edwin_m
Veteran Member
Interesting thought, but I think the engineering would be quite tricky. Also you lose the opportunity of onward connections at Central Station (except by making a further change at Monument).
Interesting thought, but I think the engineering would be quite tricky. Also you lose the opportunity of onward connections at Central Station (except by making a further change at Monument).
If you asked the residents of Blyth and Ashington if they would rather have a fast rail service to Newcastle Central Station where you have to change to get to the city center, or one to the city center where they have to change to get to the central station, I wonder which one they would choose.![]()
IMHO the journey times of a Metro style service would not be advantageous, especially for people in Ashington. Also, the cost of electrification and new rolling stock would likely be high.
I feel the best thing right now is to get a heavy rail service set up as cheaply as possible. Once that's up and running, that would be the appropriate time to look at any potential upgrades or add-ons.
IMHO the journey times of a Metro style service would not be advantageous, especially for people in Ashington. Also, the cost of electrification and new rolling stock would likely be high.
I feel the best thing right now is to get a heavy rail service set up as cheaply as possible. Once that's up and running, that would be the appropriate time to look at any potential upgrades or add-ons.
Personally, what I'd like to see is a fast, heavy rail service from Ashington, calling at Bedlington, Bebside, Newsham for Blyth, Seaton Deleval (for the new hospital at East Cramlington) and Seghill; an interchange Station at either Northumberland Park or Palmersville - to allow connection to the Metro system - then Mannors and Central station. .
Not sure why a metro stye service covering the same rout would be slower then a pacer.
Pacers (top speed 75 mph) are considerably faster than Metro trains (50 mph).
45mph linespeed on blyth & tyne !
Have you ever been over the blyth & tyne ?
45 is PLENTY fast enough there !!
Noted, but the study needs to decide whether there is an amount of improvement which is both worthwhile and affordable. Apart from the curves I mentioned and the viaduct over the Blyth which nobody can probably do much about, is the rest all down to track condition or are there other problems? I guess NR may be looking at renewing the signalling too.
The section south of Newsham to Benton Junction has some tight curves (Seghill and New Hartley spring to mind) .
however the section north of Newsham doesnt seem too bad IMO.
AFAIK Network Rail will be looking at resignalling
I believe the GRIP 3 study will look at re-doubling some of the single sections, specifically Newsham - New Hartley.
one mile of extra track ?
what is the point ?
there aren't any passing places !
double off the main line at Benton , single to Newsham then back to double !
like I said before , what is the point of extending the double line for ( less than , really ) a mile ?
Currently the passing places on the route seem to be far enough away from half way between Newcastle and Ashington that (speculatively) you might need three units to provide an hourly service, rather than say two. [Or perhaps even just one if they plan to significantly upgrade things?]
I reckon from doing some really very approximate timings based on freight paths that you'd need something in the long(-ish) single section in the middle to sort that and maintain the ability to run occasional freight.
As I understand it there is a short passing loop just after leaving the main line at Benton then a long single track until somewhere around Newsham which would have to either be shortened or have an intermediate loop to allow a passenger service to run while still keeping capacity for freight. The section alongside Metro probably couldn't be doubled without going outside the railway boundary but the rest of it was originally double so the second track could be put back.
Sorry to be a bit vague, it's a year or more since I looked at this one.
There is a short section in the North West, between Navigation Road station and Altrincham station where one of the two heavy rail lines was taken over by the Manchester Metrolink system and what was originally a two-platform Navigation Road heavy rail station now has two facing platforms with one used for the heavy-rail services and the other used for Manchester Metrolink services.
Most probably, although again I'd doubt that you would be able to get two in (probably not even possible to double track at that point. Also, it would lose the benefit of having a Metro/rail/bus interchange.
You need to see it from Nexus's point of view - i.e. having a different operators trains using its infrastructure and its station, without having any reciprocal benefit. That is, unless Nexus were to levy a track access charge and station charge, along with getting Network Rail to pay for the new connection needed.
You also have the capacity issue of trains crossing over onto the Metro tracks and crossing back a mile or so away, and it rules out any thought of 25kV electrification until the Metro cars are replaced.
I suspect the grassy bank will be dug out carefully and a concrete retaining wall provided to make room for a platform. If we can dig Crossrail tunnels within a few metres of the Underground then some houses on North Tyneside shouldn't be insurmountable.