• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

My proposal for Cl180s to be reformed as Cl175s

Status
Not open for further replies.

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
We don't want lots more small fleets like 175s or 180s - we need something on the scale of the original HST ambitions.

Given that both those fleets are Coradia family trains, I wonder if in the post-IEP world, the 180s could be downrated to 175s? A little bit of set reforming would convert the fleet into 17 four-car trains and 24 three-car ones. That would eliminate a largely superfluous tiny fleet of 125mph express DMUs (which could be replaced as necessary with a few more bi-modal 5-car IEPs) and instead give us a larger and more flexible fleet of desperately needed 100mph inter-regional DMUs.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,894
Location
West Country
AndyLandy said:
Given that both those fleets are Coradia family trains, I wonder if in the post-IEP world, the 180s could be downrated to 175s? A little bit of set reforming would convert the fleet into 17 four-car trains and 24 three-car ones. That would eliminate a largely superfluous tiny fleet of 125mph express DMUs (which could be replaced as necessary with a few more bi-modal 5-car IEPs) and instead give us a larger and more flexible fleet of desperately needed 100mph inter-regional DMUs.
An excellent idea, I hadn't even considered the idea. Despite being manufactured by the same company, they are such different trains that I completely oversaw the fact they could be integrated.

I too have been concerned that were going to end up with superfluous 125mph D(E)MUs. I mean how easy would this conversion be, would a new cab have to be designed?
 

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
I too have been concerned that were going to end up with superfluous 125mph D(E)MUs. I mean how easy would this conversion be, would a new cab have to be designed?

I don't suppose a new cab would be required going from a 180 to a 175. The 180 cab is longer and more streamlined, presumably because it has the higher running speed. You could arguably create additional seating capacity by replacing the cab with a smaller one, but I wonder whether it's worth the expense.

It will likely come down to how different the underlying traction equipment is between the two train types, and how physically compatible the units are. Given the penchant for modular *MU designs by most manufacturers, I'd hope that there'd be enough similarity in Coradia designs that adapting vehicles from one type to another shouldn't be too hard. As DAB_Move notes, we're already doing something similar with the Class 460 trains, converting them into Class 458s. Interestingly enough, Alstom's Juniper range (of which the 458 and 460 are members) is the EMU version of the very same Coradia trains we're discussing here.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,200
Given that both those fleets are Coradia family trains, I wonder if in the post-IEP world, the 180s could be downrated to 175s? A little bit of set reforming would convert the fleet into 17 four-car trains and 24 three-car ones. That would eliminate a largely superfluous tiny fleet of 125mph express DMUs (which could be replaced as necessary with a few more bi-modal 5-car IEPs) and instead give us a larger and more flexible fleet of desperately needed 100mph inter-regional DMUs.

So like the current 458/460 project? Hmm, sounds interesting... If GC is provided with up to 10 5-car bi-mode IEPs and HT 3-5 electric (assuming Hull is electrified as planned), that would allow, from 2016, the 180s to be freed. If they can be rebuilt and merged into the 175 fleet, that could perhaps give Wales more capacity. They could then release a number of 158s for other operators.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,062
Location
Reston City Centre
Given that both those fleets are Coradia family trains, I wonder if in the post-IEP world, the 180s could be downrated to 175s? A little bit of set reforming would convert the fleet into 17 four-car trains and 24 three-car ones. That would eliminate a largely superfluous tiny fleet of 125mph express DMUs (which could be replaced as necessary with a few more bi-modal 5-car IEPs) and instead give us a larger and more flexible fleet of desperately needed 100mph inter-regional DMUs.

If it could be done then that would be a good thing - there are a number of services/ lines suited to a four coach 100mph DMU (Portsmouth to Bristol/ Cardiff, Liverpool to Nottingham/ Norwich, Manchester Airport to Doncaster/ Cleethorpes, Aberdeen to Glasgow/ Edinburgh, Manchester to Cardiff/ Milford Haven etc).

