• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Southern add 40 vehicles to order

Status
Not open for further replies.

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,039
RAGNARØKR;1286006 said:
People want... all the things you listed, most of which are really frills. What they want before that is a comfortable seat rather than having to stand, a reliable heating and ventilation system, which until just a few years ago ruled out air conditioning, a reliable service, a reasonable journey time, and fares that are not outrageous. Clipping 5 minutes off a one hour journey is neither here nor there, especially if people are comfortably seated and can get on with something while they are on the train, whether reading a book, working on their laptop, or boozing in a buffet car.

People want a comfortable seat, then if there's not enough of them when its a little busier, a seat so they don't have to stand as much.

Unless you have a way that enables intercity type trains to run Brighton to London (which is what most people would want and more or less what you are describing) and has a suitable cost to benefit ration (which is unlikely given the amount of infrastructure required to enable more services to Brighton), then unfortunately Brighton passengers will have the stock that they've got (or similar) for the for the foreseeable future.

Train company reduces journey time by 8%, sounds a reasonable time saving to me, oh that's "only" 5 minutes of a 60 minute journey time, still sounds better than it was before, yes it may not sound like a lot, but as one supermarket chain says every little helps.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,946
RAGNARØKR;1286006 said:
And the Clapham accident was not caused by the use of mark 1 stock.

Nobody said it was. However the Hidden report examined the crash worthiness of the vehicles and concluded that this contributed to the number of casualties. There were similar comments after Cannon St and other collisions involving such stock.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,061
Location
Reston City Centre
RAGNARØKR;1286006 said:
That is just an argument for longer trains, and as someone pointed out that there was a shortage of capacity at St Pancras (a situation created by the habit of not joining up the thinking), there is the solution.

Everything can be otherwise

Is that the best answer you can give to justify getting all EMT services to stop eight times between St Albans and Bedford (inclusive)?

Trolling again?
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,967
Location
Surrey
Standards have moved on, people expect far better than the current interior especially when compared to a 319. They want proper real time info that gives them updates while they are on the train. The want air con, plugs at every seat. Not to mention tha faster accretion means a real time improvement n jounery times. The jounery time on a class 700 is expect to be atleast 9.5% on current 319 timing. You'll note that almost all Thameslink timings are for 319s expect the 12 car services. That is a large saving of time for anyone. Now do you understand why it's to important in this case to step up to a new generation?

So rather than making statements of 1978 vs 2012 care to actually say why thing haven't improved?



So standing all the way from Brighton isn't enough of a issue to warrant a new generation of trains? Simple fact is they all should have a seat expect in the high peak. Now also you need faster accerlating trains than the current Electrostars/Desiro fleets due to core dwell times. Don't forget that they are expected to 24tph in peak however when things go wrong these trains are to step up to 30toh for a limited period. Not possible with current fleet.



So your comparing the 1950s rail network with today without takinginto account line closures or the rise of the car?

Interesting you mention passengers were well trained, now they refused to be such and require looking after. Fact LUL withdrew its close button feature are people closed doors on others and babies in buggys so that with today's I deserve this, me meme attitude that things are very different. I suspect you are comparing things in isolation when if you step back and look at the bigger picture it's very different.



Complaints yet the service was used? Dont forget the Thameslink 2000 project was being drawn up same time as the core opened. If there was such a hostile reaction as you say, why would it be felt passenger numbers required such a massive upgrade?

I'm not so sure a 319 is a downgrade from a salm door by any men's, however this is personal taste and I've limited experience on them.



You raise an interesting point, the only 12 car southbound in the evening peak for FCC used to have about 20 people on it when it first started in Dec 2011. I saw it last week for a few days and it's busy now. 20-30 people per carriage. One day it even had one local overcrowding in the middle with people standing by the doors.

That not to mention every peak flow 12 car is very heavily loaded with almost full and standing from St Pancras on the intital two.
Some good points but some of them miss the point what a passenger really wants when travelling over 20 minutes on any train.

They want a comfortable seat – that means one they can sit in and do things like read newspapers/books or work their IT.

