Brighton Station £5m remodelling work starts

Status
Not open for further replies.

GatwickDepress

Established Member
Joined
14 Jan 2013
Messages
2,588
Location
Leeds
http://www.bbc.co.uk/news/uk-england-sussex-21274813
BBC News said:
_56012510_dsc_0551.jpg

Brighton Station was built in 1840

Work on a £5m project to remodel Brighton Station to allow better views of the historic train shed has started.

The project will also include twice as many ticket gates, a new ticket office and a cafe.

The WH Smith building inside the station will also be demolished and the departure boards will be moved to allow uninterrupted views of the station.

Southern Railway said the station would "once again" be the station it was designed to be.

The third archway at the entrance and exit will also be opened up to allow better access.
Somewhat minor work compared to other stations, but it'll be nice to see happen all the same.

Incidentally, can anyone date the image from the BUPA banner? I can not for the life of me ever remember seeing that.

Mods, I couldn't see this posted already, but feel free to delete if it exists.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,378
Location
Yorks
They could do with moving the track for platform 2 over to where the engine release road used to be and widening platforms 1 & 2.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,296
They could do with moving the track for platform 2 over to where the engine release road used to be and widening platforms 1 & 2.

It isn't that sort of project. It's purely about retail and concourse facilities, as the planning drawings describe, linked to by MattE2010 above.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,378
Location
Yorks
It isn't that sort of project. It's purely about retail and concourse facilities, as the planning drawings describe, linked to by MattE2010 above.

They could still do with penciling it in for some time. It can't be very good for passenger flows as it is.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,575
Location
Brighton
They could do with moving the track for platform 2 over to where the engine release road used to be and widening platforms 1 & 2.

As said elsewhere - it's not that kind of project. That said, if it were, I'd be tempted to rearrange things so they could squeeze in more platforms. There's no need for them to be as wide as they are, and the road down the eastern arch could go for a start.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,378
Location
Yorks
As said elsewhere - it's not that kind of project.

I heard the first time.

Platforms 1 and 2 & 5 and 6 are already rather narrow, particularly if you have 2 trains disgorging passengers at the same time.

It might be worthwhile curving 3 and 4 towards Worthing and replacing them with 2 additional London platforms where the cab road is. You would at least have more capacity going westward. I would still keep the Eastern Arch though.
 

sarahj

Established Member
Joined
12 Dec 2012
Messages
1,897
Location
Brighton
Yes, the WH Smiths is moving, as is the ticket office. The whole lego style building where Smiths is is going, as is the building where the main departure boards and millies cookies are. Millies cookies will be a loss as is has a counter on the platform side where people chainging trains can buy a coffee. The delice de france that will replace it, opp P 1&2, it is unkown if it will have a platform side counter. Waiting rooms will be built next to where the toilets are now. The wide platform between 7 and 8 is handy for delivery trucks, and also for the odd emergency service access.

Also next to the drop off area a bike hub is being built with also a bike hire and repair service. The only info I've seen on that is on the internal southern newsletter, which means I'm unable to post a link.

It seems that during the digging they have found that the buffers used to be further south than now.
 

thelem

Member
Joined
17 Mar 2008
Messages
550
Cycle hub info at http://www.southernrailway.com/southern/news/new-850000-cycle-hub-for-brighton-station/

General redevelopment info
http://www.southernrailway.com/southern/news/work-starts-on-brighton-station-concourse-improvements/

Unfortunately this doesn't include the map that they are displaying in the station, but from memory there will be more little retail units, including delice de france where the staff access to platforms is at the moment, upper crust in the corner of the current ticket office (opposite their current location), and flying coffee bean remaining in the middle of the concourse. I assume millie's will move to one of the new units being created, unless it's being replaced with delice de france (both SSP brands I believe).
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Anyone know where the new booking office / travel centre will be? From (albeit limited experience) it always seemed to me that Brighton could do with a much, much bigger booking office than is currently provided - during several trips there I have witnessed the queue out of the door and halfway onto the forecourt! I assume it will be merged with the current, non-railway run travel centre next to Upper Crust? I seem to recall reading somewhere that there were once plans to site the booking office near the old toilet block (between the current Upper Crust and M&S) - can anyone confirm if that's correct?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,296
Southern’s Project Sponsor Emma Toms said: “...and I am sure that when finished, Brighton station will once again be the station it was designed to be at the beginning – with plenty of complimentary modern facilities.”

Oh dear. I think she possibly chose the wrong version of that word...
 

thelem

Member
Joined
17 Mar 2008
Messages
550
The booking office will go in the building between the toilets and the taxi rank. It feels out of the way at the moment, but I guess it will be better once they have demolished the WH Smith building.

I had another look at the poster at the station, and the only outlet not mentioned as millies cookies, and the only new outlet mentioned was delice de france in a very similar unit, so it looks like that is a like-for-like swap.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,652
Brighton could easily take some more platforms, as jrt mentioned some are quite wide although at times they do require the space - lots of group travel and luggage! Not to mention swervy drunks!

But it could use an extra platform or so - if required. For instance if more Gatwick Express trains begin running down to Brighton. Although I think a good alternative to this would be to run some of those extended ones to terminate and turn at Hove instead. Huge morning demand, and arguably as many London daily commuters.
 
Status