Has any one got any news on the re-development of Llandudno station,its been on the cards for over 12 years now,and every date they give just passes in the night.
Has any one got any news on the re-development of Llandudno station,its been on the cards for over 12 years now,and every date they give just passes in the night.
The current "delay" was caused because it was to be done using in part European money. ATW were to manage the project, however there is a clause in the ERDF funding that the investment must be "in perpetuity" something a UK rail franchise clearly cannot guarantee! Its due to take place next year as they have at long last found someone else willing to lead ..I believe the North Wales transport consortia TAITH. This problem has hit the entire Welsh NSIP scheme including Aberystwyth though why it wasn't clocked at the start and why its taken so long to sort I don't know.
Thank you for this excellent summation of matters. As you say, the Welsh NSIP scheme has been a victim of the lack of "implications understanding" by those who were expected to have been fully aware of these at the time of the first stages, then of the subsequent happenings.
It will happen soon!
If i could spill I would. Lets just say things are progressing and evidence may well be seen in the new year.
Has any one got any news on the re-development of Llandudno station,its been on the cards for over 12 years now,and every date they give just passes in the night.
Thanks for all the info,its nice too know that things seem to be on track,here is another problem we have,in May we have the Llandudno Victorian Extravaganza and in the last couple of years we have started to attract specials in to the station,like Ststesman rail but the powers that be are trying to stop any big trains coming in to Llandudno,anyone know why?
From a previous thread I vaguely remember something about fouling the points maybe, but I could be totally wrong.
All train operators have an obligation to keep their stations fit-for-purpose and in working order. ATW cannot use the excuse that the EU are witholding funding to avoid spending on the most basic things required to keep the station spic and span, it's a mess at the moment.
All train operators have an obligation to keep their stations fit-for-purpose and in working order. ATW cannot use the excuse that the EU are witholding funding to avoid spending on the most basic things required to keep the station spic and span, it's a mess at the moment.
Funny how Newport gets a new station for one golf comp(ryder cup) no hold ups yet Llandudno gets blighted by red tape for over 12 years.
Are you sure? no doubt if I look at my copy of the ATW franchise agreement I'll find a sufficiently fuzzy section that can be interpreted in more than one way. The answer to most basic things that don't happen in the ATW area has always been "its not in the franchise agreement"
Agree to some extent, but these things are outside of the complex franchise agreements, they are the basics of operating as a train operating company in a safe and proper manner. I'm sure if ATW are looked at closely enough, the ORR would find fault with many things they do.
There are sidings still at Llandudno,problem is they have been left to wrot,it would be nice to get a turntable as in Holyhead.
There isn't a turntable at Holyhead though: steam trains turn on the triangle at Valley instead.
Having seen the turntable inside the York museum surely it could be achieved at Llandudno with a bit of will power,European money,Welsh assembly,CCBC money,Westminster money as we have a local tory now on the cabinet,a brilliant tourist draw having our own turntable.

Still waiting to find out who has got the contract to turn Llandudno station into a modern setup.
--- old post above --- --- new post below ---
All has been revealed now and builders are on site,thank you all for your input.![]()
Funny how Newport gets a new station for one golf comp(ryder cup) no hold ups yet Llandudno gets blighted by red tape for over 12 years.
Well I hope that the 'design team' who were let loose on Newport are kept well away from Llandudno.

Well I hope that the 'design team' who were let loose on Newport are kept well away from Llandudno.