tbtc
Veteran Member
Would an unpowered 150/156 being hauled by a loco be restricted to 75mph?
Would an unpowered 150/156 being hauled by a loco be restricted to 75mph?
One would need to look at the overall picture. Indian railways had EMUs in the days of the British.Not just a British thing, the Indians are getting rid of them, as by doing so it recovers the extra cost of MU after 3 years (leaving another 27 years of cost savings!)
Distances between stations are relative. Acceleration is certainly important when the stations are a mile or so apart. That is not the case in Cornwall, though there is a need for a decent power to weight ratio to get up the hills. But since these outer ends of the route are lightly loaded there is another case for removing a few carriages en route.There are IC routes where there are lengths where the trains run as stopping services at the ends (Cornwall for instance), so acceleration is important to UK IC trains.
Energy costs are only one of many costs that go up with speed. The infrastructure and rolling stock has to be designed for the higher speed, there is more wear and tear and there is a raft of regulations that kick in at 160kph with their associated compliance costs. It is not for nothing that stock has 160 painted on the sides.Also slowing trains (either acceleration and/or top speed) down only makes sense if the cost cost saving of the fuel is more than the cost of your staff remaining on board for longer and any extra stock you need to retain the same number of services.
RAGNARØKR;1281214 said:There is more wear and tear and there is a raft of regulations that kick in at 160kph with their associated compliance costs. It is not for nothing that stock has 160 painted on the sides.
Some EU regs kick in at 160. Saving in train-sets are only made when journey times go under a threshold particular to the route so that it becomes possible for the train to turn round and make another journey within a exact number of hours, assuming a clock-face timetable. Everything is less expensive if the train is designed for the lower speed as all the requirements are less demanding and there is less wear and tear.What regulations?
European TSIs don't kick in till about 270kph, not 160kph, and the regulations for cab signalling in the UK kick in at 125mph, not 100mph.
Also you have to account for the increased capital costs, and indeed staffing and maintenance costs, of having more trainsets to maintain the same service thanks to longer cycle times.
RAGNARØKR;1281382 said:Some EU regs kick in at 160. Saving in train-sets are only made when journey times go under a threshold particular to the route so that it becomes possible for the train to turn round and make another journey within a exact number of hours, assuming a clock-face timetable. Everything is less expensive if the train is designed for the lower speed as all the requirements are less demanding and there is less wear and tear.
The way I see it, assuming that a train is of a resonable length (e.g. at least seven carriages), locamotive hauled trains have the advantage of having one single large drive system which should mean that the hardware to drive the train at a certain acceleration/top speed (assuming that acceleration is limited by power rather than grip [MUs have more grip per unit mass]) should have cheaper production/maintainance/running costs than multiple units). Also, it is possible to create a standard communication system and internal power system (powers the lights, power sockets and LED screens) between locamotives and carriages to make a variety compatable with each other and make each services its optimum length rather than being restricted by the length of sets (e.g. new IEP electric stock will be single 10 car sets which means there is no formation length flexibility at all).
The only three advantages that multiples units have that I can currently thonk of is one, that multiple units have is that a service can have sets split/join quickly and simply so that one path can run to two destinations and/or the train length can be made shorter where it will be less busy, two, that MUs make more efficient use of short platforms, and three, that having multiple drive systems means that a MU service might be able to continue if one failed.
The problem with the HSTs is that they do not have modern technology (automatic doors, LED destination boards, LED seat reservation screens and competitve acceleration). The frankly ancient system of paper reservation labels and stickers on the outside of the train showing the stops waste a lot of time at termini meaning that more stock is required to operate the service than would otherwise be needed. I think that it would be a very expensive job to upgrade the HSTs to the required level and that they should be replaced.
I think that it might have been a better option to have made the 10-car IEP sets Locamotive hauled services. A modern equivalent to the class 91 (225s) and a modern bi-mode equivalent to the class 43 (HSTs [125s]) could have been built that would share the same class of modern equivalent to the Mark 4 carriages (if one bi-mode locamotive was powefull enough when using its diesel engine the two train classes could share the same DVTs). The difference to the mark 4 carraiges would be all those useful things that modern intercity stock have (e.g. LED destination/carriage number boards on the outside). These would be ideal for intercity services where no splitting/joining is required (train stays the same length during the service). There would be no complication problem making a train a single carriage longer/shorter (trains stays same length while in service).
A wide range of locamotives / carriages could be built to suit a variety of lines with different strengths and weaknesses. Also if the inter-carriage-locamotive communication system and internal power system (powers the lights, power sockets and LED screens) became the one that every intercity locamotive hauled train used, the time that carriages would eventualy replaced (or extra are built) could be independant of when the locamotives are replaced.
