Proposed Class 223?

Status
Not open for further replies.

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,144
Location
Redcar
I believe that both the Pantograph car and any new order such as suggested in this thread could be built in Derby as both the Class 172 and Voyagers are using the same Chassis structure and anybody parts could be shipped into Derby, in the same way that Hitachi will ship the body's for the IEP's into their factory from Japan.

Really? I'm not saying your wrong, but what exactly is the source for this statement? Also, even if the chassis is the same you still have to overcome the fact that Derby is neither equipped nor trained to assemble the steel body shell of a 22x. The likelihood of Bombardier spending money on making it capable of doing that when they have factories elsewhere that can do the work is unlikely (especially as the originals weren't built here). The most that might happen is that Derby is used to fit out the interiors in the same way that Wakefield was used to do so originally.

Edit: Sorry I see now that you've suggested that they ship the bodies to Derby. Still seems an expensive way of building a train that Bombardier have plenty of other factories that it could be built by. Again fitting out is the best that can be hoped for I think.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Yew

Established Member
Joined
12 Mar 2011
Messages
7,246
Location
UK
Class 156 has an even worse case than the 158 thanks to not even having air conditioning, an amenity which is really a necessity these days.

I would beg to differ, the Aircon on a 158 is so anemic the hopper vents of a 156 are much better at cooling the train
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,401
And in 2020 the 158s still won't be due for withdrawal for several more years, let alone the 165s and 166s. The withdrawal date for 158s will be in the distant future. The fact that lead times for new rolling stock deliveries are so protracted only goes to show this.

So what makes the Sprinter's so much more able to survive longer than the predecessor units?
With the exception of a relatively small number of Cl101s and the handful of remaining Class 121s they seemed to be withdrawn after 30-35 years of service.

If the upgrade costs roughly 33% of the cost of a new unit (figures for the Chiltern Mark 3s show ~£750k according to this forum, but I will grant you ~£500k to account for reductions due to experience over a large fleet, compared to £1.5m for new units) to gain 5 years of additional service compared to 35 years for the new units... the maths does not look very good for the refit.

The Class 150s are also hamstrung by the rather inferior power to weight ratio compared to the Class 172s (~8hp/t compared to 10+hp/t) which limits acceleration and thus causes all sorts of problems of which you are almost certainly aware. (The Cl150s, being older units will be even older at the time of the DDA limit... 33 years and up).

The Class 153s have problems caused by the lightweight construction of the Class 155s, with additional issues caused by the fact that they would either require a massive rebuild in excess of the other 23m sprinters to remove the inside cabs to add more cabin space or would be left with substantially less capacity per unit mass than other units in the fleet.
Class 155s are likewise apparently suffering from the lightweight construction used and have serious sag issues (got this from this forum a while back) and would be poor candidates for rebuild.

The 156s have similar problems with low power to weight ratio (same engine and similar weight), lack of air conditioning or power to add it and an age that will be rapidly hit 35 years (31 years and up at the DDA deadline).
Porterbrook may be looking into a Class 156 rebuild but have not, as far as I know, actually committed to anything, and doing at this early stage may indicate that they are worried about the current condition of the units and are attempting to position themselves for increased rental fees for the last few years of unit operations.

The Class 158s are slow to accelerate, have issues with poor quality air conditioning, have an insufficient power to weight ratio to occupy fast line paths on the railway, are not 100mph capable and have long dwell times compared to Turbostars. They will also be 30+ years old at the DDA deadline so the economics of an expensive refit when they will last less than a further decade by all reasonable expectations and are not the best units operationally even now.
The fact that they apparently have worn out gearboxes (with SWT trying to get them replaced even with eight years to go till the DDA deadline) doesn't help

The 158s are considerably more railworthy than the Pacers are. Their nominal age in relation to each other isn't really a major factor. The 2020 DDA compliance deadline will not sound the deathknell for the Sprinter family of trains.

But they wouldn't be considering doing a refit if the trains weren't perceived to have a considerable amount of life left in them.

8 years is a considerable lifetime, especially as the gearboxes are the same design as fitted to brand new Turbostars and could be used for spares after the trains are retired.

You may not like it, but the economics of keeping the Sprinters on beyond DDA looks rather shakey, the upgrades will be just too expensive and the trains are too low powered even now.
--- old post above --- --- new post below ---
I would beg to differ, the Aircon on a 158 is so anemic the hopper vents of a 156 are much better at cooling the train

So if the Class 158s will require new air conditioning on top of everything else the case for keeping them is even weaker than I first thought.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,064
Location
Reston City Centre
Class 172s fill the 75mph option, but we have to remember that the bulk of the 90/100mph fleet is approaching end of life rather rapidly, and will soon need replacing

As things stand, all 75mph stock (Pacers, 150s, 156s etc) will probably be due for withdrawal before the 90/100mph stock (158, 159, 168, 170, 171, 175, 185).

