Apologies if this is in the wrong place or already posted.
It appears that Hearts CC and the department for transport are no longer considering converting the abbey line to light rail use. Apparently the difficulties of reassigning land and other issues were too difficult.
See http://www.hertsdirect.org/docs/pdf/a/alnews6.pdf
It appears that Hearts CC and the department for transport are no longer considering converting the abbey line to light rail use. Apparently the difficulties of reassigning land and other issues were too difficult.
See http://www.hertsdirect.org/docs/pdf/a/alnews6.pdf
I think it's a shame as the line would be much useful with a higher frequency....having looked into the possibility of taking the line out of Network Rail ownership and separating it from the London Midland franchise, it became clear that there were some significant obstacles. Issues around the structure of the national rail industry and national fare structures dating back to the British Rail days have proved very complicated to unpick.
The proposal turned out to be considerably more complicated than originally expected and we have found that it is not possible to deliver light rail within the available funding.
The Abbey Line Project Board (including Network Rail, DfT and HCC) has concluded that it is not possible to deliver a more frequent service for the same cost as the current service. Therefore, the DfT has decided to step back from the plan to transfer the line to HCC aswell as the decision to convert the line to light rail at this point in time...