175002 (I think) following level crossing collision and this covered for a 158 to work vice the 175. This allowed a little flexibility but a 150 was covering the 16 04 ex Cardiff so more by luck than judgement.Thanks PHILIPE for confirming that the 16:04 ex Cardiff is still booked for a 158, that's a relief.
As for the boat train, they managed to diagram a 158 on weekdays one summer (2012 I think). Did anything else change which meant that could not continue?
Didn't the boat train actually run 150 vice 158 for most of the summer because 175002 was absent, with the 158 only being available once 175002 returned?There was a Temporary Additional 150 covering for a long absent 175002 (I think) following level crossing collision and this covered for a 158 to work vice the 175. This allowed a little flexibility but a 150 was covering the 16 04 ex Cardiff so more by luck than judgement.
Yes, I do keep mentioning it. That's because it is one of my pet hates, it really just seems WRONG to have a 150 on it. I'm sorry if you are fed up with me mentioning it but the presence of a 150 on that service really does annoy me, so it is always my favoriate example of inappropriate rolling stock.surely it's time to change the record on the 158 on the Fishguard Boats as it seems to keep on arising from time to time.
So if there wasn't a use for them Chiltern would have dumped them? sorry, but you're not naive enough to believe that.
Yes. You've made your point. I agree a 158 might be more attractive, but the journey time is little over 2 hours and little different from Maesteg to Cheltenham.
And the Maesteg - Cardiff section is an all-stations valley lines service, if that was decoupled from Cardiff - Cheltenham Maesteg - Cardiff would be a much better fit for a class 150. I think Cardiff - Cheltenham, the boat train and 16:04 Cardiff - Fishguard (and the unit's return on 07:09 from Pembroke Dock in the morning) could then by worked by a single 150 (on Cheltenham - Cardiff only) plus the 3 158s. The question is whether that leaves enough 150s to cover Maesteg - Cardiff and Cardiff - Ebbw Vale.You are right, as far as time is concerned, but passengers from Fishguard will be much more likely to be carrying items of luggage and might well be still suffering from the crossing. Something better than a 150 should be expected.
The Maesteg service is not part of the Valleys Network any more and for movement purposes continues on to Cheltenham.