However many of these 158/170s etc are stuck on slow routes. Build 75mph DMUs (if you are going to build *any* DMUs) and you suddenly have lots of "spare" 100mph DMUs.

The 125mph routes don't need additional diesel stock (what with bi-mode IEP, further electrification and HS2), and the routes you've suggested (like Cardiff - Manchester) have no need for 125mph stock.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
As things stand, all 75mph stock (Pacers, 150s, 156s etc) will probably be due for withdrawal before the 90/100mph stock (158, 159, 168, 170, 171, 175, 185).

However many of these 158/170s etc are stuck on slow routes. Build 75mph DMUs (if you are going to build *any* DMUs) and you suddenly have lots of "spare" 100mph DMUs.

The 125mph routes don't need additional diesel stock (what with bi-mode IEP, further electrification and HS2), and the routes you've suggested (like Cardiff - Manchester) have no need for 125mph stock.

You have my vote on that one. Since privatisation, we seem to have spent the majority of our money on new DMUs for 'show' routes and failed to invest so much in the supposedly less important routes, relying on cascaded BR stock. The Southern used to do something very similar, with former London suburban stock displaced by electrification often ending up on branch lines, the Terriers, M7s and Adams Radials for instance, working with pre-grouping coaches quite often. That's in contrast with the GWR, that provided dedicated classes such as the 1400s and 4500s with specially-built auto-coaches and B-sets. What we need is a more 'Western' policy, something cheap and cheerful that provides a good passenger experience and means no longer relying on hand-me-downs.
 

junglejames

Established Member
Joined
8 Dec 2010
Messages
2,069
Refering to the OP. I havent checked any figures at all. But I will mention one thing. All these hp/tonne figures are lovely, but dont always mean much in reality.
Lets look at it this way. Are you expecting this train to go 125 on diesel power?
Well if geared for 100mph, it would have similar acceleration to a 172. With gearing for 125mph, the acceleration would be worse than a 172. May even take it down to 170 levels of acceleration. Now compare this to the acceleration of a HST.
Remembering that a 67 plus load 6 can keep to 168 timings, a HST has better acceleration than the 67, and a 168 has better acceleration than a 170.

Sorry, but I disagree with the suggestion that something with a class 172 engine geared for 125, will be able to perform as well as a HST.
Its also likely that to maintain 125, this unit would be needing to keep the engines flat out, even on the flat. Something a HST doesnt need to do.

All this, and I havent even taken the 7th coach into account yet. Unpowered on diesel sections, and with quite a bit of extra weight.

Imagine this extra unpowered coach on the back of a 172. Can you see the 172 outperforming a HST? I cant. OK your unit may have ever so slightly better acceleration than a 172 if geared for 100mph, but geared for 125mph, it'll have much worse acceleration.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,064
Location
Reston City Centre
You have my vote on that one. Since privatisation, we seem to have spent the majority of our money on new DMUs for 'show' routes and failed to invest so much in the supposedly less important routes, relying on cascaded BR stock. The Southern used to do something very similar, with former London suburban stock displaced by electrification often ending up on branch lines, the Terriers, M7s and Adams Radials for instance, working with pre-grouping coaches quite often. That's in contrast with the GWR, that provided dedicated classes such as the 1400s and 4500s with specially-built auto-coaches and B-sets. What we need is a more 'Western' policy, something cheap and cheerful that provides a good passenger experience and means no longer relying on hand-me-downs.

Agreed - its a bit like bus companies buying flashy "ftr"s and hoping that they can cascade midlife double deckers onto "provincial" minibus routes.

Its not glamorous to want 75mph stock, when so many people are more excited by faster trains, but these are the "bread and butter".
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,401
Refering to the OP. I havent checked any figures at all. But I will mention one thing. All these hp/tonne figures are lovely, but dont always mean much in reality.
Lets look at it this way. Are you expecting this train to go 125 on diesel power?
Well if geared for 100mph, it would have similar acceleration to a 172. With gearing for 125mph, the acceleration would be worse than a 172. May even take it down to 170 levels of acceleration. Now compare this to the acceleration of a HST.
Remembering that a 67 plus load 6 can keep to 168 timings, a HST has better acceleration than the 67, and a 168 has better acceleration than a 170.

Sorry, but I disagree with the suggestion that something with a class 172 engine geared for 125, will be able to perform as well as a HST.
Its also likely that to maintain 125, this unit would be needing to keep the engines flat out, even on the flat. Something a HST doesnt need to do.

All this, and I havent even taken the 7th coach into account yet. Unpowered on diesel sections, and with quite a bit of extra weight.

Imagine this extra unpowered coach on the back of a 172. Can you see the 172 outperforming a HST? I cant. OK your unit may have ever so slightly better acceleration than a 172 if geared for 100mph, but geared for 125mph, it'll have much worse acceleration.

