Answered is not really the right word. he attempted to respond on 100 tops, but most responses were standard issue customer relations type responses which did not fully address the issues raised. Overall the session was v disappointing in my view
You can to a degree or at least expand on them on the public website afterwards if they took it seriously.How do you fully address questions in 140 characters?
Greater Anglia have put pictures of rolling countryside on the inside of all their toilet doors on trains to give them a nicer ambiance as the toilets have no windows. Good idea from GA there, top marks!
Adam![]()
I've only experienced one problem so far. Our train to norwich from london was late. They were spoofed to hold back the yarmouth train, the last of the day. As we walked up to the train the guard was about to shut the doors. The train left 2 minutes late! Hadley held.
This was made worse by the fact my wife bad only just recovered from broken ankle. We had to make our toward the front of the london train and could only do so once it slowed down and was still a struggle for my wife. As was having to hurry to yarmouth platform.
Would be interesting to know if they'd have reimbursed the cost of taxi if we missed connection
I have a couple of Ideas would not cost too much in railway terms
Upgrade the loops at Witham to speed up entrance and exit to the fast lines.no trains to stop on fast line platforms that would allow overtaking
Chelmsford seems to have space in the middle of the tracks streach out the aproaches
I was inpressed with this working on chiltern I was on a local and the train stopped in a local station waited for a few mins while 2 fast trains overtook on the middle road.
One particular pain at Witham is for trains stopping at the fast down platform, they have to be cautioned into it adding extra time, because of the foot crossing outside the country end of the platform. Something to do with in case the train didn't stop in the platform, it could run someone over?
All up this line, level crossings are a major pain to the performance of the route.
did anyone see tweet the manager with the MD Ruud Hackett the other day #ttmga ?
was a bit of a farce - over 500 questions submitted and only 100 or so answered. They said something about following up with more answers but I dont hold out much hope, the responses Mr Haket provided were all very generic and he did not give the impression of someone who had his finger on the pulse of the issues passengers were raising
I am looking forward to the DfT publishing the franchise agreement so we can see what they committed to do and by when
Greater Anglia have put pictures of rolling countryside on the inside of all their toilet doors on trains to give them a nicer ambiance as the toilets have no windows. Good idea from GA there, top marks!
Adam![]()
The crossing/signalling is fitted with stop/non stop controls. If the train is booked straight through the signaller will operate the non stop button on his workstation which means the crossing will close to the public before the train reaches the station. If the train is booked to stop the clearing of the country end platform signal is delayed, this is so the crossing is not closed too long which invites crossing mis use. It doesn't cause any extra delay to stopping trains.
You could look at it that it's a good thing that they gave you information in advance to ensure you did catch the last train (by telling you they couldn't hold it for long and that you should move forward in the train and which platform to go round to)?
If you'd missed a booked connection with the last train of the day, because the train you were on was delayed, they'd have provided a taxi at their expense (i.e. billed direct back to them, not requiring you to pay and claim back).
--- old post above --- --- new post below ---
Incidentally the bridge has taken at least 3 years in the planning because of strong objections from the local horse lobby (the path is a bridleway). Notwithstanding that a chum who used to live almost next to the crossing had never seen a horse in Witham....
It looks like Brampton on the East Suffolk line may be becoming request-only with the new hourly service (no times available towards Ipswich yet). For example: http://www.opentraintimes.com/schedule/Y11825/2012/12/13
It looks like Brampton on the East Suffolk line may be becoming request-only with the new hourly service (no times available towards Ipswich yet). For example: http://www.opentraintimes.com/schedule/Y11825/2012/12/13
do we know if there will be any more 12 car trains on west anglia? they extended the platforms at cheshunt, brox, sawb, stan mount but at the moment the only 12 cars are three cambs trains each way which dont stop at any of those stations
About time too. Will seem very strange to run through Westerfield non-stop (officially) for the first time since the early 1980s.
Faster entrance / exit speeds means shortening the loops and/or moving all the pointwork at both ends, and moving a lot of signals and OLE.
Oh dear, poor Westerfield. It had direct London trains back in 2009, now it won't even be served by Lowestoft trains. Is there any reason they no longer stop there? Lack of demand or to speed up journey times?
Adam![]()
You do get passengers on/off from the Woodbridge direction but on the whole its just a stop for token exchange & any patronage is in single figures. Those heading to/from Ipswich have the hourly Felixstowe service which is more than sufficient for the business on offer & a damn site more frequent than a few years ago.
Surely you mean lengthening the loop? Assuming say a 75mph turn-in, then the train will do most of its deceleration in the look rather than slowing on the main to say 25?