You are not reading carefully, are you? That's the problem with scanning stuff off the screen and bashing out an instant response without thinking about it.Correct me if I'm wrong- is RAGNARØKR suggesting that rather than buy new stock, the railways should be bringing back old locomotives and carriages that have been scrapped (and therefore don't exist), as his suggestions of buying new locos and carriages have been demonstrated to be crazy?
Probably the latter because it is possible to prolong the life of existing stock.You would put Manchester up back towards the 2hr30-2hr40 mark it was before the WCRM (if not longer as the journey would be even longer than the Cl90 Mark 3 formations of the 80s), Edinburgh-London would be something on order of 5hrs for the best run and numerous other journeys would become drastically longer.
You can't afford to surrender that kind of time without haemmoraghing custom.
(Especially once you include the conversion back to loco haulage with the attendant acceleration issues).
Putting travel times back into the pre HST era is not going to be popular with passengers.
In order to run the 3tph service from London to manchester you only need something like 14-15 sets, you would be looking at nearer 20 sets mark once you went back to loco haulage.
So you can have 15 multiple units built for 125mph, or 20 loco hauled formations built for 100mph... which will it be?
One cannot say what is, and is not, expensive, until the matter is examined in detail and a quote obtained.The problem with the HSTs is that they do not have modern technology (automatic doors, LED destination boards, LED seat reservation screens and competitve acceleration). The frankly ancient system of paper reservation labels and stickers on the outside of the train showing the stops waste a lot of time at termini meaning that more stock is required to operate the service than would otherwise be needed. I think that it would be a very expensive job to upgrade the HSTs to the required level and that they should be replaced.
Also if the inter-carriage-locamotive communication system and internal power system (powers the lights, power sockets and LED screens) became the one that every intercity locamotive hauled train used, the time that carriages would eventualy replaced (or extra are built) could be independant of when the locamotives are replaced.
The Mark 2 with Virgin had SDL, and were in reasonable condition. The later batch of CIGs were in good condition as they were fitted with anti-corrosion strips all over the outside. They did not need gaffa tape to hold them together. The trailer vehicles had another 15 years' life in them on light duties. A locking system under the control of the train crew was fitted to the pair that continued on the Lymington branch.Mk2s were slam door 1960s coaches (Mk1s date back to the 1950s). Are you seriously suggesting that we just buy some gaffer tape and try to patch them together for the modern railway?
Where was there for 87s to go when Virgin got 390s? The 90s moved over to the GEML, but can you suggest a practical home for the 87s?
RAGNARØKR;1281720 said:The Mark 2 with Virgin had SDL, and were in reasonable condition. The later batch of CIGs were in good condition as they were fitted with anti-corrosion strips all over the outside. They did not need gaffa tape to hold them together. The trailer vehicles had another 15 years' life in them on light duties. A locking system under the control of the train crew was fitted to the pair that continued on the Lymington branch.
If there was joined-up thinking there would have been plenty of routes for the class 87 locomotives to run on by the time they were due for replacement on the WCML.
The malaise runs deep.
So, I think RAGNARØKR has a valid point that maybe we shed rolling stock earlier than we should, but conversely it's equally daft to assume we should run every vehicle into the ground before we scrap it.
I can't think of anywhere we could use the 87s, but it seems that Northern are desperate for more trains. There must be some routes that it would have been practical to run with Mk2s hauled by some diesel locomotives, freeing up Sprinters to increase capacity on other routes and services.
Just a thought. Maybe the Mk2s were far too worn out by then. Perhaps nobody ever expected there to be growth on the Northern franchise that would necessitate more trains. But right now, I'm sure if there were a fleet of Mk2s and diesel locos to haul them, they could find a home somewhere on the network.
There are coaches and engines out there (Arriva built a stockpile, FGW and ScotRail have utilised locos and coaches for token services, ATN and FNW used to run a couple - I think NXEA had a 47 hauled set for a short period?). The problem is that there's very few lines suitable - plus unless you are going to run a lot of them then you are going to have problems of "non standard" stock.
There's also the problem of requiring two engines to run a three coach train, dwell times being different from the regular DMU stock etc.
Since 150/156s have only ever been cleared for 75mph operation I can't envisage them being allowed to run at more than that, even when loco-hauled.
In fairness, I can't imagine unpowered 150s/156s being used as LHCS. As discussed on another thread, quite a few 150s are suffering from corrosion and I can't imagine any ROSCO wishing to spend large sums of money on corrosion prevention, given that they'd have to be fitted with DDA compliant toilets as well.
