The redoubling of the six miles of track between Cockett West Junction and Duffryn West Junction was planned before the proposed Wrexham redoubling and has removed a serious bottleneck west of Swansea. It is not as if only one service uses it. All destinations, west of Swansea, have to traverse this section of line and anyone who has used the line in recent years will have experienced many delays whilst waiting for the single line section to clear. In addition, the viaduct across the Llwchwr estuary was in a parlous state and needed to be replaced. The work, of course, meant that the disused platform at Gowerton needed to be reinstated. There has long been a need to increase the number of trains calling at Gowerton because, as has been pointed out elsewhere, it is not simply a village station but serves as a railhead for a considerable catchment area. 95 extra trains a week might sound a lot but, when you break it down, it amounts to about six additional trains a day in each direction. These additional services would have previously run through without stopping because of the constraints on timekeeping caused by the single line section.
--- old post above --- --- new post below ---
I have just had a look at the passenger figures for Gowerton. These have risen from 13,768 in 2006/07 to 77,854 in 2011/12. The footfall will, almost certainly, continue to increase thanks to the improved service now on offer. This compares with the 33,104 using Wrexham Central. Not bad for a village station.
The usual caveats apply; not comparing like with like etc