Since it has an electric transmission and a similar power to weight to a HST it will perform similarily to a HST at higher speeds, and will be superior at lower speeds due to the higher percentage of weight on its driven axles.

What engine is providing the power is largely irrelevant, with an electric transmission all that matters is the gearing on the traction motor final drives and how much power it can develop.
Electric transmissions are inherently more able to develop both higher speeds and higher starting tractive efforts than the mechanical/hydraulic transmissions used in Sprinter derived units, as you demonstrate yourself with your reference to Class 168 timings compared to load 6 Class 67s.
 
Last edited:

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,580
Location
Macclesfield
So what makes the Sprinter's so much more able to survive longer than the predecessor units?

With the exception of a relatively small number of Cl101s and the handful of remaining Class 121s they seemed to be withdrawn after 30-35 years of service.
Construction of the Sprinters employed much more advanced construction techniques and they have been built more substantially than were the principally lightweight first gen DMUs. The bodies of the first gen DMUs were in most instances quite prone to corrosion and rot, while the integral construction of trains such as 150s and 156s reduces the opportunity rust and rot have to permeate the vehicle. Many of the first gen units were also riddled with asbestos, and on top of that, the engines and transmissions on many units were also fairly shagged out by the eighties: The 104s used in the Manchester area for instance were falling to bits! There are no signs at the present time (Barring the 158 transmissions, which are working fine at the moment anyway) of the Sprinter classes suffering from the same problems.

Additionally, in the late seventies, BR did embark on a refurbishment programme for those first generation DMUs that it had selected to continue on in service for another ten years or so: No less time than the Sprinters should have remaining now.

The Class 150s are also hamstrung by the rather inferior power to weight ratio compared to the Class 172s (~8hp/t compared to 10+hp/t) which limits acceleration and thus causes all sorts of problems of which you are almost certainly aware. (The Cl150s, being older units will be even older at the time of the DDA limit... 33 years and up).

The 156s have similar problems with low power to weight ratio (same engine and similar weight), lack of air conditioning or power to add it and an age that will be rapidly hit 35 years (31 years and up at the DDA deadline).
:lol: You’ve just named two of the fastest accelerating DMUs in Britain (barring the Bombardier 22X family, but they’re in a different league entirely), the 150s and the 156s, and decreed that they are in some way underpowered. Have you ever actually travelled on a 150 or 156? Your theoretical maths surrounding power to weight ratios is not borne out by reality. The strength of the 150s and 156s comes from the fact that they are quite lightweight, due to not carrying around any unnecessary bells and whistles that would be superfluous for the sorts of routes they operate.

They are also geared appropriately to provide maximum acceleration. 150s and 156s are not underpowered, it is just that modern regional DMUs are hopelessly inefficient at getting away from a standing start: The 172s are fitted with engines delivering getting on for twice as much power as the 285hp Cummins unit beneath 150s and 156s, undoubtedly expending much more fuel, and yet this has only allowed them to match the performance of the 150s that they replaced: I have seen no signs of any journey time savings becoming apparent since 172s replaced 150s on the Snow Hill lines.

The Class 153s have problems caused by the lightweight construction of the Class 155s, with additional issues caused by the fact that they would either require a massive rebuild in excess of the other 23m sprinters to remove the inside cabs to add more cabin space or would be left with substantially less capacity per unit mass than other units in the fleet.

Class 155s are likewise apparently suffering from the lightweight construction used and have serious sag issues (got this from this forum a while back) and would be poor candidates for rebuild.
The Leyland Sprinters probably are the weak link in the Sprinter family. They do not seem to be built as substantially as the BREL/Metro-Cammell units, and perform sluggishly in my experience. There are indeed problems with body sag on these units, and of course the 153s cannot continue beyond the DDA deadline in their present form.

The Class 158s...have an insufficient power to weight ratio to occupy fast line paths on the railway, are not 100mph
They can get away from a standing start a damn sight quicker than a 170 can, and are better laid out for regional services than Turbostars are.

They will also be 30+ years old at the DDA deadline so the economics of an expensive refit when they will last less than a further decade by all reasonable expectations and are not the best units operationally even now.
Just 30 years old. Without the “+”.

2020 is not the "distant future"... it is only 8 years away
8 years is a considerable lifetime
Come on then, which is it? Is it “only” eight years, or is eight years “a considerable lifetime”?

You may not like it, but the economics of keeping the Sprinters on beyond DDA looks rather shakey
Only to you. Meanwhile, it is evident that various areas of the rail industry have been busy planning for refurbishing the Sprinter fleet to be fully DDA compliant: FNWs’ 150 refurb has made them partially compliant, Porterbrook has a plan for the 156s, and Voith and SWT are proposing to trial a new transmission under one of SWTs’ 158s. If Voith and SWT didn’t envisage a reasonable lease of life being left in the 158s, then they would probably simply aim to run the existing transmissions into the ground if they were due for withdrawal before 2020 anyway.

