http://www.railwaygazette.com/news/passenger/single-view/view/sncb-pulls-out-of-v250-deal.html
Originally supposed to be in service by 2008, finally entered service in 2012 last January services were suspended because of reliability problems and Ansaldo given three months to fix the problems, SNCF also commisioned an independent review of the class alongside the other user NS Hispeed which found:
Thats got to be a significant financial hit for Ansaldo if both cancel your talking 207m Euros of lost revenue and the production and design costs of the class lost and potentially damages for lost revenue and costs incurred by the former clients.
Mind you continues the long history of dubiously built Italian trains and trams.
EUROPE: Belgian train operator SNCB announced on May 31 that it had decided to cancel its contract with AnsaldoBreda for the trouble-prone V250 'Albatros' high speed trainsets and seek full reimbursement of the 37m it has paid so far. It may also decide to sue for damages.
Originally supposed to be in service by 2008, finally entered service in 2012 last January services were suspended because of reliability problems and Ansaldo given three months to fix the problems, SNCF also commisioned an independent review of the class alongside the other user NS Hispeed which found:
Mott MacDonald had found 'a surprising level of corrosion' on both bodyshells and wheelsets, as well as poor and haphazard cable routing, pipework and cable retention methods, which 'would not be expected from a competent international rolling stock manufacturer'. The consultants also felt that 'the vehicle end structure (up to and below coupler level) is not robust and is flawed in many aspects of its design', to the extent that 'it is not considered to be suitable for long term operations.'
..
The consultants concluded the trains would require extensive modifications, and in some cases partial redesign, which 'would require significant additional investment and lead to further delays', of at least 17 months. They also raised concerns over the financial strength of AnsaldoBreda's parent group Finmeccanica, which could impact on the availability of spares and maintenance support in the longer term. As a result, Descheemaecker said, the SNCB board had decided to invoke a clause in the contract providing for cancellation if the delivery of the trains had been delayed by more than nine consecutive months.
NS Hispeed is continuing to review its position and expects to reach a decision by mid-June.
Thats got to be a significant financial hit for Ansaldo if both cancel your talking 207m Euros of lost revenue and the production and design costs of the class lost and potentially damages for lost revenue and costs incurred by the former clients.
Mind you continues the long history of dubiously built Italian trains and trams.