We are going to have too many 125mph DMUs in a few years (with electrification of the gaps between Manchester and Bournemouth and replacement of the Voyagers running Birmingham - Glasgow/Edinburgh), and have a number of routes where a four coach 100mph DMU would work... nice thinking.
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
According to my Platform 5 DMU book, they are already capable of working in multiple with each other. They have slightly different engines though, 175s have Cummins N14, and 180s have Cummins QSK19 because of the 125mph top speed. I gather intermediate vehicles are almost identical, and the trains have the same bogies and couplers too. You would have to have crashworthy cabs though if you were to fit a new one, so it may be make more sense to retain the existing cabs.

Brilliant idea!
 

Helvellyn

Established Member
Joined
28 Aug 2009
Messages
2,592
A simpler option could be to take the Class 180s and reduce them to four-car formation (remove the First Class coach).

Convert these vehicles to Standard Class and either: -

Insert into the 175/0 units to make them up from 2-car to 3-car (leaves 3 spare Motor cars).

or insert them into 14 of the 175/1 units to make them 4-car units (175101-175114); take the MS from 175116 and insert into 175115 to make a 15th 4-car unit; renumber 175116 as 2-car unit (175012).

The reason I've suggested the above is that the Class 180s Driving cars have a much smaller passenger saloon, so it wouldn't just be a new cab that would be needed but a rebuild of the outer end to extend the saloon. Cheaper to modify the units in this way and create a more versatile fleet.
 

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
A simpler option could be to take the Class 180s and reduce them to four-car formation (remove the First Class coach).

Convert these vehicles to Standard Class and either: -

Insert into the 175/0 units to make them up from 2-car to 3-car (leaves 3 spare Motor cars).

or insert them into 14 of the 175/1 units to make them 4-car units (175101-175114); take the MS from 175116 and insert into 175115 to make a 15th 4-car unit; renumber 175116 as 2-car unit (175012).

The reason I've suggested the above is that the Class 180s Driving cars have a much smaller passenger saloon, so it wouldn't just be a new cab that would be needed but a rebuild of the outer end to extend the saloon. Cheaper to modify the units in this way and create a more versatile fleet.

I'd pondered about formations. I guess there may be better alternatives. My other thought was instead of forming 24 3-car trains, you could form 12 2-cars and 12 more 4-cars. You'd then have a fleet of 29 4-car trains (some 180s, some 175s) and a fleet of 12 2-car trains. Of course, the actual formations would be best decided based on what services they end up providing. :)

Oh, also, I wonder if I'm missing some subtlety in your post. What do your formations do that mine don't?
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
The Coradia "shed" being at Chester limits what realistically you can do with them in terms of integration into 175 fleet, the non standard nature of them and being based in penny packet quantity's has lead to the problems with them.

An alternative is concentrating them on one route and giving them a dedicated depot. Would their be enough of them to do Bristol/Weymouth and Bristol/Portsmouth assuming the Cardiff- Bristol leg goes electric?
 

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
The Coradia "shed" being at Chester limits what realistically you can do with them in terms of integration into 175 fleet, the non standard nature of them and being based in penny packet quantity's has lead to the problems with them.

An alternative is concentrating them on one route and giving them a dedicated depot. Would their be enough of them to do Bristol/Weymouth and Bristol/Portsmouth assuming the Cardiff- Bristol leg goes electric?

Well, I'd be in favour of keeping them all based out of Chester. If nothing else other than I'd love to see Northern running some of them on the Manchester-Chester via Altrincham route! :D

On a more serious note, you are absolutely right that the best way to get any real continued value out of a larger fleet of Coradias is to concentrate them with one operator, over two or three principal routes where they can provide a dedicated service. Wherever you put them, you're bound to displace some 158s which could be redeployed elsewhere.

As you say, the old Alphaline services from Cardiff are probably the ideal sorts of services for these trains. Borderline-Intercity routes that would make an ideal home for a borderline-Intercity train such as the Coradia.

That might in-turn do away with the OCD-displeasing "3-car" 158s that currently run along that route! :lol:
 
Last edited:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
Given that, as I have noted before, the 180s - and the 22xs - spend a great deal of their lives now running at speeds less than 125mph, I really can't see what the point of messing around with them would be.

