In the land of the cuckoo clock, where else.they already have elsewhere, I can't find where at the moment though.
--- old post above --- --- new post below ---
Small lightweight locos about the power of a class 20 would deal with the problem you are talking about. But if you look at the Southern up to the early 1990s there was a small fleet of loco-hauled stock for use in the peaks, and DEMUs to run the base-load service. But that still leaves plenty of scope for standardisation. The Southern DMUs had trailer vehicles identical to those on their EMUs which in turn were basically the same as the vehicles designed for steam haulage. Which meant that, for instance, some of the DEMUs eventually ran with EMU trailers in the formation.The problem is that the UK network is made up of a lot of lines and services which see up to 4 coach long trains (which I seem to recall you have said in the past is too short for loco hauling), of the rest quite a lot of services need to run with the maximum number of coaches or are South East EMU services. That only leaves relatively few services where loco hauled trains would be useful and even those are often better run as DMU's (with running speeds of up to 100 mph) as they can split and run as short formations to a couple of destinations (again 4 or less coaches).
You regularly raise the issue of track costs but how significant are they in the overall scheme of things? The capital cost of rolling stock is one of the really big ones.Also the track access charges for the cheapest loco is nearly 3 times that of the most expensive DMU coach and most DMU's (including the class 158's and 159's) are cheaper than a mark 3 coach, meaning that the lease costs of the Loco and coaches would have to be quite a lot lower than a DMU for loco hauling to be a viable option.
In which case a high speed line is probably not the right way to deal with the capacity problem at all. Anywhere in the UK. High speed rail works when there are large conurbations with a lot of empty space in between. The UK south of about Manchester consists of dozens of settlements with populations of between 1000,000 and 250,000, with a lot of the spaces in between built up as well. That pattern calls for a network with plenty of connections, not a main stem to concentrate the traffic flow. Arguably, HS2 is exactly the wrong solution to the transport needs of people in the southern half of the UK, where most people live and work.If everything was equal that would make sense, however there are a few flaws in that suggestion:
- Firstly HS2 isn't currently planned to run to Scotland, so that is extra money that would need to be spent
- Secondly the numbers of passengers between Tyneside and the Midlands is probably a fraction of that of the numbers of passengers between London and all the places services by HS2. As basicly HS2 works because it is running into London, all the people that will be able to travel between the other stations are an added bonus. Which means although you would be receiving an income earlier it may not cover the costs of running the trains, let alone off setting some of the interest costs.
- Thirdly, even if the passenger numbers were enough to pay for running the trains and covering some of the interest costs that is likely to be at the expense of most of the existing services, potentially resulting in a reduction of services for many towns along the line. Conversely, even though the Birmingham - London section of HS2 may take a few more years more to be built than your suggestion, once it is running it could bring much more relief to the existing lines enabling more services to places between the two.