And given that at the present time there is no outlined strategy for Pacer replacement by the end of the decade, just how do you envisage around 1,000 Sprinter carriages of various classes would also be replaced by 2020 on top of this figure? Even if all the Sprinters are not made DDA compliant, you can bet your bottom dollar that dispensations will be made that allows them to operate beyond 2020.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,401
Additionally, in the late seventies, BR did embark on a refurbishment programme for those first generation DMUs that it had selected to continue on in service for another ten years or so: No less time than the Sprinters should have remaining now.

Was this refurbishment anywhere near as extensive as the one required to meet DDA requirements? (Removal of existing toilets, rebuilding new disabled toilets, removing large numbers of seats, possible rebuilding of the vestibule areas on Class 156/8s to have wider doors. (Chiltern power door sets had to have doors wider than the slam doors were, how much wider are single leaf sprinter doors than HST slam doors?)


:lol: You’ve just named two of the fastest accelerating DMUs in Britain (barring the Bombardier 22X family, but they’re in a different league entirely), the 150s and the 156s, and decreed that they are in some way underpowered. Have you ever actually travelled on a 150 or 156?

Yes, I have travelled on Class 150s repeatedly on various Cornish branch lines and one of the two trains per hour from my home station to Nottingham is a 156 operated service from Skegness, however I always avoid it so I don't bake thanks to the lack of air con.

Your theoretical maths surrounding power to weight ratios is not borne out by reality. The strength of the 150s and 156s comes from the fact that they are quite lightweight, due to not carrying around any unnecessary bells and whistles that would be superfluous for the sorts of routes they operate.

Such as air conditioning, if this is superfluous for the routes they operate.... why has every significant multiple unit order since privatisation had air conditioning installed, even on "inner suburban" units that would never have recieved it under BR.
Even the Class 172s used by London Overground have it, they could have easily just left out the equipment and fitted hopper windows if it was truly superfluous. Indeed is not the presence of air conditioning a primary attraction of London Overground compared to the original service?

They are also geared appropriately to provide maximum acceleration. 150s and 156s are not underpowered, it is just that modern regional DMUs are hopelessly inefficient at getting away from a standing start: The 172s are fitted with engines delivering getting on for twice as much power as the 285hp Cummins unit beneath 150s and 156s, undoubtedly expending much more fuel, and yet this has only allowed them to match the performance of the 150s that they replaced: I have seen no signs of any journey time savings becoming apparent since 172s replaced 150s on the Snow Hill lines.

Whether journey times are reduced is largely irrelevant, the very fact that journey times appear to be around the same they were in the days of Class 150 operation would seem to indicate that they are capable of keeping to timings set for the Class 150.
You are also comparing units geared for 100mph with units geared for 75mph. If we were to re-gear the Class 172 for 75mph I am sure its acceleration would be significantly improved.
These trains provide significantly enhanced capacity (due to reduced numbers of vestibules and the like per train metre), apparently to the degree that London Midland has decided to abandon 3+2 seating on the routes that have converted to Class 172 operation.

A significant fraction of the Class 150 fleet also lacks end gangways and are thus suboptimal if they are used on routes which require units to work in multiple. They are therefore poor candidates for rebuild because, as I understand it, almost the entire fleet is so used.

Meanwhile, on longer distance "regional" services the Class 156 would appear to have a good range of qualities, such as rapid acceleration to reduce travel times on slower routes. However they have longer dwell times than a Class 172 and have no advantage in acceleration.
They are also limited to 75mph which itself stymies any attempt to improve speed on secondary routes, and results in trains operating at lower speed over main line sections to reach the spurs they spend large parts of the journey traversing.
Why improve line speed on a route above SP75 if the only units available for the route are only capable of 75mph?
100mph units with the acceleration of 75mph units would drastically improve the business case for such improvements.
An entirely uniform 100mph capable fleet would be another boon operationally as you would not have the problems Northern currently have with assigning units to inappropriate services.

They can get away from a standing start a damn sight quicker than a 170 can, and are better laid out for regional services than Turbostars are.

The move in the industry is aware from end doors and towards the "commuter" layout with double leaf doors at the third positions, this is typified with the most modern "regional express" unit on the network, the Class 185.
The reduced dwell times improve timetable reliability and can in aggregate represent a low cost way to generate important journey time reductions.
The drastic improvement in the quality of door seals in recent years would seem to largely ameliorate the traditional concerns over draughts and noise, removing one of the key benefits of end doors in this speed range.

Come on then, which is it? Is it “only” eight years, or is eight years “a considerable lifetime”?

