carriageline
Established Member
- Joined
- 11 Jan 2012
- Messages
- 1,897
If the sun is beating down on a metal product for hours on end, it's going to be hotter than the air. Take your car for example.
This is ridiculous I'm delayed by an hour now just because its 25 degrees out.
I'm not an engineer, I'm a customer. However it cannot be beyond the wit of someone to lay rails that don't distort in moderate heat, that can design an electrical supply system that continues during cold and frosty weather, that is capable if lopping trackside trees down.
Clearly it is beyond the wit of man. Otherwise it would already have been implemented. Duh.
I guess the folks who run trains through Arizona are not men then?
If the sun is beating down on a metal product for hours on end, it's going to be hotter than the air. Take your car for example.
Why is this? Why are some areas prone to this, whereas others less so?
I've never been particularly sure of this, but one factor has got to be how much sunlight it receives (the hottest part of the day is mid-afternoon, so unshaded lines running SW to NE will get the worst of the sun). But there's got to be more factors to it than that.

I guess the folks who run trains through Arizona are not men then?
The answer could be to run the water jetter as they do during leaf fall and spray the rails with water to cool them, now there is a good idea.
Now this seems like a rather neat system and worth a trial.
Cue the rail haters and anti-rail haters (and the anti-anti-rail haters et al)
So why doesn't the TGV run at 35 kph on hot days? I remember leaving Avignon on a hot day and we reached Paris on time after travelling at a good old lick. And it is not as hot as Arizona in the south of France every day - I've been there (Provence) on days when it is cool, and days when it is very windy (as in Mistral windy).
Maybe we should take a tip and learn from from Les Grenouilles...
It's insurmountable in this country because it's prohibitively expensive for the size of problem it is.
Happy now?![]()
How long do you think the effect would last?
If you could get enough water on the rail to cool it sufficiently what sort of stress would the rapid cooling have on the rail?
What sort of speed would the water cannon train need to run at to cool the rails effectively?
What happens to the passenger trains that would normally be using the line the water cannon is travelling (very slowly) on?
Who picks up the delay minutes?
Of course we would all prefer to arrive late than not at all, but in recent years there does seem to have been an increase in hot weather delays.
Yesterday though the hottest day of the year so far was by no means exceptional as compared to previous years.
The delays seemed quite substantial, with a number of cancellations, overcrowding, and according to newspaper reports, buses instead of trains for one branch.
I dont remember this being such a problem years ago.
So why doesn't the TGV run at 35 kph on hot days? I remember leaving Avignon on a hot day and we reached Paris on time after travelling at a good old lick. And it is not as hot as Arizona in the south of France every day - I've been there (Provence) on days when it is cool, and days when it is very windy (as in Mistral windy).
Maybe we should take a tip and learn from from Les Grenouilles...
Cue the rail haters and anti-rail haters (and the anti-anti-rail haters et al)
So why doesn't the TGV run at 35 kph on hot days? I remember leaving Avignon on a hot day and we reached Paris on time after travelling at a good old lick. And it is not as hot as Arizona in the south of France every day - I've been there (Provence) on days when it is cool, and days when it is very windy (as in Mistral windy).
Maybe we should take a tip and learn from from Les Grenouilles...
How many sets of points and how sharp are the curves on that line?
I mean lets compare a very old, very complicated, very curvy section of a very busy commuter railway with a straight piece of modern high speed line! :roll:
How do the ordinary lines in France compare with their 3 trains a day?
Could just deploy slab track with the rails and slab painted white.
But slab track would cost quite a bit of money despite it probably saving money overall in generally reduced maintenance and the like. (Since the slab is infinitely more resilient than loose piles of stone)
In other words, there are a large number of partial solutions but the accountants undoubtedly believe it is cheaper just to put up with it.
How many sets of points and how sharp are the curves on that line?
I mean lets compare a very old, very complicated, very curvy section of a very busy commuter railway with a straight piece of modern high speed line! :roll:
How do the ordinary lines in France compare with their 3 trains a day?