Especially when it is clear that the new common maintenance routine and support system set up this year by First, Grand Central, Angel Trains and Alstom, is paying off, with clear improvements in reliability in recent months - just a pity this kind of action wasn't taken a decade ago.

Yes, they can do 125mph but a key performance characteristic of both 180s and 22xs is brute power and high acceleration. There are a lot of settings where that is more useful than a 125mph top speed and somewhere like the Highland main line, where I believe there are already some sections of 100mph-plus track, but where power to climb the hills is also critical, would seem a perfectly reasonable place to use a 180, providing a far more suitable train for the route than a 170 and with the potential to cut those rather long journey times between Inverness and Edinburgh/Glasgow as well.

And it frees up 100mph 170s to do other things - without spending lots of money.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,948
Location
Mold, Clwyd
and somewhere like the Highland main line, where I believe there are already some sections of 100mph-plus track, but where power to climb the hills is also critical, would seem a perfectly reasonable place to use a 180, providing a far more suitable train for the route than a 170 and with the potential to cut those rather long journey times between Inverness and Edinburgh/Glasgow as well.
And it frees up 100mph 170s to do other things - without spending lots of money.

100mph is the max speed Glasgow/Edinburgh-Inverness.
Once you are off the Edinburgh-Glasgow main line there are only a few short sections of 100, and mostly the max is 80/85.
North of Perth there is only the one 3-mile section of 100 between Kingussie and Aviemore.
There are plans to reduce journey times but I haven't studied the details.
I doubt if anything above 100mph is contemplated.
Your point about high acceleration is perfectly valid though (applies equally to class 185 and 22x with the same engine).
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
100mph is the max speed Glasgow/Edinburgh-Inverness.
Once you are off the Edinburgh-Glasgow main line there are only a few short sections of 100, and mostly the max is 80/85.
North of Perth there is only the one 3-mile section of 100 between Kingussie and Aviemore.
There are plans to reduce journey times but I haven't studied the details.
I doubt if anything above 100mph is contemplated.
Your point about high acceleration is perfectly valid though (applies equally to class 185 and 22x with the same engine).

But neither type has the 280 seats a 180 offers, indeed 185s have fewer than the three-car 170s which already struggle with demand on Inverness services now, that's why, combined with the performance, I think a 180 might be a useful type of train for the route if they can be freed by electrification further south.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,062
Location
Reston City Centre
I think that 41 units would be able to cope with the ScotRail services from Edinburgh/Glasgow to Aberdeen/ Inverness (inc the Edinburgh - Dundee/Perth semi-fasts). Capable of the 100mph linespeed, capable of running as 3/4/6/7/8 coaches, routes where you could maintain them from one depot (Perth, Dundee) even if some are overnight elsewhere (as happens with the 175s in south Wales).

That would allow Scotrail to run two types of DMU (156s for rural routes like the West Highland Line, Glasgow South Western, Far North, Kyle) and these Coradia hybrids if the Fife circle and Borders line are ever wired. Cue lots of 158s and 170s freed up.

ATW could then get (say) forty of the Scotrail 180s which would have more coaches (80) than the 175s (70), which would give them a single class of DMU for running all long distance routes.

Won't happen, I appreciate, but I like AndyLandy's idea.
 

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
Mostly the idea was to try and do away with the maintenance requirements of supporting a tiny little fleet of 180s. Downrating them to 175s may not be necessary, but there could still be a benefit of having the same TOC leasing both fleets of Coradia, so a common maintenance regime can be provided for them.

As for set re-forming, that would be entirely down to whatever route(s) the eventual TOC responsible for them puts them on.
 

TheGrew

Member
Joined
31 Jul 2012
Messages
519
Would the Edinburgh-Inverness line benefit from Tilting stock (subject to clearances) if so would it make more sense to cascase the 221s from Virgin or Cross Country (though has it been disabled/removed on the latter).
 