8 years is not a significant lifetime for a half million pound rebuild that will produce trains that will not produce large quantities of useful spares at the end of that time.
8 years is a significant lifetime for a far less expensive rebuild that will involve expenditure on equipment (new transmissions) that will generate large numbers of spare parts per unit cost. (as the transmissions are similar if not identical to ones fitted to modern Turbostars).

Only to you. Meanwhile, it is evident that various areas of the rail industry have been busy planning for refurbishing the Sprinter fleet to be fully DDA compliant: FNWs’ 150 refurb has made them partially compliant, Porterbrook has a plan for the 156s, and Voith and SWT are proposing to trial a new transmission under one of SWTs’ 158s.

As far as I understand it it is not Voith who are undertaking the transmission trial, unless a second one is taking place? As I understand it is ZF.... although I could understand that Voith is desperate to avoid loosing the contract although I doubt that they can prevent it.
Partially compliant is not going to cut it, either the trains are compliant or they are not.
Just because the industry is preparing for this solution does not necessarily mean it is the optimal one, everyone knows the DfT is full of idiots who would probably baulk at the thought of new trains when they can make the current ones last a few years longer, even if in the long term it is the worse choice.

If Voith and SWT didn’t envisage a reasonable lease of life being left in the 158s, then they would probably simply aim to run the existing transmissions into the ground if they were due for withdrawal before 2020 anyway.

... again I was not aware of a second trial with a Voith tranmission.
However as I stated fitting a transmission is likely to be far less expensive than fitting brand new interiors, DDA compliant toilets and the like.

And given that at the present time there is no outlined strategy for Pacer replacement by the end of the decade, just how do you envisage around 1,000 Sprinter carriages of various classes would also be replaced by 2020 on top of this figure? Even if all the Sprinters are not made DDA compliant, you can bet your bottom dollar that dispensations will be made that allows them to operate beyond 2020.

They spammed huge numbers of brand new EMUs in a rather short period of time to beat the Mark 1 withdrawal target didn't they?
The Class 172 is a current design and could be easily massed produced at short notice, turning out ~1200 carriages in the next eight years is a tall order, but far from an impossible one.

Not making the Sprinters DDA compliant, but gaining dispensations instead, probably reduces the lifespan of the units further, since they will be a political embarrassment and will continue to age, reducing the lifespan that could be gained from a DDA refit to the point where one becomes uneconomic.
The political problems caused by allowing trains to be used on the network that cannot be used by disabled people will in the long term cause problems as disabled advocacy groups accuse the government of putting money ahead of its commitments to equality.
Therefore the trains would last a handful of years before being withdrawn and scrapped rather than being rebuilt and lasting a couple of handfuls of years.

And this is before we get into the political problems with air pollution caused by such old diesel engines in an era where modern trains face increasingly stringent emissions requirements.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
A lot of this depends on precisely what you are looking for. If your train is mostly going to work rural stopping diagrams on flat land such as in East Anglia, developing something that can accelerate hard to 75mph might save 30 seconds between stops, as opposed to matching the rate of current acceleration and saving 12 seconds per mile for the two miles that you might be running flat-out (so 24 seconds). However, if it has to deal with hills, particularly when stopping at stations on hills as it might in Scotland or the Dales, then low-end power delivery is much more important. Power only factors in at or near top speed (hence an 08 can move the same weight of train as a 60, but very slowly). Unfortunately, we don't have details of DMU tractive effort/weight ratio at various speeds, but that's more important than outright power during most phases of acceleration. That's the important missing factor.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,064
Location
Reston City Centre
An entirely uniform 100mph capable fleet would be another boon operationally as you would not have the problems Northern currently have with assigning units to inappropriate services

Is that really a big problem? There's mention from time to time of a 75mph Pacer deputising for a 90mph 323 on one route, but that's assuming that the 323s (on all stop services, don't forget) are scheduled to do over 75mph on that duty. Even if Northern had 125mph stock I'm struggling to think of any/many services where you'd need to go over 90mph.

Of course a uniform fleet has its advantages, but nobody is seriously suggesting that EMT replace their 75mph 153s with 125mph 222s.

A lot of this depends on precisely what you are looking for

I think that the OP is trying to solve a problem that doesn't really exist (and working backwards to try to justify the answer of "a new class of high speed DMU".
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
The political problems caused by allowing trains to be used on the network that cannot be used by disabled people will in the long term cause problems as disabled advocacy groups accuse the government of putting money ahead of its commitments to equality.
HSTs will won't be able to be used fully independently though after 2020 as a ramp will still need to be used.
 
Last edited:

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,580
Location
Macclesfield
Was this refurbishment anywhere near as extensive as the one required to meet DDA requirements? (Removal of existing toilets, rebuilding new disabled toilets, removing large numbers of seats, possible rebuilding of the vestibule areas on Class 156/8s to have wider doors. (Chiltern power door sets had to have doors wider than the slam doors were, how much wider are single leaf sprinter doors than HST slam doors?)
I didn't think that the power doors fitted to the mark 3 sets were any much wider than their manually operated predecessors: The main reason that the vestibules had to be rebuilt is because the doors have been built a distance inboard of the vehicle ends, rather than wrapping around them. 158s have double leaf doors anyway, albeit narrow ones, so I can't see a need for the doors to be altered on 156s or 158s.

