Could this be due to anything discussed on the "Class 377/6 - more info" thread? Hillstart button position and suchlike...
Last edited:
The leasing companies prefer a 20m unit because it maximises the chances of hiring the train to another TOC elsewhere in the country if the original operator does not renew the lease. This is also one of the reasons why all recent orders have been dual voltage or easily convertable. Less of an issue for DMUs as most of the routes not cleared for 23m stock are south of London - though there are a few elsewhere including some in the Cardiff Valleys.
It would be interesting to know how much infrastructure actually needs changing, and at what cost, to run 23m stock more widely. RSSB have done some studies on gauge but I don't think they've looked at that question. With better infrastructure data and less conservative methods of gauging it's possilble that a lot more of the network could be made accessible to 23m vehicles at relatively low cost. Though of course an operator like Southern they probably wouldn't be interested until all their network was cleared.
Another possible issue is that the 23m stock based on the Mk3 coach dimensions is a bit narrower than 20m stock, which could make a difference particularly with 2+3 seating. Classes 165 and 166 are wider than other 23m stock and therefore more restricted in where they can operate.
FGW will need emu's for the Thames Valley branches as well as local services from Raeading to Bassingstoke/Newbury & Bedwyn as well as for use between Reading & Oxford/Banbury.
Of course with the electric spine some of the GW locals which terminate at Oxford could be extended to Milton Keynes/Bedford. You also have the possibility of local services from Reading to Heathrow although these may be operated by crossrail.
The GW franchise could also use emu's for some services between Bristol & Cardiff/Swansea
So reading to basingstoke will be wired up?
Sorry if mentioned but what does this mean for conductors post cascade given they are DOO on thameslink
--- old post above --- --- new post below ---
So reading to basingstoke will be wired up?
Sorry if mentioned but what does this mean for conductors post cascade given they are DOO on thameslink
Londons commuters deserve a first class rail network and comfortable modern trains, Southern is delivering that. This second order will also provide a further boost to the thousands of passengers who travel into London every day.
A successful rail network is vital for the economic prosperity of the country and its standing in the global race. The fact that these trains are made in Britain also protects jobs outside of the capital.
We are delighted that the order we have signed today will help our industry grow. Southern has a great record in new train introduction and we are pleased to be able to offer our expertise in helping the Department for Transport deliver the benefits of the Thameslink programme.
Meanwhile, Southern is currently testing its new fleet of carriages ahead of their introduction on the network just 2 years after the deal with Bombardier was signed. This will allow up to 10 car trains to run on some of the operators busiest Metro routes, including trains via Norbury, Streatham Hill and Hackbridge, boosting capacity by 10%.
Getting the trains built, tested and in service within a 2 year time scale is setting a new record for train delivery, but we and Bombardier are determined to provide our passengers with the longer trains they have been promised.
It is great to see the first of Southerns 130 new carriages being delivered here today. Production of the rest of the order is progressing on time in Derby. We are confident of delivering the rest of the fleet in line with Southerns requirements and meeting their challenge of getting these units ready for passenger service later this year.
The order underlines the strength of the relationship Bombardier has with Southern and the DfT a relationship born out of our strong performance on existing contracts. It reinforces the quality of our products and our ability to deliver on time to demanding schedules. It is further evidence of the dedication and skills of our people in the UK.
Were delighted to have been appointed financier for the purchase of these new Electrostar trains which will operate with the other 792 Electrostar vehicles we have on lease with Southern. We reiterate our hope that this is only the start of ongoing investment opportunities in new and existing rolling stock over the coming years as franchises are re-let.
The company ran a second open competition in December 2012 for 116 carriages, with the option of a further 140 if further investment opportunities can be identified
I was worried that the announcement of the "116" may have been a good time to drop references to the "140", so good to see that the "follow on" is still on the agenda.
The company ran a second open competition in December 2012 for 116 carriages, with the option of a further 140 if further investment opportunities can be identified. Bombardier was announced as the preferred bidder earlier this year, with the contract being agreed this month.
The wording struck me as strange.
