JamesRowden
Established Member
I have already posted this in the 225s to GEML thread.
I have just done some maths to look at the possibility of the MML and the GEML getting new stock and the 91s, mark 4s and 90s being handed over to Cross Country to operate electric spine services with a route being electrified between Sheffield and the ECML early in CP6.
My idea for Cross Country Electric Spine Service Pattern
Total: 32 trains in service
I guess that about 35 sets are needed to cover spares.
This means that the 248 mark 4 carraiges could be distributed between services with 7 carraiges per set plus a DVT (some refurbished GEML mark 3 DVTs would be used to account for the lack of mark 4 DVTs).
This allows the locamotives to be distributed:
This solution seems better than transfering the 225s to the MML and/or GEML because it allows trains to be built for the capacity/performance requirements of those lines and allows the 225s to be used on routes where the lack of capacity due to DVTs is not a problem. The extra storage space in DVTs would probably suit those who are using the Cross Country services.
I have just done some maths to look at the possibility of the MML and the GEML getting new stock and the 91s, mark 4s and 90s being handed over to Cross Country to operate electric spine services with a route being electrified between Sheffield and the ECML early in CP6.
My idea for Cross Country Electric Spine Service Pattern
- Bournemouth - Birmingham - Manchester 5hrs (11 trains)
- Heathrow - Birmingham - Liverpool 3hrs30m (8 trains)
- Southampton - Oxford - Bedford - Sheffield - Newcastle 6hrs (13 trains)
Total: 32 trains in service
I guess that about 35 sets are needed to cover spares.
This means that the 248 mark 4 carraiges could be distributed between services with 7 carraiges per set plus a DVT (some refurbished GEML mark 3 DVTs would be used to account for the lack of mark 4 DVTs).
This allows the locamotives to be distributed:
- 26 91s (Bournemouth - Manchester, Southampton - Newcastle)
- 10 90s (Liverpool-Heathrow)
This solution seems better than transfering the 225s to the MML and/or GEML because it allows trains to be built for the capacity/performance requirements of those lines and allows the 225s to be used on routes where the lack of capacity due to DVTs is not a problem. The extra storage space in DVTs would probably suit those who are using the Cross Country services.