People will move away from trains if they have to stand beyond 20-25 minutes – I know I have and others have done similar – I’ve been driving into London for the last 8 months because I’d rather do that than stand for 40 minutes. (However I’m moving jobs and the new job doesn’t have parking so it’s back to the trains on Monday but at least its Victoria services which you can often get seats on)

I assume the new 700’s have already got planned seating arrangements agreed with Siemens. I’m very disappointed that this is not being made properly public so we can make comments before its too late. As far as I understand from this forum they will have wide door vestibules and narrow 2+2 seating with wide aisles which being 6 ft 3 and broad across the shoulders I know instinctively I will be taking up almost two seats as I do on the current 319’s

What is really required is an arrangement like the 377’s 2+2 wider seating with tables – but with only 6 bays in the centre to allow wider door opening, and an airline set removed at the ends for same purpose. Tip up seats could then be put in the vestibules to use out of London and tipped up in London to allow more standing in the core.

The current 319’s are the most uncomfortable trains that I have ever travelled on (I discount 378’s which I hate because they serve a purpose on very short routes). The seats are generally far too small for a normal human being to sit in as they are 3+2 seats with a seat removed. The 3+2 seats are a problem because they are too narrow not because people hate the middle seat – which they do. If that middle seat was a decent width there would be no complaints – unfortunately our railway is not broad gauge – hats off to IKB on that one

The 18:27 from London Bridge which is the 12 car southbound Thameslink train is rammed from London Bridge every night from reports I have – but empty in the core. Shows that demand from the core is limited but from London Bridge desperate. I think this will change massively when Crossrail is introduced as many London Bridge and Victoria commuters will use Crossrail to Farringdon rather than London Bridge
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
However your idea missing out Luton Airport Parkway. Restoring St Albans on inter cities will be interesting however once full Thameslink programme is completed they will have enough fast services to not warrant the EMTs calling there.

...it kinda refers back to me wanting to fix the poor provision of service to the stations on the MML between the M25 and West Hampstead using the capacity on the freight lines by both increasing tph to all existing stations as well as opening more stations...e.g. Napsbury, Scratchwood Parkway (for the M1), Grahame Park, Silkstream (for the Northern Line) & Minster Road (though obviously, any additional service north of Hendon/Mill Hill requires the lines to be extended to St Albans as originally planned).

That way, Thameslink would just be providing the semi-fast services within the M25, so outer suburban services could call all-stations Bedford to Luton, St Albans, West Hampstead, then the core. Inner suburban services could call all-stations Luton to St Albans, West Hampstead, then the core...and the new service could serve all the metro stations between St Albans and West Hampstead, thence onwards however deemed fit.

By way of illustration here's an old experiment to plot things out visually...

..but swinging it back on topic, properly segregating the service patterns enables you to have stock that is correctly targeted to the services it is used to provide. By way of example, say a 700/1 designed for outer suburban services could have tables etc. along with some of the non-capacity-detrimental features described in the thread, and would exclusively operate Bedford all stations to Luton, semi fast to Three Bridges, then all station to Brighton. A 700/2 could have no tables, but have more luggage racks as it would be serving both Luton Airport Parkway as well as Gatwick, serving Luton all stations to St. Albans, then semi-fast to Redhill, then all stations to Three Bridges.

...if the decision was made to try and slot in a metro service into the core, then a set of 700/3s with longitudinal seating could be built to run all-stations St. Albans to Redhill. I suspect something more appropriate would be used, i.e. 378s operated by LO and not running through the core.
 
Last edited:

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Some good points but some of them miss the point what a passenger really wants when travelling over 20 minutes on any train.

They want a comfortable seat – that means one they can sit in and do things like read newspapers/books or work their IT.

People will move away from trains if they have to stand beyond 20-25 minutes – I know I have and others have done similar – I’ve been driving into London for the last 8 months because I’d rather do that than stand for 40 minutes. (However I’m moving jobs and the new job doesn’t have parking so it’s back to the trains on Monday but at least its Victoria services which you can often get seats on)

Very true. Seat is the most important thing. You also pick up my point that standards change, something one of the posters seems to have issue with.

People who drive have a choice of environment they travel in. That's why you need updated trains with interiors to help them achieve the kind of jounery they want, ie using a laptop.