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
Would the Edinburgh-Inverness line benefit from Tilting stock (subject to clearances) if so would it make more sense to cascase the 221s from Virgin or Cross Country (though has it been disabled/removed on the latter).

Don't forget that tilting provision requires more than cascading a few Super Voyagers to a line. TASS would need to be installed along the line as well, that may just push the cost outside the realms of feasibility.
 

SeanG

Established Member
Joined
4 May 2013
Messages
1,378
I think that the 175s on the Manchester - West Wales and Manchester - North Wales services are one o the few examples of rolling stock entirely suitable for the route
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,894
Location
South Wales
I agree the class 175's are ideal for the Manchester - North/South wales services. They are only let down by being 2 carriages without end gangways unlike the class
158's.

Somebody dont fancy asking Alstom if they could design a new cab which has an end gangway (Actually better yet do we really want something that will look as bad as the class 458/5's?).

As for the class 180's if they are available I wouldnt mind them being taken on by the Wales and Borders franchise since Chester do a great job with the clas 175's so I am sure they could manage to sort out the class 180's. The bad point would be that a 5 carriage class 180 would be a waste between Swansea & Milford Haven.

Perhaps one of the trailer carriages could be removed reducing them to 4 carriage units and inserted into a 2 carriage class 175 rake although this might not be technically possible. All the units should be refurbished to allow extra seats to be installed where possible
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
Somebody dont fancy asking Alstom if they could design a new cab which has an end gangway (Actually better yet do we really want something that will look as bad as the class 458/5's?).

I'm not sure the drivers of the units would be happy with that. The cab would likely become more claustrophobic which I can't see being pleasant on some relatively long journeys.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,866
Given that both those fleets are Coradia family trains, I wonder if in the post-IEP world, the 180s could be downrated to 175s? A little bit of set reforming would convert the fleet into 17 four-car trains and 24 three-car ones. That would eliminate a largely superfluous tiny fleet of 125mph express DMUs (which could be replaced as necessary with a few more bi-modal 5-car IEPs) and instead give us a larger and more flexible fleet of desperately needed 100mph inter-regional DMUs.
The 2-car 175s are certainly rather hard to find suitable jobs for. Routes that only need 2 coaches don't often need top speeds above 75mph. I didn't think of using the 180s (I assume it would be too difficult to convert the 180 driving vehicles into anything else) but taking the cabs off some 175 driving vehicles and reforming them into 4-car and 3-car sets (instead of 2-car and 3-car currently) would make them more useful.

If it could be done then that would be a good thing - there are a number of services/ lines suited to a four coach 100mph DMU (Portsmouth to Bristol/ Cardiff, Liverpool to Nottingham/ Norwich, Manchester Airport to Doncaster/ Cleethorpes, Aberdeen to Glasgow/ Edinburgh, Manchester to Cardiff/ Milford Haven etc).
Indeed, I agree with 4-car 175s for any of those.

You would have to have crashworthy cabs though if you were to fit a new one, so it may be make more sense to retain the existing cabs.
the Class 180s Driving cars have a much smaller passenger saloon, so it wouldn't just be a new cab that would be needed but a rebuild of the outer end to extend the saloon.
We are going to have too many 125mph DMUs in a few years (with electrification of the gaps between Manchester and Bournemouth and replacement of the Voyagers running Birmingham - Glasgow/Edinburgh), and have a number of routes where a four coach 100mph DMU would work...
Could you convert the class 180 driving vehicles to intermediate cars? Assuming you could release all 14 180s from their current duties you would then get 70 intermediate cars for 175s.

Actually, maybe it would be better to work the other way:
  • 22 intermediate cars would lengthen the 11 2-car 175s to 4-car sets.
  • 16 intermediate cars would lengthen the 16 3-car 175s to 4-car sets.
  • Total: 38 additional intermediate cars required

With three intermeidate cars in each 180, you have 42 coaches. So you wouldn't actually need to convert the driving cars after all. You'd have 4 spare intermediate trailers left. If you fit cabs to two of these you could create a 28th 4-car 175 set.

