PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
Following the "discovery" of a 132kV cable buried across the line at the proposed Tweedbank Station site in 2010, the plans had to be altered. I am not sure if the final plans which IIRC include the ability to handle charter trains have incorporated the rather expensive relocation of the cable.

Photo of warning sign here: http://www.scot-rail.co.uk/photo/scaled/10949/

If the cable is still in place under the solum, that would be a bit inconvenient for any extension towards Melrose.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fegguk

Member
Joined
11 Sep 2012
Messages
181
Location
Hawick
Following the "discovery" of a 132kV cable buried across the line at the proposed Tweedbank Station site in 2010, the plans had to be altered. I am not sure if the final plans which IIRC include the ability to handle charter trains have incorporated the rather expensive relocation of the cable.

Photo of warning sign here: http://www.scot-rail.co.uk/photo/scaled/10949/

If the cable is still in place under the solum, that would be a bit inconvenient for any extension towards Melrose.

Moving the cable would be a fairly small portion of the bill for extending the line to Hawick, not a deal breaker but another weight against the econmic case. It will presumably eventually need to be replaced its over 30years old.

They have had to move the station 4 meters to accomodate the cable and have apparently made alterations to the plans to accomodate charter trains. The engineering plans on the Borders railway website do not show any run round facilities, it is dated last year so may not be fully up to date. Charter trains could be top and tailed offcourse, the other concern relating to the was around platform length which look to be 6 coaches on the plan.
 
Last edited:

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
From the Campaign for Borders Railwebsite
http://campaignforbordersrail.wordpress.com/2012/11/06/another-campaign-success-for-cbr/

Today’s historic announcement of the Borders Railway contract signing by Transport Scotland and Network Rail also brought confirmation of the success of CBR’s campaign (together with the Waverley Route Trust) for Tweedbank station to be redesigned to accommodate tourist charter trains.
The Tweedbank terminus platform tracks will now be extended to 285m length, enabling commercially viable 12-coach charters to use the Borders Railway – and bringing in new visitor spend to attractions such as Sir Walter Scott’s Abbotsford, Melrose and the Borders abbeys.

Charter trains without retention tanks will presumably be able to make use of a sign saying

132kV - DANGER of DEATH
Please do not flush the toilet while the train is in the station
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,265
Location
Isle of Wight
Charter trains could be top and tailed offcourse, the other concern relating to the was around platform length which look to be 6 coaches on the plan.

The CBR have confirmed that there won't be a run-round, though with dynamic loops set out for 170's it's been suggested it might not be practical to path charters anyway.

Chris
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
Article on BBC Scotland today: http://www.bbc.co.uk/news/uk-scotland-22510460

Joining the Borders railway dots after 40 years

The Borders Railway Project will connect the Borders with Edinburgh for the first time in 40 years.

The scheme involves the construction of seven new stations, the laying of 30 miles of track and dealing with 137 bridges along the way between Waverley station and Tweedbank.

Hugh Wark, from Network Rail, said it is partly thanks to the good work of the Victorians whose bridges and viaducts still stand today.

BBC Reporting Scotland's Cameron Buttle has been given special access to the works which stretch from Edinburgh to Galashiels.
 

Zoidberg

Established Member
Joined
27 Aug 2010
Messages
1,270
Location
West Midlands
What I think is an interesting development is reported in today's Edinburgh Evening News at http://www.scotsman.com/edinburgh-e...il-link-150m-plan-for-penicuik-spur-1-2927786

An extract:

Borders rail link: £150m plan for Penicuik spur

A VITAL £150 million rail line connecting Penicuik to central Edinburgh could be reopened for the first time in half a century.

Heriot-Watt University has been asked to carry out a feasibility study into opening ten miles of rail line that would allow passenger trains to run into Penicuik off the new Borders rail link.

At least six miles of the potential route have been preserved as a rail corridor and already crosses the City Bypass, meaning the project could come in cheaper than early estimates of £150 million.

One option being considered is for the rail link to connect Penicuik to the new Shawfair station being built on the 35-mile Borders rail route running from Waverley to 
Tweedbank.

The feasibility study requested by Midlothian Council is due to be completed next year.
 

michael769

Established Member
Joined
9 Oct 2005
Messages
2,007
It is probably pie in the sky, but would make a lot of sense given it's potential to divert commuters away from a fairly congested section of the road network.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,269
Wouldn't running trains there eat up capacity meant for Tweedbank?

How are they going to fit the extra trains in.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Wouldn't running trains there eat up capacity meant for Tweedbank?

How are they going to fit the extra trains in.

Could make them extensions of the Fife–Newcraighall trains (which according to the current plans will remain separate from the Edinburgh–Tweedbank ones).
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,391
Location
A typical commuter-belt part of north-west England
Following the "discovery" of a 132kV cable buried across the line at the proposed Tweedbank Station site in 2010, the plans had to be altered.

Why was this cable not noticed at a much earlier stage in the proceedings. A 132kV cable is something that is not exactly one that would not be not clearly shown in any documentary evidence that was examined in the very early stages of research work on this project.
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
Could make them extensions of the Fife–Newcraighall trains (which according to the current plans will remain separate from the Edinburgh–Tweedbank ones).

