Hi when leaving Oxford today south on the A40 before it becomes the M40, does anyone know what disused line the grey concrete abutments are about 5 miles or so south of Oxford? Cheers
There was a central pier to that bridge, but it was removed with the M40 extension works. The road used to pass through a single brick arch bridge before the Wheatley bypass was opened.
I did not realise how easy it would be to reconnect the Thame line.
Hi when leaving Oxford today south on the A40 before it becomes the M40, does anyone know what disused line the grey concrete abutments are about 5 miles or so south of Oxford? Cheers
I did not realise how easy it would be to reconnect the Thame line. Why, when it was the most direct line to London, was it allowed to die? Now we have a new expensive round-the-houses project to do the same it seems?
If the line takes off, then eventually it will be back on the cards again. The section between Oxford and and Bicester will be quite a bottleneck with freight, EWR, and Chiltern services on it, and I doubt adding a 3rd or 4th track through the Wolvercote tunnel is any easier than finding a new alignment via Thame.![]()
It will never be on the cards again, give up on it. Oxford to Bicester won't be a bottleneck, it will be twin track, 100mph and 3 minute headways, you'll be able to chuck loads down there. Oxford to Didcot is where it will clog up.
Definitely a dead duck now. In addition to what has already been mentioned, Horspath Tunnel is now a bat habitat and there is some encroachment onto the trackbed west of Thame station site as well. Removing the very popular Phoenix Trail would generate huge opposition too. It was only ever a single line, the Bicester option is far superior.
Oxford to Didcot used to be four track - most of the way, if not all. When I first came to Oxford in the early 60s they were dismantling the "Slow" up and down lines, even then rusty, overgrown and delapidated. Have a look at the formation - it is wide enough to re-lay them - I think all the way to Didcot. Couple of bridges over the Thames to widen, I think, but could be done. Won't be a bottleneck then.
No it wasn't. The wide formation ends at the former junction for the Abingdon branch and even then the main line only had two tracks through Radley station.