At the time they were built, 158s were billed as being fully disabled accessible. While this will no longer be the case come the more stringent 2020 regulations, the internal layout of the trains, which already have fairly large toilet modules to accomodate a disabled person, means that there might be comparatively little impact on the passenger saloon. The 156s also have large vestibule areas intended for bike, luggage and parcel storage: With the sacrifice of one of them, it would no doubt be possible to fit a fully compliant disabled toilet module with a similarly small impact on the passenger saloon layout.

The BR first gen DMU refurbishment was reasonably thorough. I think as well as the interior aspects it also gave attention to the mechanical components of the trains, which is a reasonable amount of effort to go to for trains with ten years of life left.

Yes, I have travelled on Class 150s repeatedly on various Cornish branch lines and one of the two trains per hour from my home station to Nottingham is a 156 operated service from Skegness, however I always avoid it so I don't bake thanks to the lack of air con.
Ah yes, I had forgotten about the Mediterranean climes of East Lincolnshire that sees many poor, suffering passengers baked every year because of its' sultry weather conditions ;) Who needs the Algarve when you have Skegness! :lol:

Such as air conditioning, if this is superfluous for the routes they operate.... why has every significant multiple unit order since privatisation had air conditioning installed, even on "inner suburban" units that would never have recieved it under BR.
Do 376s have air conditioning? (I honestly don’t know, I just know that they have lots of hopper vents)

Whether journey times are reduced is largely irrelevant, the very fact that journey times appear to be around the same they were in the days of Class 150 operation would seem to indicate that they are capable of keeping to timings set for the Class 150.

You are also comparing units geared for 100mph with units geared for 75mph. If we were to re-gear the Class 172 for 75mph I am sure its acceleration would be significantly improved.

These trains provide significantly enhanced capacity (due to reduced numbers of vestibules and the like per train metre), apparently to the degree that London Midland has decided to abandon 3+2 seating on the routes that have converted to Class 172 operation.
That's precisely my point: Despite a class 172 having almost twice the power of a 150, they still can’t do any better than them, only match them. This completely negates your argument that 150s are “underpowered”, which is what my previous post was in response to. Because 172s are geared for 100mph, they are not optimally set up for frequent stop suburban services, unlike 150s.
I think that the main driving factor for LM choosing 2+2 seating on the 172s was to increase the amount of standing room, as well as recognising the fact that 3+2 seating is unnecessarily narrow when the third seat is rarely used for its’ intended purpose.

A significant fraction of the Class 150 fleet also lacks end gangways and are thus suboptimal if they are used on routes which require units to work in multiple. They are therefore poor candidates for rebuild because, as I understand it, almost the entire fleet is so used.
150s would be perfectly suitable to replace 153s on the rural and low demand services where they work singly. 150s are hardly alone in being without gangways when working in multiple, it is a scenario repeated the country over with 170s.

As far as I understand it is not Voith who are undertaking the transmission trial, unless a second one is taking place?
That’ll just be me getting confused between transmission manufacturers then, sorry.
Just because the industry is preparing for this solution does not necessarily mean it is the optimal one, everyone knows the DfT is full of idiots who would probably baulk at the thought of new trains when they can make the current ones last a few years longer, even if in the long term it is the worse choice.
It sounds suitably cost effective to me.

However as I stated fitting a transmission is likely to be far less expensive than fitting brand new interiors, DDA compliant toilets and the like.
All of which will probably be required if any TOC hopes to gain a decent amount of utilisation out of new transmissions fitted to its’ fleet.

The Class 172 is a current design and could be easily massed produced at short notice, turning out ~1200 carriages in the next eight years is a tall order, but far from an impossible one.
In four years, more accurately. Rolling stock replacement is of course not written into the present Northern Rail franchise for starters, who operate a substantial number of Pacer and Sprinter units, and procurement is highly unlikely to start now with the franchise so close to its’ end. Even if replacement of the entirety of Northerns’ Pacer and Sprinter fleets was set out as a top priority to commence from day 1 of the franchise, then the protracted nature of the procurement process, followed by construction and delivery means that it would be 2016 at the earliest when the very first new trains were delivered.
The political problems caused by allowing trains to be used on the network that cannot be used by disabled people will in the long term cause problems as disabled advocacy groups accuse the government of putting money ahead of its commitments to equality.
Sprinters can be used by disabled people. Just not to the fullest extent that is the aspiration of the 2020 regulations.
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
Does the DDA requi all trains to have those massive toilets or is it just wheelchair priority spaces, priority seats, level access train <>platform etc.??
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,064
Location
Reston City Centre
Does the DDA requi all trains to have those massive toilets or is it just wheelchair priority spaces, priority seats, level access train <>platform etc.??