Some good points there. I don't think they're insurmountable, but it would have to be a case of actively running specific routes/services with LHCS, rather than having the odd set for cover. It could well be that even this adds significant additional complexity as to not be worth doing.
the other (and probably far more likely) outcome for Sprinters with life-expired traction would be simply to replace the parts that are life-expired. Depending on what's fitted, it may even be possible to get some cleared for 100mph running (although I'd expect that to be unlikely)
Agreed - I think you'd have to convert an entire route - the Fife Circle is one possibility as it's a fairly long service without requiring reversal en route if you run Newcraighall - Cardenden - Newcraighall "out and back" services (with the loop in the other direction being provided by DMUs running Waverley - Cardenden - Waverley) - that should be about an hour and a half diagrams, with a remote place (Newcraighall) to "run round" (something that would be impossible at Waverley etc!), so you could get away with single locos.
But trying to find routes feels like scraping the barrel to justify using a handful of spare old trains - there really aren't many services left that could require that kind of haulage nowadays.
Genuine question - how hard would it be to convert a 150 into an EMU? Keep the body etc, but change the power supply etc.
Genuine question - how hard would it be to convert a 150 into an EMU? Keep the body etc, but change the power supply etc.
Or use DBSOs? Or convert some of the spare Mk3 DVTs to work with a Mk2 rake?
Now, if it's possible to convert the 455s to AC, that could be a very different matter. Certainly, I'd expect this to be easier than converting Sprinters.
Genuine question - how hard would it be to convert a 150 into an EMU? Keep the body etc, but change the power supply etc.
It would likely require some fairly serious re-engineering. You'd need to modify a roof for a pantograph to be fitted. The diesel hydraulic transmission would probably all have to go. Presumably the difference in traction would require some significant changes to the cab controls too? I'd expect this will all end up in "prohibitively expensive" territory
Probably Hard enough that scrapping it and buying a new EMU would be better value.
The problem with that would be a lot of wasted space/ weight for the sake of a few coaches I guess
455s, eh?
Four coach 75mph trains? Sounds like just what we need plenty of for the Valley Lines/ Lancashire Triangle etc - good thinking![]()
It all depends on how easily converted they'd be (and whether anyone will stump up for more Desiro/E* units for SWT/Southern to replace them.) Certainly, one vehicle in each set seemingly has a flat roof (anyone know why this is?) and that might just be ideal for fitting a pan. Put a transformer and rectifier in so you continue to feed the rest of the traction systems with 750VDC and you're most of the way there, I'd have thought.
Oi hands of our 455sNow, if it's possible to convert the 455s to AC, that could be a very different matter. Certainly, I'd expect this to be easier than converting Sprinters.
Certainly, one vehicle in each set seemingly has a flat roof (anyone know why this is?) and that might just be ideal for fitting a pan. .
With joined-up thinking there would have been electrified routes ready for the class 87s to operate on by the time they were surplus to WCML requirements.So you'd have kept the 87s and 1960s Mk2s for what? The Lymington branch?
If you are going to run a lot of anything then it is not non-standard. But why would you want two locos to run a three coach train?There are coaches and engines out there (Arriva built a stockpile, FGW and ScotRail have utilised locos and coaches for token services, ATN and FNW used to run a couple - I think NXEA had a 47 hauled set for a short period?). The problem is that there's very few lines suitable - plus unless you are going to run a lot of them then you are going to have problems of "non standard" stock.
There's also the problem of requiring two engines to run a three coach train, dwell times being different from the regular DMU stock etc.
Oi hands of our 455s.
Doubt if SWT would give them up as they have been referbished. They are also receiving the 456s from Southern.
RAGNARØKR;1282151 said:If you are going to run a lot of anything then it is not no-standard. But why would you want two locos to run a three coach train?
When it is necessary to refer to dwell times except on suburban routes with stops every two minutes, it starts to look like a case of scraping the barrel for objections
Yes, longer-distance routes currently operated with DMUs. Then cascade those DMUs to the local services. Turbostars have no problem with dwell time. 158s are not great but could be improved by enlarging the lobby area to remove the pinch-points just inside the doorways. The railway might needs some smaller diesel locos, about 1800 hp, though half an HST is a possibility too, with a control trailer at the other end. Not rocket science.The biggest stock problem we have is on local DMU services (currently run by Pacers/ Sprinters). These are the kind of routes I'm referring to.
We've got pretty much sufficient stock for long distance/ high speed lines (though the HSTs will be withdrawn in a few years, obviously), so if there were a role for loco hauled stock then it'd be in the kind of stop/start route that I refer to.
Have you got any better idea for where to use loco hauled stock?
RAGNARØKR;1282375 said:Yes, longer-distance routes currently operated with DMUs. Then cascade those DMUs to the local services.