Conon Bridge station re-opening.

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PaulLothian

Member
Joined
27 Sep 2010
Messages
695
Location
Linlithgow
Useful info here - http://www.caithness-business.co.uk/article.php?id=3547 It states: The project will include the construction of a new 15 metre platform, a waiting shelter, passenger information systems and cycle racks and lockers at the station by Network Rail and ScotRail, while The Highland Council will construct the car park and enhance the road access and street lighting at the station.

Highland Council is contributing £100,000 towards this. Also see http://www.transportscotland.gov.uk/news/Conon-Bridge-Station-to-be-reopened
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
There were problems with the local residents objecting to the station road being tarmac'd. Have these been resolved?



I was under the impression that this was only temperary while work on the Kessock Bridge was0undertaken. If so0a Tarmack road surely wouldnt be a problem? Corrections on any of this welcome.
 

Liam

Established Member
Joined
29 Dec 2010
Messages
1,245
Yep, looks like a copy of Beauly. Good to see more reopening in Scotland.
--- old post above --- --- new post below ---
This (http://www.highland.gov.uk/NR/rdonlyres/CC4B8BFA-428F-42B6-849F-527351F123E4/0/PLN00713.pdf ) rather suggests it is 15 metres! In particular see the diagrams at the end.

I cannot see any logic in spending money on a 4-coach platform when Far North trains already have selective door opening (in use at Beauly)

Isn't it just local door, rather than SDO?
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
This (http://www.highland.gov.uk/NR/rdonlyres/CC4B8BFA-428F-42B6-849F-527351F123E4/0/PLN00713.pdf ) rather suggests it is 15 metres! In particular see the diagrams at the end.

I cannot see any logic in spending money on a 4-coach platform when Far North trains already have selective door opening (in use at Beauly)

Yes, it would appear you are correct Paul. Now that I have had a chance to look properly, there are photos of the new Conon Bridge station on another forum and it is tiny. The expected opening date is being quoted as 8th February. I expect it was wishful thinking on someone's part to say it would be 4 coaches worth.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,424
Location
A typical commuter-belt part of north-west England
I was under the impression that this was only temporary while work on the Kessock Bridge was undertaken. If so a Tarmac road surely wouldn't be a problem? Corrections on any of this welcome.

Steve Montgomery, the managing director of ScotRail, says that the new station at Conon Bridge will underpin their commitment to connect even more communities by extending rail services.

Councillor Drew Hardy, Leader of The Highland Council, says that a figure of £100,000 (in addition to other funding) was specifically ring-fenced to ensure that the upgrading of the car park and peripheral road connections to it was committed.
 

lancastrian

Member
Joined
2 Jan 2010
Messages
537
Location
Bolton, Lancashire
"A new 15 metre platform"? Fifty metres, surely?

There is a picture of the new platform in the February Issue of TRUK, page 17. It is being built opposite the old platform, which to me looks as though it could have been renovated and reused.

Although the picture is somewhat an end on picture it only looks to be a very short platform, so 15 metres seems to be right. I personally feel that this is very short-sighted, but if it get the station open, that's good. After all from evidence of other re-openings with short platforms, it only costs 3 to 4 times as much to extend them than it would have been to build them long enough at the start.
 

Maxfly

Member
Joined
9 Mar 2010
Messages
269
Location
Scotland
Iirc the old station is now a private dwelling so doubt reusing the original platform would be a popular move. Beauly seems to cope well enough so would think that conon's wee platform will be adequate enough.
 

lancastrian

Member
Joined
2 Jan 2010
Messages
537
Location
Bolton, Lancashire
Now do I detect a note of sarcasm there Lancy? ;)

You think?? I was hoping that it would have been obvious as dripping sarcasm myself. What really surprises me is the COST of these short platforms.
--- old post above --- --- new post below ---
For those of you who have yet to see a picture of the new station:
http://www.scot-rail.co.uk/photo/scaled/13267/

Well this is a better picture than the one in TRUK, but it really shows how short the platforms are. My question is how long before 'elf n safety' take one look at them and complain that people could fall of the ends of them at a busy time and that they need to be extended?

Personally I would have renovated the usable length platform on the other side of the track. They managed to do it quite well at Beccles.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,352
Location
Yorkshire
My question is how long before 'elf n safety' take one look at them and complain that people could fall of the ends of them at a busy time and that they need to be extended?

Personally I would have renovated the usable length platform on the other side of the track. They managed to do it quite well at Beccles.

I imagine that given Beauly was allowed to open with similarly short platforms it'll have been treated similarly in terms of safety standards. Even wth the most optimistic projections of usage, I can't imagine the communities served by Conon Bridge would generate so much traffic that the platform would become overcrowded!

Also, I'm making the assumption that the platform has been placed that side of the line for ease of access- using the opposite side would require either a footbridge with lifts which would cost £millions, or a foot crossing which would presumably be more of a H&S issue than a short platform.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,424
Location
A typical commuter-belt part of north-west England
Also, I'm making the assumption that the platform has been placed that side of the line for ease of access- using the opposite side would require either a footbridge with lifts which would cost £millions, or a foot crossing which would presumably be more of a H&S issue than a short platform.

If you see the plans that were submitted, the platform which was situated on the opposite side to the current one was not considered, as the existing site of the new platform abuts the car park area, which in itself is an extension of the current road that serves the houses on that side of the line.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,174
Location
Huyton
can anybody tell me why new platforms seem to have steps instead of a ramp at the end?
 

duncanp

Established Member
Joined
16 Aug 2012
Messages
4,856
Did anyone see Michael Portillo on "Great British Railway Journeys" this week?

He got off the train at Beauly, and it took him 17 paces to walk from one end of the platform to the other.

The platform is small, but it seems to be able to cope, and I think people would rather have a new station with a 15 metre platform than no station at all.
 