carlejo
Member
Any idea of what stock ATW would be acquiring for when the lines are electrified in the next couple of years ?
Local services on non electrified routes wiill most likely be class 150/158/175's with a plan to have an hourly Cardiff - Chepstow local service in addition to an enhanced Cardiff - Cheltenham service operating via the relief lines to Severn Tunnel Junction serving new stations at St Mellons & Llanwern. These are likely to be interworked with the Cardiff - Holyhead/Manchester services the latter being cut back to terminate at Cardiff rather than Milford Haven.
Then again what happens if the C2C franchise got new rolling stock there will bea lot of class 357's to go around having travelled on them I think if they were fitted with 2+2 seating they would be great consdering they have fast acceleration and can do 100mph.
With regards to an earlier post, there are also murmerings about new stations at Caerleon (between Newport and Cwmbran), Pye Corner (Ebbw Jn and Ty Du) and as mentioned, St Mellons / Wentloog etc, as well as the well overdue extensions to Cwm and Ebbw Vale Town / Abertillery.
Sorry to divert the topic, but have there been murmurings to suggest that 'Essex Thameside' is likely to recieve new stock only 15 years the 357s?
I suppose trains having quicker turnarounds at Cardiff would help the operators FGW's services from Portsmouth Hbr/Taunton have about 40 minutes turnaround is that was reduced to 15 minutes or so you could free up a unit or two for use elsewhere
Plus it is likely that with electrification that the services from Portsmouth Harbour/Taunton will be cut back to Bristol Temple Meads from 2017 in favour fo a new 3 or 4tph shuttle service running between Swansea/Cardiff - Bristol TM & Bath Spa.
The turnaround may also be a mandatory staff break, in which case a 35 late arrival means a late departure.But this route is a long route, so the lengthy turnaround is handy.
At the moment, the incoming service can be 35, say, minutes late and still leave with the next service on time.
Cutting the turnaround time would surely lead to a greater possibility of knock on delays?
I agree I dont think the class 315's will stay long in south wales. At least the GA red & white livery will need little or no changing when they arrive in south wales.
I wouldnt be too surprised if we did end up getting displaced class 321's or something from London Midland/GA in the future if those franchises got new rolling stock.
Then again what happens if the C2C franchise got new rolling stock there will bea lot of class 357's to go around having travelled on them I think if they were fitted with 2+2 seating they would be great consdering they have fast acceleration and can do 100mph.
One of Sewta's idea's if the Beddau - Pontyclun branch is re-opened is for the services to run half hourly crossing each other @ Pontyclun and together with the 2tph from Maesteg provide a 15 minutely interval between Pontyclun & Cardiff.
The use of EMU's will release some capacity on the line between Bridgend and Cardiff so it will be possible to path these enehanced services along with the hourly FGW service to London and the two ATW services which operate non stop between Bridgend & Cardiff along with two freight paths.
The Miskin loops will be upgraded to allow local passenger and freight services to be overtaken by non stopping services.
As many of us have said previously in other threads the Beddau service is very likely to be very popular and the enhanced service between Pontyclun and Cardiff is likely to make Pontyclun station very busy during the peaks.
Local services on non electrified routes wiill most likely be class 150/158/175's with a plan to have an hourly Cardiff - Chepstow local service in addition to an enhanced Cardiff - Cheltenham service operating via the relief lines to Severn Tunnel Junction serving new stations at St Mellons & Llanwern. These are likely to be interworked with the Cardiff - Holyhead/Manchester services the latter being cut back to terminate at Cardiff rather than Milford Haven.
One slightly worrying issue is that DfT is apparently assuming that quite a few Swansea-Paddington services will be covered by 5-car IEPs, replacing 8-car HSTs, which I guess means a reduction in seats ?
I am told that there are no plans to remove or cut back the hourly Manchester-Carmarthen/Milford services, but that many stops west of Cardiff will be cut out to accelerate the service. Presumably these stops would be covered by the proposed hourly electrified Swanline service which is a SEWTA aspiration.
Anyway I can understand why they have decided not to cut back this services as it is very well used by people traveling to Cardiff and beyond by passengers west of Swansea. I do hope though extra stock is brought in to enable the services which at present terminate at Carmarthen to be be extended to Milford Haven as the demand is there.