Of course the driving cars would go to waste, but they have a smaller passenger saloon anyway so you don't lose so many seats. The same is true of the 22x series units, in my opinion they seriously need to lengthen the sets to make them more useful. Taking the intermediate coaches from some sets to lengthen other sets and storing the driving cars seems the best way forward unless you can turn the driving cars into intermediate vehicles.

Going back to the 28 class 180 driving vehicles, it strikes me that is only a few vehicles short of the 31 mrk4 DVTs. If my information is correct there are only 26 IC225 diagrams, so perhaps you could swap the DVTs for class 180 driving trailers (with the engine removed, TDM fitted to talk to the 91s and ETRMS fitted). There are two possible problems with that though, would a class 180 driving trailer be good for 140mph (the rest of the IC225 should be) and what would a class 180 driving trailer look like coupled to a mrk4?

I'd pondered about formations. I guess there may be better alternatives. My other thought was instead of forming 24 3-car trains, you could form 12 2-cars and 12 more 4-cars. You'd then have a fleet of 29 4-car trains (some 180s, some 175s) and a fleet of 12 2-car trains. Of course, the actual formations would be best decided based on what services they end up providing. :)
2-car isn't really useful if it doesn't have corridor connections on the ends for portion working (that's why 158s are so great and 175s are a bit silly in my opinion).

somewhere like the Highland main line
...
would seem a perfectly reasonable place to use a 180, providing a far more suitable train for the route than a 170 and with the potential to cut those rather long journey times between Inverness and Edinburgh/Glasgow as well.
That idea also sounds like a good one.

And it frees up 100mph 170s to do other things - without spending lots of money.
Ah, but 170s to me are like Voyagers: a mistake. With Voyagers, they are designed for intercity work but are much too short for that purpose. With 170s, they reportedly have sluggish acceleration for services with long distances between stops (regional express work) but an outer-suburban door arrangment that is only suitable for stoppers or possibly short-distance services like the Crewe-Chester shuttle.

Any chance the acceleration of 170s can be improved to make them suitable for stopping services (in which case you can give them to Northern or Great Western to replace Pacers and 150/1s)? I imagine fixing the acceleration would be easier than fixing the door layout.

ATW could then get (say) forty of the Scotrail 180s which would have more coaches (80) than the 175s (70), which would give them a single class of DMU for running all long distance routes.
I think you mean ATW would get 40 158s from Scotrail, not 40 180s.

Don't forget that tilting provision requires more than cascading a few Super Voyagers to a line. TASS would need to be installed along the line as well, that may just push the cost outside the realms of feasibility.
Isn't TASS only required if tilt would put the coaches out of loading guage in places? Do the 221s tilt as far as Pendolinos, if not you might find it's alright? Or you could check if there are any structures which a tiliting 221 would hit on the route you want to use them on and if it's clear just confine 221s to that route.

I think that the 175s on the Manchester - West Wales and Manchester - North Wales services are one o the few examples of rolling stock entirely suitable for the route
Not really. If they were longer, they would be ideal, but 2-car just isn't long enough.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
People still seem to be obsessed with tearing apart perfectly serviceable trains, of all types, at enormous expense. This isn't some sort of plug-and-play process, witness all the work that's involved in the Class 460 to 458 conversions under way at the moment, financially and in terms of metal-bashing, etc. It wasn't a project undertaken lightly. If the reliability of the 458s had not been transformed in the past few years, I think SWT would have just got straight on the phone to Siemens for more 450s, rather than sign up for the conversions.

Ah, but 170s to me are like Voyagers: a mistake. With Voyagers, they are designed for intercity work but are much too short for that purpose. With 170s, they reportedly have sluggish acceleration for services with long distances between stops (regional express work) but an outer-suburban door arrangment that is only suitable for stoppers or possibly short-distance services like the Crewe-Chester shuttle.

The 170s are the result of a project to produce a 'do quite of lot of things' dmu design post-privatisation. Several operators decide to go with something based on the proven 16x design, rather than go with Alstom (lucky them, given the grief caused by the 175s and 180s over the years). It may not be purpose-built either as a suburban stopper unit or an inter-regional unit but it does okay in either role.

