brianthegiant
Member
- Joined
- 12 May 2010
- Messages
- 588
Does anyone on here know anything about Velostrail tram line inserts?
www.strail.de/index.php?id=197&L=1
would it be approved in the UK or require some form of type testing?
(wasn't sure whether to put this here or the metro thread, but I figure this is where the engineers are to be found
I'm asking in the context of Nottingham Net Phase 2 where there is an issue with Chilwell High Road being a popular cycle route for there is no alternative parallel route available. Our experience is that most cyclists avoid streets with tram tracks due to the risks of getting wheels stuck and coming off.
Sadly the Net consortium aren't being proactive, including following up on the Velostrail concept, so I'm just wondering if there is a technical basis for their reservations.
www.strail.de/index.php?id=197&L=1
has it been tried anywhere in the UK?veloSTRAIL
veloSTRAIL is a new and innovative inner panel system that eliminates the flange grooves.
An easily replaceable flangeway element closes the flange groove. Any rolling stock, will easily press the replaceable flangeway element down but accomodates enough resistance for pedestrians, cyclists, wheelchair users, baby carriages and inline skaters. As an added benefit ice formation in the flange groove is no longer possible.
Smooth transition from one product to another together with an integrated locking and a bolting under the rail head makes driving over the crossing very comfortable.
Compact panel units allow simple and cost-effective track maintenance due to short installation and removal. Replacement of the replaceable flangeway element is without removal of the inner panel and requires no machinery and only minimal labour during very short, partial closing periods.
would it be approved in the UK or require some form of type testing?
(wasn't sure whether to put this here or the metro thread, but I figure this is where the engineers are to be found

I'm asking in the context of Nottingham Net Phase 2 where there is an issue with Chilwell High Road being a popular cycle route for there is no alternative parallel route available. Our experience is that most cyclists avoid streets with tram tracks due to the risks of getting wheels stuck and coming off.
Sadly the Net consortium aren't being proactive, including following up on the Velostrail concept, so I'm just wondering if there is a technical basis for their reservations.