My idea for AC conversion of Euston to Queen's Park

Status
Not open for further replies.

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
Just a thought, would it make sense for the Watford DC line between Euston and Queen's Park to be converted to OHLE AC? It'd eliminate the requirement for all of the dual voltage infrastructure in and around Euston (instead just having a changeover in the platforms at Queen's Park). Same applies for Willesden to South Acton and Imperial Wharf; as far as I know all of the passenger services that operate on those lines are AC capable. Would it make sense or am I missing something major? :)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
You can't convert the Watford DC line to AC, or they'd have to find a new name for it. Everyone knows that's much more important than any practical reasons.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,707
Location
Nottingham
You can't convert the Watford DC line to AC, or they'd have to find a new name for it.

I don't see why. Liverpool Street still has two lines designated "electric" despite the other four also having been electric for the past half century or so.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
You can't convert the Watford DC line to AC, or they'd have to find a new name for it. Everyone knows that's much more important than any practical reasons.

Weeeeell, strictly speaking the original name would suffice: the "New Lines". They weren't electrified to start with!

1913.jpg
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
Same applies for Willesden to South Acton and Imperial Wharf; as far as I know all of the passenger services that operate on those lines are AC capable.

Willesden Jn to South Acton is already AC.

The peak Southern WLL shuttles are trains that are often DC only and runs as far north as Shepherds Bush, so Imperial Wharf is too far south.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,910
I don't see why. Liverpool Street still has two lines designated "electric" despite the other four also having been electric for the past half century or so.

Curiously, all 4 lines to Shenfield were electrified at the same time (brought into service 31/12/1949). But they were still renamed Mains and Electric, presumably as the electric service usually used those lines.

Back OT, it is indeed the primrose hill tunnels that would need expanding to get the wire in.
 

moggie

Member
Joined
2 Jan 2010
Messages
426
Location
West Midlands
Not sure that LUL stock out of Stonebridge Pk depot will fit on the Bakerloo with a pantograph stuck on the top of it.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
You can't convert the Watford DC line to AC, or they'd have to find a new name for it. Everyone knows that's much more important than any practical reasons.

I don't see why. Liverpool Street still has two lines designated "electric" despite the other four also having been electric for the past half century or so.

I believe the DC Euston-Watford lines too continued to be known as "the electric lines" for years after the WCML was electrified.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
The lines through Sutton are still called the Portsmouth lines, even though Portsmouth services haven't gone that way in a very long time (possibly not since the early 1980s).
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
There are still the Up and Dn North London Electrics at Chalk Farm / South Hampstead.
 

WestCountry

Member
Joined
31 Dec 2010
Messages
334
Location
Cambridge, UK
And where do you see LUL stock operating within 2.75m of OHLE?
But...his proposal doesn't involve any LUL stock operating under OHLE? :| Queens Park has separate LO and LUL platforms.
EDIT: I should make sure I remember what order stations are in before posting... :oops:

Different argument - why would there be a problem operating Tube stock under OHLE? The loading gauge is smaller, so there should be significantly more clearance.

-------

Would it be possible to install this newfangled bar stuff in Primrose Hill tunnels, or is it too tight even for that?
 
Last edited:

ert47

Member
Joined
28 Feb 2010
Messages
688
Different argument - why would there be a problem operating Tube stock under OHLE? The loading gauge is smaller, so there should be significantly more clearance.

Wouldn't it have the same problem as running both 3rd Rail DC and OHLE together over great distances? Something to do with track circuits?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,707
Location
Nottingham
Wouldn't it have the same problem as running both 3rd Rail DC and OHLE together over great distances? Something to do with track circuits?

Any route with DC and AC electrification on the same track or even in close proximity needs special measures to do with earthing and track circuits. The type of train that operates on them makes very little difference. While this proposal might introduce some track with both types of electrification south of Queens Park it would eliminate the same on the approaches to Euston where the amount of complication is much more. It would also open up the possibility of converting Queens Park to Watford to OLE, retaining third rail as far as Harrow and from High Street to Watford Junction.
 

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,213
Location
SE London
Presumably if TfL ever accomplish their longstanding ambition to re-route the Watford DC line to Highbury and Islington, the complications arising from DC at Euston would be solved anyway?
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
If you were going to have Watford trains switching to AC for the last leg into Euston it'd be much easier to have the switchover at South Hampstead, where all the complications around the Bakerloo are removed.

Alas, the problem tunnel is to the east (quasi-south) of South Hampstead so no good.

Presumably if TfL ever accomplish their longstanding ambition to re-route the Watford DC line to Highbury and Islington, the complications arising from DC at Euston would be solved anyway?

Do you know anywhere that TfL have spoken about this ambition? It feels a little speculative of them if they have.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,333
Location
Herts
Not quite sure what you really gain - the DC operation into Euston is not perceived as problem - or very rarely so .....? - the bores off the slows onto the DC at South Hampstead are the constraint concrete lined and quite steep gradients.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,272
Location
Isle of Wight
Presumably if TfL ever accomplish their longstanding ambition to re-route the Watford DC line to Highbury and Islington, the complications arising from DC at Euston would be solved anyway?

I'm not aware that TfL have expressed any such ambition, certainly not in recent years, for there's no obvious business case - even if they had, it can't really be accommodated alongside the current plans for HS2.

As for wiring the DC Line, only the section up Camden Bank would seem a likely candidate.

Chris
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,910
Forgot to say in previous post, we looked at this in the feasibility stage for Euston Remodelling. The saving in third rail and substations was nowhere near enough to pay for the work in the DC tunnels at Primrose Hill.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,707
Location
Nottingham
Forgot to say in previous post, we looked at this in the feasibility stage for Euston Remodelling. The saving in third rail and substations was nowhere near enough to pay for the work in the DC tunnels at Primrose Hill.

Sounds like a definitive answer from someone who knows!
 