• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

East Coast IEPs Ordered - Class 800

Status
Not open for further replies.

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,571
Location
Macclesfield
wasnt aware of the changes to train supply. I was still under the impression though that they were planning to run a lot of them as 5 car, cramming us in like cattle so that they make less train hold more?↲
To be fair, the thirteen 9-car Bi-mode trains that East Coast are getting to replace the HSTs would actually be sufficient to work all of the “off wires” services that East Coast presently operate, given that there are a few HST diagrams at present that are completely under the wires.

However, I like the flexibility that the small number of 5-car trains offer to better cater to demand on services that are likely to be more lightly loaded at their extremities:

It certainly seems like there is the capacity available in the East Coast IEP order to run a 5-car Bi-mode train from an off-wires origin (I cannot envisage that a full 9-car train is really need to cater for the early morning demand from Harrogate, for example), which then combines with a 5-car electric set (Or another Bi-mode running on electric power) at a strategic location where the service meets the wires, such as Leeds, and then continuing on to London as a 10-car train.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
wasnt aware of the changes to train supply. I was still under the impression though that they were planning to run a lot of them as 5 car, cramming us in like cattle so that they make less train hold more?↲

As I understand it the EC order now stands at:
- 13 x 9-car Bi-mode trains
- 30 x 9-car electric trains
- 12 x 5-car electric trains
- 10 x 5-car Bi-mode trains

And I think those are daily diagrams rather than the total fleet?
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,571
Location
Macclesfield
And I think those are daily diagrams rather than the total fleet?
No, I am reasonably confident that those figures are the total fleet size, it is just the mealy-mouthed way that the DfT and Hitachi have announced the order sizes that has caused confusion: Otherwise, based on the number of carriages being built, Hitachi would be building train fleets without any maintenance spares and expecting 100% availability and reliability every day!
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
No, I am reasonably confident that those figures are the total fleet size, it is just the mealy-mouthed way that the DfT and Hitachi have announced the order sizes that has caused confusion: Otherwise, based on the number of carriages being built, Hitachi would be building train fleets without any maintenance spares and expecting 100% availability and reliability every day!

Hmm, I thought I read that the DfT will procure X daily diagrams, and it'll be up to Hitachi to decide how many units are required to meet that. Although I can imagine changing the announcement figures to units to be constructed would be tempting to the DfT as it'd be a higher number!
 

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
The whole point of bi-mode operation is that DEMU-based discomfort and disturbance will be minimised as much as possible with the diesel engines running only when the trains go off-wire (so for EC Doncaster-Hull, Leeds-Harrogate, Newark-Lincoln, Edinburgh-Inverness/Aberdeen based on the current timetabled services). Of course diesel loco haulage is nicer for atmosphere than DMU/DEMU operation but it's difficult to argue against the acceleration improvements that multiple units offer vs loco haulage. Bi-mode is perhaps the best compromise, certainly better than voyager or meridian operation under the wires.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,885
Location
UK
Am I being really stupid for thinking bi-mode is a good ideas, as you order a massive new fleet and can then gradually use it more and more in electric mode as the lines are wired up?

Can't the diesel tanks be removed in years to come to reduce weight if they're no longer needed?
 

SkinnyDave

Established Member
Joined
11 Mar 2012
Messages
1,242
I am glad they have got bi mode, it's senseless having HST running under the wires all because of the last parts of their diagrammed journey.

Does anyone know how quickly they will be able to switch modes?
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Am I being really stupid for thinking bi-mode is a good ideas, as you order a massive new fleet and can then gradually use it more and more in electric mode as the lines are wired up?

Can't the diesel tanks be removed in years to come to reduce weight if they're no longer needed?

I think the idea of the Bi-Modes is they can be transferred to all electric routes by removing the Diesel engine, unless I've been asleep though past DAFT announcements....
 