If you have a toilet/toilets on board then you need at least one that's accessible.

I've suggested in the past that some trains may end up with no toilets, because that's one way of getting round it (not as "convenient" of course)
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,827
Location
Central Belt
Yes, I have travelled on Class 150s repeatedly on various Cornish branch lines and one of the two trains per hour from my home station to Nottingham is a 156 operated service from Skegness, however I always avoid it so I don't bake thanks to the lack of air con.

LOL - I am glad the 158s on EMT have got thier air-conditioning fix then! The ones in Scotland certainly haven't. Most posters on this thread seem to think that a 156 with open windows is better than a 158 with failed air-conditioning. The worse train in the world is any air-conditioned train once it has failed when you can't open the windows, at least you can open some on the 158.

I digress, you would rather drive to Nottingham and risk getting stuck in traffic at just because the 156 doesn't have air-conditioning.

I don't think with the climate of the UK air-conditioning is high on the agenda.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,401
I digress, you would rather drive to Nottingham and risk getting stuck in traffic at just because the 156 doesn't have air-conditioning.

Nope.....
I just get the Liverpool-Norwich 158 that makes up the other train per hour to Nottingham, that is 15 minutes away from it in the timetable.
I have not seen a single hopper vent open on the 158s all year as a matter of fact, even during that really hot and humid period we had early in the year. The air con actually seems to work.

As to the supposed safety problems of the Pacers.... has there been a relatively high speed collision with an early model Sprinter?
What crash standards are they built to?

EDIT:

Did some interesting searching about the Class 150's Cummins NT855 diesel engine.
Apparently at rated output it consumes roughly 57 litres of diesel per hour and produces roughly ~286hp.
For comparison the 1800 series MTU diesel used in the Class 172 uses 87.6L of diesel per hour and produces roughly 485hp.

This means the NT855 produces approximately 5.01hp-hours per litre of fuel burned
The 1800 series R85 produces roughly 5.53hp-hours per litre of fuel burned
The R85 is thus roughly 10% more efficient.

If we assume that both engines spend most of the time in the fairly flat portion of the fuel efficiency/power output curve this means that fuel consumption should be roughly proportional to train weight.

A ~42t Class 172 should thus have similar fuel consumption to a 37.8t train with an engine from the NT855 "era"... which is obviously heavier than the Class 150, but not by that much.

If we were to use an awfully crude measure of accounting for the Class 172's greater carriage capacity (thanks to length) and simply scale by length it means the Class 150 would have to be 32.87t to match its fuel consumption.

You obviously can't use that compensation on the Class 156, but it would appear that the Class 150 may be less fuel efficient per unit capacity than the Class 172, while the Class 156 is slightly more efficient than the Class 172, but the Class 172 has greater top speed.
 
Last edited:

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Nope.....
I just get the Liverpool-Norwich 158 that makes up the other train per hour to Nottingham, that is 15 minutes away from it in the timetable.
I have not seen a single hopper vent open on the 158s all year as a matter of fact, even during that really hot and humid period we had early in the year. The air con actually seems to work.

As to the supposed safety problems of the Pacers.... has there been a relatively high speed collision with an early model Sprinter?
What crash standards are they built to?

Roughly the same as MkIIIs, on which they are based. I imagine that integrity is not as good for the 150s (and all the EMUs) because of having four huge holes in the side for doors, but they're good, solid, monocoque construction vehicles.

Personally, I'd get the 156 so that I could have all the windows open and sit in the comfy seats, but that's just me.

Did some interesting searching about the Class 150's Cummins NT855 diesel engine.
Apparently at rated output it consumes roughly 57 litres of diesel per hour and produces roughly ~286hp.
For comparison the 1800 series MTU diesel used in the Class 172 uses 87.6L of diesel per hour and produces roughly 485hp.

This means the NT855 produces approximately 5.01hp-hours per litre of fuel burned
The 1800 series R85 produces roughly 5.53hp-hours per litre of fuel burned
The R85 is thus roughly 10% more efficient.

If we assume that both engines spend most of the time in the fairly flat portion of the fuel efficiency/power output curve this means that fuel consumption should be roughly proportional to train weight.

A ~42t Class 172 should thus have similar fuel consumption to a 37.8t train with an engine from the NT855 "era"... which is obviously heavier than the Class 150, but not by that much.

If we were to use an awfully crude measure of accounting for the Class 172's greater carriage capacity (thanks to length) and simply scale by length it means the Class 150 would have to be 32.87t to match its fuel consumption.