I assume the new 700’s have already got planned seating arrangements agreed with Siemens. I’m very disappointed that this is not being made properly public so we can make comments before its too late. As far as I understand from this forum they will have wide door vestibules and narrow 2+2 seating with wide aisles which being 6 ft 3 and broad across the shoulders I know instinctively I will be taking up almost two seats as I do on the current 319’s

Seating plan has been offered by Siemens in accordance with DfT demands on capacity but I've not seen it. It can't be made public before deal is signed as its a business deal. To expect others is unlikely in these conditions.

I'm 5ft 6 but broad shouldered and don't have an issue. Although there is a general issue with population getting bigger yet our loading guage isn't.

What is really required is an arrangement like the 377’s 2+2 wider seating with tables – but with only 6 bays in the centre to allow wider door opening, and an airline set removed at the ends for same purpose. Tip up seats could then be put in the vestibules to use out of London and tipped up in London to allow more standing in the core.

I'm sure when I read the ITT the only request was for 10 tables in each first class end. I suspect that tip up seats would be used in the Core.

The current 319’s are the most uncomfortable trains that I have ever travelled on (I discount 378’s which I hate because they serve a purpose on very short routes). The seats are generally far too small for a normal human being to sit in as they are 3+2 seats with a seat removed. The 3+2 seats are a problem because they are too narrow not because people hate the middle seat – which they do. If that middle seat was a decent width there would be no complaints – unfortunately our railway is not broad gauge – hats off to IKB on that one

I generally only use the 319 on a stopper daily and ont have an issue. That said I also use the a tube without problems as well. But seems your bigger than me and 95% of the people I see travelling daily on the Tubend don't have a problem with the seats.

The 18:27 from London Bridge which is the 12 car southbound Thameslink train is rammed from London Bridge every night from reports I have – but empty in the core. Shows that demand from the core is limited but from London Bridge desperate. I think this will change massively when Crossrail is introduced as many London Bridge and Victoria commuters will use Crossrail to Farringdon rather than London Bridge

Perhaps your also forgetting that in peak most Thamelink trains don't go via London Bridge and I'm sure that's one of the first southbound ones for awhile. Hence the demand. However main peak flow I was referring o is the MML (3 services a day versus 1 for BML in the peak flow).

There is huge demand for Brighton services from the Core. I've know eight cars full and standing by Farringdon. However if your a London Bridge on mutter you won't see this. High peak sees all trains well loaded.

...it kinda refers back to me wanting to fix the poor provision of service to the stations on the MML between the M25 and West Hampstead using the capacity on the freight lines by both increasing tph to all existing stations as well as opening more stations...e.g. Napsbury, Scratchwood Parkway (for the M1), Grahame Park, Silkstream (for the Northern Line) & Minster Road (though obviously, any additional service north of Hendon/Mill Hill requires the lines to be extended to St Albans as originally planned).

That way, Thameslink would just be providing the semi-fast services within the M25, so outer suburban services could call all-stations Bedford to Luton, St Albans, West Hampstead, then the core. Inner suburban services could call all-stations Luton to St Albans, West Hampstead, then the core...and the new service could serve all the metro stations between St Albans and West Hampstead, thence onwards however deemed fit.

By way of illustration here's an old experiment to plot things out visually...

Most stations see an increasing of tph from 16 today to 18 under Thameslink Programme and your idea for the other services is pretty much what they now expect all stations to St Albans. Missing out Luton Airport Parkway is madness especially as is right next to Luton so EMUs won't be going very fast by this point anyway. Then you Harpenden. Adding more trains with great capacity is better all round.

Note that as well as increased services, every station from Mill Hill Broadway north gets some 12 car services (along with West Hampstead). Current services are. Mix of 4, 8 & 12 cars with various calling patterns, the TLP will give every station an increase of capacity. Extra lines not required.

..but swinging it back on topic, properly segregating the service patterns enables you to have stock that is correctly targeted to the services it is used to provide. By way of example, say a 700/1 designed for outer suburban services could have tables etc. along with some of the non-capacity-detrimental features described in the thread, and would exclusively operate Bedford all stations to Luton, semi fast to Three Bridges, then all station to Brighton. A 700/2 could have no tables, but have more luggage racks as it would be serving both Luton Airport Parkway as well as Gatwick, serving Luton all stations to St. Albans, then semi-fast to Redhill, then all stations to Three Bridges.