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
The bi-mode units will have underfloor diesel engines to operate on non-electrified routes, which DfT said 'is estimated to save around £200m' compared with using all-electric trains hauled by diesel locomotives beyond the wires. The diesel engines can be removed if electrification is extended in the future.

Source
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,176
So, is the 12x5 (x26m) electric batch for Cambridge Express/Kings Lynn? Will 5-car IEPs double up from Kings Cross? (in this case to Cambridge, as is currently done with the 365s) Also, will all 40 365s still be needed on additional GN suburbans after Thameslink? (I'm looking forward to the refurb!)

Presumably FHT will consider their own batch of 3-5 similar IEPs if they get their way on Hull electrification and track access.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,571
Location
Macclesfield
So, is the 12x5 (x26m) electric batch for Cambridge Express/Kings Lynn?
No, the Cambridge & Kings Lynn services are a further option that has not been taken up yet.
--- old post above --- --- new post below ---
Presumably FHT will consider their own batch of 3-5 similar IEPs if they get their way on Hull electrification and track access.
I would like to see regular London to Hull services brought into the East Coast franchise following IEP introduction, as an extension of the current 2-hourly Newark terminators. Certainly the original East Coast IEP order made provision to “replace the current IC125 (HST) trains, resource additional services” and “develop secondary flows where appropriate, including taking advantage of the IEP bi-mode capability to serve new locations”.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
No, the Cambridge & Kings Lynn services are a further option that has not been taken up yet.
I believe the other remaining options are the Paddington - Exeter - Plymouth - Penzance route and the London to Northampton route. I don't think the London - Sheffield/Nottingham route is an option so any order for new stock on this route would have to go to tender throughout the EU in which case I would have though Alstom, Bombardier and Siemens would be interested in bidding.
 
Last edited:

broadgage

Member
Joined
11 Aug 2012
Messages
1,094
Location
Somerset
Am I being really stupid for thinking bi-mode is a good ideas, as you order a massive new fleet and can then gradually use it more and more in electric mode as the lines are wired up?

Can't the diesel tanks be removed in years to come to reduce weight if they're no longer needed?

Agree, I have misgivings about these trains as regards passenger comfort, capacity, and internal layout, but fully support the idea of bi-mode operation.
If in years to come the units are to be used on fully electrified routes, then yes some of the engines can be removed. I would presume that one or two engines would be retained on each train, remembering that the nominly electric trains are to be so equiped.

I doubt that the money spent on the engines would be wasted, since if not already life expired they could be used as replacements.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,176
No, the Cambridge & Kings Lynn services are a further option that has not been taken up yet.

Alright, but what is this batch for then; I always though the Cambridge/Kings Lynn option was that size, or requiring that many units in service.

I would like to see regular London to Hull services brought into the East Coast franchise following IEP introduction, as an extension of the current 2-hourly Newark terminators. Certainly the original East Coast IEP order made provision to “replace the current IC125 (HST) trains, resource additional services” and “develop secondary flows where appropriate, including taking advantage of the IEP bi-mode capability to serve new locations”.

That would really turn up the heat on FHT, can't imagine them being too happy.

(Kings Cross suburban platforms might be useful in the future as they are able to take 5x26m (130m) trains - they currently handle 8x20m (160m))
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,571
Location
Macclesfield
Alright, but what is this batch for then; I always though the Cambridge/Kings Lynn option was that size, or requiring that many units in service.
The DfT have made vague reference to using the East Coast IEP order to:
• develop secondary flows where appropriate, including taking advantage of the IEP bi-mode capability to serve new locations;
• improve the match between service provision and demand, particularly where services are lightly used
Nothing more specific as to exactly which services would use 5-car and which would use 9-car trains though, as far as I know, as it is up to the bidders for the new franchise to propose how best to utilise the new train fleet.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Hmmm Sunderland and Middlesbrough could potentially benefit massively. Two 5 cars to each town split/join off ECML to save more paths...