As they trying to work out who could afford to take on a fleet of 64 dual voltage units? TPE with eight car SDO services would make sense. Unless of course MML services gets them. Derby gets stick with Derby built trains......
Southern Fleet Director Gerry McFadden said:Getting the trains built, tested and in service within a 2 year time scale is setting a new record for train delivery, but we and Bombardier are determined to provide our passengers with the longer trains they have been promised.
The wording struck me as strange.
As they trying to work out who could afford to take on a fleet of 64 dual voltage units? TPE with eight car SDO services would make sense. Unless of course MML services gets them. Derby gets stick with Derby built trains......
That sounds like subject to ROSCO signing up to me, i.e. the ROSCO have to be convinced that there is a customer for them after 3-4 years with Thameslink.
Which might in turn be reliant on the re-franchise process and increased service levels.
My guess is that they would be split between 2 TOCs. For example Southeastern are apparently interested is some more EMUs (thread from several months ago).
Also TPE wouldn't be able to use all the 256 until some electrification in CP6 was done.
Does anyone want Bombardier wanting to try and set a new record?!
Or will they build them in record time and then tighten up the screws and bolts when they're in service?
At least if they ran on the MML, the stops at Derby could turn into "pit stops" with a handful of people standing on the platform with spanners to tighten everything up as they pass through?![]()
Seems to be the general opinion that the 110mph units will be heading to FGW
Two years from order placed until full fleet delivered for fleet of units using an existing design and different power collections from the last order. Hardly challenging.
But as everything GW is using a 2 track railway from Maidenhead to Paddington with Crossrail using the slow lines, 110mph will reduced capacity for GW services.
But as everything GW is using a 2 track railway from Maidenhead to Paddington with Crossrail using the slow lines, 110mph will reduced capacity for GW services.
Where are you getting that from? GW will definitely be running on the reliefs, as will freight trains. That's why they are installing all those additional freight and passenger loops. There's nothing to support your belief that the reliefs will be reserved for Crossrail - and this has never been the case.
How late were the 377/5s?
Where are you getting that from? GW will definitely be running on the reliefs, as will freight trains. That's why they are installing all those additional freight and passenger loops. There's nothing to support your belief that the reliefs will be reserved for Crossrail - and this has never been the case.
From the documents that I have read, Great Western Paddington-Reading stoppers will run along the relief lines with Crossrail.
The present Paddington-Oxford stoppers (2tph) will probably be converted into fast services east of Reading (using the new viaduct to avoid crossing mainline paths). A similar service will probably run on the Newbury line. These services will require non-intercity stock and 100 mph units would use up more capacity than 110 mph units.
However the Reading to Paddington stoppers will become part of Crossrail not GW once the electrification works are completed, although not set in stone.
Other operators’ services are assumed to be:
2 trains per hour from Reading calling at Twyford, Maidenhead, Slough, Hayes & Harlington and Ealing Broadway to Paddington;
2 trains per hour from Reading calling at Twyford, Maidenhead, Taplow, Burnham and terminating at Slough;
1 through train from Henley on Thames to Paddington; and
1 through train from Bourne End to Paddington
http://www.crossrail.co.uk/route/surface/western-section/
Trying to find where I'd read that, might actually be from Airport junction not Maidenhead.
However the Reading to Paddington stoppers will become part of Crossrail not GW once the electrification works are completed, although not set in stone.
However the Reading to Paddington stoppers will become part of Crossrail not GW once the electrification works are completed, although not set in stone.
It is Network Rail who are suggesting that the rolling stock will need to be 110mph capable to optimise capacity.But as everything GW is using a 2 track railway from Maidenhead to Paddington with Crossrail using the slow lines, 110mph will reduced capacity for GW services.
However the Reading to Paddington stoppers will become part of Crossrail not GW once the electrification works are completed, although not set in stone.
The present Paddington-Oxford stoppers (2tph) will probably be converted into fast services east of Reading (using the new viaduct to avoid crossing mainline paths). A similar service will probably run on the Newbury line. These services will require non-intercity stock and 100 mph units would use up more capacity than 110 mph units.