Swinging back on target would be talking about the new eight 5 car 377s Southern has announced its ordering with additional 116+100 110mph dual voltage units possibility happening.

Currently we don't know seating plan of all but I can tell you thats not what's going to happen. DfT specified luggage areas on the 12 cars (along with two cycle places).

...if the decision was made to try and slot in a metro service into the core, then a set of 700/3s with longitudinal seating could be built to run all-stations St. Albans to Redhill. I suspect something more appropriate would be used, i.e. 378s operated by LO and not running through the core.

How can you have St Albans to Redhill Core service without running through the Core? Quite frankly this sort of trip would have lots of people travelling over 20mins would like seats. St Albans to London all stations is roughly 30mins and some people have no choice but to use this service.

You also bring up multiple configurations, well that comes at a cost of needing many more units than is planned.

One other thing you seem to fail to notice is the current users want London. There's long standing commuting patterns and some of your ideas stop that or give them inferior opitions.
 
Last edited:

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
Most stations see an increasing of tph from 16 today to 18 under Thameslink Programme and your idea for the other services is pretty much what they now expect all stations to St Albans. Missing out Luton Airport Parkway is madness especially as is right next to Luton so EMUs won't be going very fast by this point anyway. Then you Harpenden. Adding more trains with great capacity is better all round.

Note that as well as increased services, every station from Mill Hill Broadway north gets some 12 car services (along with West Hampstead). Current services are. Mix of 4, 8 & 12 cars with various calling patterns, the TLP will give every station an increase of capacity. Extra lines not required.
Point is that even with 12 car trains they will pretty much fill up at Luton and are generally chock-full by St Albans, so by the time they reach Radlett, Elstree, Mill Hill, Hendon & Cricklewood there's no room.

Coupled with the reductions planned as they're not bothering to extend all their platforms (not to mention wanting to close Cricklewood), the TLP does little to help the stations within the M25, which is shocking when you compare the service provision to similar lines...i.e. Watford Junction-Euston, Welwyn-Finsbury Park, Rickmansworth-Baker St. etc. The few 8-car services required to serve these stations will be a waste of capacity in the core...so why not remove them from the Thameslink service pattern onto the new metro lines and run more TPH to these outer destinations...

Swinging back on target would be talking about the new eight 5 car 377s Southern has announced its ordering with additional 116+100 110mph dual voltage units possibility happening.
Fair point. Sorry. I felt discussing rolling stock specification was close enough. Apologies.

How can you have St Albans to Redhill Core service without running through the Core? Quite frankly this sort of trip would have lots of people travelling over 20mins would like seats. St Albans to London all stations is roughly 30mins and some people have no choice but to use this service.
Point is that running more TPH gives more seats...but St Albans/Radlett/Elstree et al. can't see more TPH due to capacity pressures from further out, and every path that turns back at St Albans to provide capacity there is a waste of a path north of there...the initial pattern mentioned was running through the core...but being linked to the LO network for operational purposes (Not exactly that different from the fact the Redhill metro services are currently operated by Southern and run into London Bridge...) and having passengers for central London interchange at West Hampstead would be fine IMHO. No different to what already happens all over the network, e.g. Wembley Park/Harrow & Wealdstone/West Hampstead, etc. for express services.)

One other thing you seem to fail to notice is the current users want London. There's long standing commuting patterns and some of your ideas stop that or give them inferior opitions.

Not quite sure how they're inferior. Worst case is adding a single change, some of which already happens (i.e. I used to catch the first train from KX Thameslink then change at West Hampstead to catch one that stopped at Elstree to get out of the crowding on the platforms.) Fully implemented, you'd get metro pax travelling south for a few stops on very high frequency services to say, Mill Hill to change onto the Thameslink services running at both a much higher tph and speed than planned as they don't have to account for station stops at minor stations like Radlett et al. Besides...all metro services to the loop are going to be severed anyway, so aside from St Albans to Blackfriars, these patterns are going to have to change regardless, or they already have to change to get to a London Bridge service.
 
Status
Not open for further replies.

Top