With the spread of electrification, diesel trains like the 170, that can do both jobs, will remain very valuable, but they struggle to cope with demand now on Scotrail's routes between the main cities and 180s would give a boost to capacity, comfort and performance here - without needing to be torn to bits.

That said, Grand Central remains the obvious future home, even if there are probably four or five more 180s than they would want based on current needs, though if they have their eye on things like serving Huddersfield direct from London by splitting a pair of 180s at Mirfield (subject to a swifter method of coupling and uncoupling sets in service being devised), if they can't get paths for the WCML plans, then who knows?

Rhydgaled said:
Of course the [180] driving cars would go to waste, but they have a smaller passenger saloon anyway so you don't lose so many seats.

No, just about 100 seats per pair of driving cars out of 280 seats on the trains as currently configured, and 28 coaches with years of life left in them. As for turning them into DVTs, I wonder what will they do with all those unwanted diesel engines...?

Rhydgaled said:
Isn't TASS only required if tilt would put the coaches out of loading guage in places?

No, it tells the train when it is safe to tilt and regulates the train speed. Not that the Highland main line has ever struck me as somewhere crying out for tilting trains anyway and all that scenery would be a lot easier to see out of a 180 than a 221.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Are the 180s/175s suitable for the WHL?

If so, I'm thinking...

DMS-MS-DMS(175)-DMS(175)-MS-MS-DMS/F

Converting a 180 MF to a MS and a 180 DMS to a Composite DMs/F

Front four coaches to Fort Bill, rear 3 coaches to Oban
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,867
Location
Beeston (Notts)
My proposal may sound completely unrelated, but how about we order for XC a new Pendo e.g. "Class 391" that can displace the Voyagers, and we electrify Edinburgh-Aberdeen, then the Voyagers can ALL be used on the HML. As for the WHL, I think it all depends upon the weight of the train, as heavier trains e.g. the Cl.67 loco, have to go slowly, as only brushwood supports the trackbed over the bog on Rannoch.
--- old post above --- --- new post below ---
Would the Edinburgh-Inverness line benefit from Tilting stock (subject to clearances) if so would it make more sense to cascase the 221s from Virgin or Cross Country (though has it been disabled/removed on the latter).

Also, I read on Wikipedia that XC's Voyagers have had their tilt equipment disabled, not removed, so shouldn't be too hard to re-enable. And I guess their window height could also be increased during that time- a fault I've noticed we've had with everything here that tilts and doesn't get stuck.
 
Last edited:

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,866
People still seem to be obsessed with tearing apart perfectly serviceable trains, of all types, at enormous expense.
Perfectly servicable but not necessarily suitable for anything. At least we are trying to suggest ways of reconfiguring perfectly servicable trains to make them more useful unlike DaFT which is replacing perfectly servicable IC225s with brand new trains at even more enormous expense. The latter is likely to see perfectly serviceable class 91s torn apart, by the scrapman.

The 170s are the result of a project to produce a 'do quite of lot of things' dmu design post-privatisation. Several operators decide to go with something based on the proven 16x design, rather than go with Alstom (lucky them, given the grief caused by the 175s and 180s over the years). It may not be purpose-built either as a suburban stopper unit or an inter-regional unit but it does okay in either role.
I disagree, 170s don't do ok in a regional express role and I would expect there are others you would say the acceleration makes them useless in a stopping role (although that's where I'd tend to want to put them).

As for turning them into DVTs, I wonder what will they do with all those unwanted diesel engines...?
Diesel engines which will be 15 years old by the time this happens, if it does. Not the same as throwing away IEP engines after just 2-5 years service.

Are the 180s/175s suitable for the WHL?

If so, I'm thinking...