Who knows! I think we are likely to see places off the map get served more maybe to extract revenue from OAO which east coast dislike... and also to make sure the Bi-modes are seen to be a benefit.
 

MCW

Member
Joined
30 Dec 2011
Messages
699
Location
Leicester UK
Agree, I have misgivings about these trains as regards passenger comfort, capacity, and internal layout, but fully support the idea of bi-mode operation.
If in years to come the units are to be used on fully electrified routes, then yes some of the engines can be removed. I would presume that one or two engines would be retained on each train, remembering that the nominly electric trains are to be so equiped.

I doubt that the money spent on the engines would be wasted, since if not already life expired they could be used as replacements.

another aspect which in which it is useful to keep the diesel units in the odd carriage is in the case of an overhead line outage. That way the trains won't be stranded.

I will be very interested to see the proposed specs of the diesel units (for which o shall check the dft document later). I personally wouldn't be surprised if the engines were somehow related to the very successful Cummins engines as used in the voyagers meridians and 180/185....
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
another aspect which in which it is useful to keep the diesel units in the odd carriage is in the case of an overhead line outage. That way the trains won't be stranded.

I will be very interested to see the proposed specs of the diesel units (for which o shall check the dft document later). I personally wouldn't be surprised if the engines were somehow related to the very successful Cummins engines as used in the voyagers meridians and 180/185....

Not sure if thie is detailed enough, but does give some basic details:
http://www.globalrailnews.com/2012/09/20/mtu-to-deliver-e200m-iep-engine-contract/

Tognum subsidiary MTU has been awarded a 200 million euro contract to supply 250 700kW diesel powerpacks for Britain’s Intercity Express Programme (IEP).

The contract, which was formally announced at InnoTrans yesterday (September 19), also includes 27.5-year servicing agreement for the powerpacks, which will be tailored to the 12V 1600 R8oL engines in the new Hitachi Super Express Trains.

In July (2012), the British Government announced that it had signed a £4.6 billion contract with Hitachi-led consortium Agility Trains for 596 new IEP carriages to replace the ageing fleet of Intercity trains.

Hitachi Rail Europe will supply and maintain the entire fleet of 92 trains, which will eventually run on the East Coast Main Line and the Great Western Main Line.

The new rolling stock will consist of a mix of electric and bi-mode trains, which will enable them to run on both electrified and non-electrified routes. All trains will be fitted with at least one 700kW MTU Powerpack with Series 1600 12-cylinder engine, providing self-rescue capability and hotel power for the electric trains.
 

Kettledrum

Member
Joined
13 Nov 2010
Messages
804
I believe the other remaining options are the Paddington - Exeter - Plymouth - Penzance route and the London to Northampton route. I don't think the London - Sheffield/Nottingham route is an option so any order for new stock on this route would have to go to tender throughout the EU in which case I would have though Alstom, Bombardier and Siemens would be interested in bidding.

Does anyone know if there is a legal way around this? If IEP proves to be a big success, it would be a shame if the trains couldn't be used on the MML route. Could the Government order even more IEP trains for the East Coast Main Line and then cascade some 2-3 year trains onto the newly electrified MML?

I'm a firm believer in minimising the costs of procurement exercises, and making the tenders sufficiently flexible to enable additional call off orders without a full blown re-tendering exercise.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
On a related note the existing ROSCO's are disappointed (well there's a surprise) by the new order:

Rolling stock leasing company Eversholt Rail has said it is “disappointed” that the government has chosen purchase new rolling stock rather than upgrade the current fleet of Intercity 225s.

The Department for Transport (DfT) yesterday (July 18) confirmed an order for 30 new trains worth around £1.2 billion as part of Phase 2 of the Intercity Express Programme (IEP).

Eversholt Rail said in a statement that it was disappointed by the announcement and the way it dictated to the future franchise holder what rolling stock it would have to operate on the line.

“We continue to believe that the best option would have been to let the market decide,” said Eversholt.