I thought the Newcraighall services would become the Tweedbank services? I.e. Tweedbank-Glenrothes.
 
Last edited:

railjock

Member
Joined
30 Jun 2012
Messages
373
I thought the Newcraighall services would become the Tweedbank services? I.e. Tweedbank-Glenrothes.


They will. Don't think there is any extra capacity east of waverley for additional services at present.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Wouldn't running trains there eat up capacity meant for Tweedbank?

How are they going to fit the extra trains in.

Beyond the Dalkeith area, the "Borders" trains really won't be that busy - Dalkeith is the "steak", Galashiels is the "sizzle".

Something that increases the number of services from Edinburgh to Shawfair is a good thing - there should be plenty of capacity through Newcraighall - the issue is the tunnels outside Waverley.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Something that increases the number of services from Edinburgh to Shawfair is a good thing - there should be plenty of capacity through Newcraighall - the issue is the tunnels outside Waverley.

Thinking outside the box, perhaps we could send it west from Waverley instead and round the Suburban line. Reopen Blackford station and add some platforms on the suburban at Newcraighall.
 

michael769

Established Member
Joined
9 Oct 2005
Messages
2,007
Why was this cable not noticed at a much earlier stage in the proceedings. A 132kV cable is something that is not exactly one that would not be not clearly shown in any documentary evidence that was examined in the very early stages of research work on this project.

Problem is that the plans of underground services are woeful. Either the contractor will not follow them and puts the service in the wrong place, or they scrawl a vague line on an OS map and hand it it the office where it gets transcribed into an official survey.

And that's in the unlikely event there is a plan....

In built up areas underground excavations are an absolute nightmare as you usually have no idea what is down there and 9 times out of 10 the first you know about it is when the shovel hits something. It is easy to look to blame someone but a lot of services have been down there for decades. Less common in a more rural area, but it still happens. There is a reason why so much of that kind of work is still done by hand.

In this case they would have known there was a cable somewhere in the area, but i'll lay odds the plan they got from the power company had it nowhere near where it was found.

There is a centralised register for this stuff now and things are improving, but it will be 20-30 years (or longer in rural areas) before all the legacy stuff that is down there is located and mapped.
 

railjock

Member
Joined
30 Jun 2012
Messages
373
Thinking outside the box, perhaps we could send it west from Waverley instead and round the Suburban line. Reopen Blackford station and add some platforms on the suburban at Newcraighall.

Journey time to central edinburgh would be too long if that was to happen.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,391
Location
A typical commuter-belt part of north-west England
Thinking outside the box, perhaps we could send it west from Waverley instead and round the Suburban line. Reopen Blackford station and add some platforms on the suburban at Newcraighall.

Your comment about reopening the closed railway station of Blackford has confused me somewhat, as this was the next station to Gleneagles on the Scottish Central Railway.

Were you thinking of the closed railway station of Blackford Hill in Edinburgh ?
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
Journey time to central edinburgh would be too long if that was to happen.

Could that be eased by terminating/returning Northbound Borders services operating one way round the loop created by the 'Sub', possibly on a 'tidal flow' basis? It might free up some paths at least- vital if the Penicuik branch somehow manages to be tacked on and given the green light by Holyrood!
 
Last edited:

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,265
Location
Isle of Wight
They will. Don't think there is any extra capacity east of waverley for additional services at present.

Are you sure it's not the west end? That's surely the end that's seen the majority of extra services into Waverley in recent years.

Chris
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Are you sure it's not the west end? That's surely the end that's seen the majority of extra services into Waverley in recent years.

Chris

At the moment the eastern end of Waverley sees (up to):

  • 2x EC to London
  • 1x XC to Plymouth
  • 2x FSR to North Berwick/ Dunbar
  • 2x FSR to Newcraighall (extending to Midlothian/ Borders in a few years)
  • ?x freight (though there's the "sub" for this too)
So, not a huge amount compared to some double track lines in the UK (look at Partick station!) - I presume that the speed differentials/ poorly co-ordinated services (and the flat crossings) are the main problem?
 

alexf380

Established Member
Joined
6 Mar 2011
Messages
1,415
Location
Musselburgh, Scotland
If the Penicuik branch is approved, would it not be possible to double up the units and have them split (one portion to the Borders, one to Penicuik) at Shawfair or Dalkeith or wherever the junction would be located? It works fine in the South East.
 

railjock

Member
Joined
30 Jun 2012
Messages
373
If the Penicuik branch is approved, would it not be possible to double up the units and have them split (one portion to the Borders, one to Penicuik) at Shawfair or Dalkeith or wherever the junction would be located? It works fine in the South East.

The junction would need to be around Shawfair as the 'proposal' is based around the line that went through Loanhead and not the one through Bonnyrigg. Personally I think it's a non-starter.
 

railjock

Member
Joined
30 Jun 2012
Messages
373
Whilst we are in that general area, what is the general condition of the Bilston Glen viaduct like these days ?


Refurbished and turned into a walkway between Roslin and Loanhead about 10 years ago. I remember getting a dmu up there on a rail tour to Bilston Glen colliery in the early 80s. The line stopped just short of the viaduct then though.
 