DMS-MS-DMS(175)-DMS(175)-MS-MS-DMS/F

Converting a 180 MF to a MS and a 180 DMS to a Composite DMs/F

Front four coaches to Fort Bill, rear 3 coaches to Oban
Maybe, if you change the cabs on the class 175 DMS vehicles to add corridor connections between units. Would the 100mph top speed be of use on the route though? If not, you might as well leave them alone and use 2-car 175s on the HOWL.
--- old post above --- --- new post below ---
Also, I read on Wikipedia that XC's Voyagers have had their tilt equipment disabled, not removed, so shouldn't be too hard to re-enable.
My understanding is that part of the tilting mechanism had been taken off and replaced with a solid metal bar. The part which was taken off is probably still sitting in a store room in case it is ever needed again though.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
My proposal may sound completely unrelated, but how about we order for XC a new Pendo e.g. "Class 391" that can displace the Voyagers, and we electrify Edinburgh-Aberdeen, then the Voyagers can ALL be used on the HML. As for the WHL, I think it all depends upon the weight of the train, as heavier trains e.g. the Cl.67 loco, have to go slowly, as only brushwood supports the trackbed over the bog on Rannoch.

Your '391s' are presumably the Baby Pendolinos suggested for after VT's Super Voyager lease is finished? I don't think there will be enough of the Cross Country routes electrified before it's not worthwhile to order more of circa 2000 trains.

Electrification of the Fife Circle is an inevitability and will require the Forth Bridge to be done as well. Once that's done there's no point not continuing further but this can only happen after all the EGIP plans are finished (probably including East Kilbride too). I personally think the WHL should be electrified as part of the modernisation which will hopefully come with the rollout of ERTMS Regional, maybe even only in parts as any new replacement for the 156s will be bi-modal. It would be a great bargaining chip for the environmentally minded when they need to double the A82.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,129
Location
Redcar
My understanding is that part of the tilting mechanism had been taken off and replaced with a solid metal bar. The part which was taken off is probably still sitting in a store room in case it is ever needed again though.

They most certainly will be. The trains have to be able to be returned to the same condition that they were originally in at the start of the XC franchise so the tilt has to be capable of being refitted (so do the buffet's by the by).
 

D7666

Member
Joined
12 Aug 2013
Messages
998
slightly different engines though, 175s have Cummins N14, and 180s have Cummins QSK19

Cummins N series is a completely different engine type to a Q series.


This isn't some sort of plug-and-play process, witness all the work that's involved in the Class 460 to 458 conversions

Actually it is, or is supposed to be. That is the ENTIRE point of the Coradia model range. 458/460 is a poor example as the complete transformation they are doing now alters not only the ratio of cabs:cabless cars but also motor:trailer cars. Even so, it is much much easier to do this with Coradias than ever it would be with Electrostars and Desiros. Alsthom designed Coradia to be rebuilt this way, Siemens and Bombardier did not.

I would not bother to alter 175/180 as DMU.

I'd rebuild the 180 as tractor EMU to work with 175s rebuilt into trailer sets. There is a lot you could do on WCML / ECML and even GEML with appropriately fitted 67s and now 68s push-pulling trailers to non electrified destinations.

--
Nick
 
Last edited:

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
People still seem to be obsessed with tearing apart perfectly serviceable trains, of all types, at enormous expense.

Indeed, I don't think it's worth the expense to remodel the actual vehicles. Reforming the 180s into 4-car sets to increase the length of the 175 fleet still might be a practical way forward, if the trailers are sufficiently similar to not need much modification.

Downrating the 180s to 175s may well be unnecessary, and your point about the higher power of the 180s being useful for more than just top speed is a rather pertinent one.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,062
Location
Reston City Centre
Perfectly servicable but not necessarily suitable for anything. At least we are trying to suggest ways of reconfiguring perfectly servicable trains to make them more useful unlike DaFT which is replacing perfectly servicable IC225s with brand new trains at even more enormous expense. The latter is likely to see perfectly serviceable class 91s torn apart, by the scrapman.

Please.

Do you think that the HC 360s are going to be scrapped just because they are being replaced by younger stock (345s)?

Will TPE 185s be scrapped when the main Transpennine line is electrified?

So why do enthusiasts assume that the midlife Class 91s are going to get scrapped (when 800/801s come along)?
 
Status
Not open for further replies.

Top