“On that basis we put forward a very compelling proposition to modernise the existing IC225 fleet with refurbished Mk IV carriages and new traction systems. This would have offered substantial cost savings, greatly improved levels of comfort and service for East Coast passengers and state-of-the-art on-board technology.

“We believe that refurbished Mk IV rolling stock remains an attractive option when other rail franchises are re-let, including Midland Mainline and Greater Anglia, and we look forward to discussing our offer with potential bidders in due course.”
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
Does anyone know if there is a legal way around this? If IEP proves to be a big success, it would be a shame if the trains couldn't be used on the MML route. Could the Government order even more IEP trains for the East Coast Main Line and then cascade some 2-3 year trains onto the newly electrified MML?

I'm a firm believer in minimising the costs of procurement exercises, and making the tenders sufficiently flexible to enable additional call off orders without a full blown re-tendering exercise.

The IEP, Thameslink (Siemens) and Crossrail orders are supposed to be the last ones made by the government (DfT or TfL) directly.
Anything else (like the Southern Thameslink top-ups, or LM/TPE 350s) will be ordered by the TOCs. Of course the DfT has to clear the principle of new stock in advance, but will not do the ordering.
The Merseyrail situation is interesting because the procurement will be by a PTE.
 

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
Am I being really stupid for thinking bi-mode is a good ideas, as you order a massive new fleet and can then gradually use it more and more in electric mode as the lines are wired up?

Yes, agreed, bu not only that, you also have the flexibility to operate an end to end service with the bi-mode fleet should wires come down as they did earlier this year on the ECML - move your fleet around, 80-100% service retained despite track power issues.

Genius in my mind !
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,649
Location
Nottingham
Does anyone know if there is a legal way around this? If IEP proves to be a big success, it would be a shame if the trains couldn't be used on the MML route. Could the Government order even more IEP trains for the East Coast Main Line and then cascade some 2-3 year trains onto the newly electrified MML?

I'm a firm believer in minimising the costs of procurement exercises, and making the tenders sufficiently flexible to enable additional call off orders without a full blown re-tendering exercise.

If DfT have an option in the order for more vehicles then they could take that up and use it as they wish. Otherwise it would be a new procurement, though Hitachi could offer the IEP as a proven design and (if it was suitable, successful and cost-effective) would have every chance of winning.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,054
Location
Reston City Centre
Two questions:

When did the much maligned 390s suddenly become great? Now that another batch of intercity trains is being ordered, enthusiasts have started to complain that IEP won't be as good as the hallowed Pendolini (which ignores the fact that they've spent the past decade complaining about 390s). If this Forum had been going 35 years ago it'd have been full of people moaning that these newfangled HSTs aren't as good as the Deltics they replaced...

When are we going to have the first argument about the colour of the seats? Since IEP is being slated for everything else (e.g. not every seat will have a perfect view, not every seat will have a table... things which people conveniently ignore about the current HST/225s running on the ECML).

I think there's been too much unsubstantiated criticism of the internal arrangements all along - such as people referring to them as Voyager clones etc...

Agreed.

A lot of the problems with Voyagers are to do with capacity (Voyagers were a lot shorter than the trains that they replaced - a nine coach IEP is going to have 10% more capacity than a 225) and the cramped design caused by the need to tilt (e.g. Voyagers have poor overhead luggage racks, IEP won't tilt so that's not an issue)

its a 21st century redesign of the voyager

Its voyager MK2!

No its not. Its a 26m coach which will run under electric power when under the wires, won't suffer from a narrow body (because it doesn't tilt) and will be longer than the trains that it replaces

I mean 5 cars? On the ECML?

For portion working etc, yes. Do you think that we need to send a nine coach train to Harrogate/ Skipton etc?

Hull Trains seems to cope with five coach trains on all of their services, so maybe portion working a Hull train with one for somewhere else each hour would be a good use of paths south of Doncaster?

pendos are at least not just 5 cars long with under floor engine noise all the time

Underfloor engine noise all the time? No - they'll be EMUs under the wires.

cramming us in like cattle

Cattle with more legroom than on the 225s that they'll replace, you mean?

The whole point of bi-mode operation is that DEMU-based discomfort and disturbance will be minimised as much as possible with the diesel engines running only when the trains go off-wire (so for EC Doncaster-Hull, Leeds-Harrogate, Newark-Lincoln, Edinburgh-Inverness/Aberdeen based on the current timetabled services). Of course diesel loco haulage is nicer for atmosphere than DMU/DEMU operation but it's difficult to argue against the acceleration improvements that multiple units offer vs loco haulage. Bi-mode is perhaps the best compromise, certainly better than voyager or meridian operation under the wires.

I agree with that. No perfect option (until we electrify to Inverness etc and become an all electrified country), so give me bi-mode for the next generation.

Am I being really stupid for thinking bi-mode is a good ideas, as you order a massive new fleet and can then gradually use it more and more in electric mode as the lines are wired up?

Can't the diesel tanks be removed in years to come to reduce weight if they're no longer needed?

I agree - we can either use bi-mode to allow incremental electrification (i.e. doing Edinburgh to Dundee would allow the "electric" mode to be used further north, even if the wires aren't up all the way to Aberdeen - rather than the "all or nothing" approach that we currently have) or we can take out the engines and convert some bi-mode trains to "100% electric".

That would really turn up the heat on FHT, can't imagine them being too happy

Hull Trains have only got the paths for a few more years - they've no permenant right to them.

Eversholt Rail said in a statement that it was disappointed by the announcement and the way it dictated to the future franchise holder what rolling stock it would have to operate on the line.

“We continue to believe that the best option would have been to let the market decide,” said Eversholt

Dear Eversholt - do you honestly think that "the market" can decide at the moment? Virtually every TOC is lumbered with the stock that it inherits - it can only introduce new trains once its been running the franchise for a few years. This way, the trains can get ordered and built without waiting for the TOC/franchising process. Much better. Unless you were hoping on making more pots of money from us?
 

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
Ah, new Diesel engines on the UK network...

The contract, which was formally announced at InnoTrans yesterday (September 19), also includes 27.5-year servicing agreement for the powerpacks, which will be tailored to the 12V 1600 R8oL engines in the new Hitachi Super Express Trains.

Ponders the possibility of a new 2/3/4 car DMU order !
 

Erniescooper

Member
Joined
27 Mar 2010
Messages
518
So, is the 12x5 (x26m) electric batch for Cambridge Express/Kings Lynn? Will 5-car IEPs double up from Kings Cross? (in this case to Cambridge, as is currently done with the 365s) Also, will all 40 365s still be needed on additional GN suburbans after Thameslink? (I'm looking forward to the refurb!)

Presumably FHT will consider their own batch of 3-5 similar IEPs if they get their way on Hull electrification and track access.

Given that FHT have already done their sums and come to the conclusion that they would be better spending £60 million on electrification rather than Bi-mode IEP I would be surprised if the business case for the same train minus a couple of engines would much better .
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
The IEP, Thameslink (Siemens) and Crossrail orders are supposed to be the last ones made by the government (DfT or TfL) directly.
The question here though is if it still counts as a public service procurement even if ordered by the franchised TOC since they operate under a public service contract with the government. For example water companies are in the private sector but still subject to EU procurement rules.
 
Last edited:

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
Although shorter, suburban DMUs probably won't require 940hp power units as are being fitted to the IEPs! :p

Ha Ha ! I've got visions of a Pacer GTi ! 5 point harnesses in all seats, bangin stereo, big bore exhaust up the side like a dodge viper, hyperspace type affect when leaving stations, passengers suffering temporary blindness from deceleration into stations ;)

Perhaps not !
 
Status
Not open for further replies.

Top