You obviously can't use that compensation on the Class 156, but it would appear that the Class 150 may be less fuel efficient per unit capacity than the Class 172, while the Class 156 is slightly more efficient than the Class 172, but the Class 172 has greater top speed.

Thanks, that's very interesting. The case for 172s replacing 150s and suburban Pacers looks very strong. There's still the question of top speed vs acceleration, where I'd tend to favour acceleration because it is more likely to save time than increasing top speed when you have frequent stops. Still, I'd support Northern getting a good 100-150 X 172s to replace most Pacers and 150s. I'd hang onto the 156s for now, allowing them back onto the Morecambe route and with a few route changes to concentrate 158s on places where they could use 90mph speeds more effectively.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,580
Location
Macclesfield
As to the supposed safety problems of the Pacers.... has there been a relatively high speed collision with an early model Sprinter?
What crash standards are they built to?
150209 derailed at St Helens Central in November 1988, and collided with a bridge abutment, writing off vehicle 52209:
http://www.railphotoarchive.org/rpc_zoomx.php?img=0478022681000&aid=

And 150212 collided with a Civil engineers’ crane in December 1987, writing off vehicle 52212. Both of these vehicles were scrapped at Vic Berrys’ in Leicester in 1989 (Information taken from a post on the Northern Railways forum).

Additionally if you take a look at this webpage, class 156s have been involved in a number of collisions down the years, but they have all been repaired and returned to service.
http://members.madasafish.com/~dysgraphyk/156/class156_mishaps.htm
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,827
Location
Central Belt
Nope.....
I just get the Liverpool-Norwich 158 that makes up the other train per hour to Nottingham, that is 15 minutes away from it in the timetable.
I have not seen a single hopper vent open on the 158s all year as a matter of fact, even during that really hot and humid period we had early in the year. The air con actually seems to work.
So you wouldn't use the train then if didn't live at Grantham and have the option of the 158. I bet the 156s haven't had the hopper vents open much either. But in repeat there are not many days that are that hot in the UK anyway. But there is no point in having air-conditioning on frequently stopping routes. Will people stop travelling from Potters Bar - London by train if they don't provide air-conditioning or Harrogate - Leeds? No because travelling a train with its windows open is much nicer than sat in a car with airconditioning - in a traffic jam!

Some routes have competition with coaches / buses but normally the times don't compete.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,064
Location
Reston City Centre
Did some interesting searching about the Class 150's Cummins NT855 diesel engine.
Apparently at rated output it consumes roughly 57 litres of diesel per hour and produces roughly ~286hp.
For comparison the 1800 series MTU diesel used in the Class 172 uses 87.6L of diesel per hour and produces roughly 485hp.

This means the NT855 produces approximately 5.01hp-hours per litre of fuel burned
The 1800 series R85 produces roughly 5.53hp-hours per litre of fuel burned
The R85 is thus roughly 10% more efficient.

If we assume that both engines spend most of the time in the fairly flat portion of the fuel efficiency/power output curve this means that fuel consumption should be roughly proportional to train weight.

A ~42t Class 172 should thus have similar fuel consumption to a 37.8t train with an engine from the NT855 "era"... which is obviously heavier than the Class 150, but not by that much.

If we were to use an awfully crude measure of accounting for the Class 172's greater carriage capacity (thanks to length) and simply scale by length it means the Class 150 would have to be 32.87t to match its fuel consumption.

You obviously can't use that compensation on the Class 156, but it would appear that the Class 150 may be less fuel efficient per unit capacity than the Class 172, while the Class 156 is slightly more efficient than the Class 172, but the Class 172 has greater top speed.

You've got a load of stats about things, but nothing that shows a real need for the class 223 that this thread is supposedly about, sorry. I'm out.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
LOL - I am glad the 158s on EMT have got thier air-conditioning fix then! The ones in Scotland certainly haven't. Most posters on this thread seem to think that a 156 with open windows is better than a 158 with failed air-conditioning. The worse train in the world is any air-conditioned train once it has failed when you can't open the windows, at least you can open some on the 158.
Not much use though on a train where other passengers insist on having the windows closed. I was on a 150 once on a hot day and opened the window, only to have another passenger insist on having the window closed.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,827
Location
Central Belt
Not much use though on a train where other passengers insist on having the windows closed. I was on a 150 once on a hot day and opened the window, only to have another passenger insist on having the window closed.

The problem is you are a nice person, I would have just opened it again and told them to put their coat on if they are cold. I know you have the opposite problem with people opening windows in the winter. Airconditioning doesn't make things better I have travelled on 185s in the winter that were freezing to the extent I had my coat fully zipped up and was glad to get off. Likewise I was recently on a 170 that was too hot in the rare bit of sun we have. Moved down the entire train invade there was a fault in my coach, boiling throughout. In both cases the temperature was set to the wrong level to the outside temperature. So air-condition does not always make happy passengers compared to cars where you set the temperature or open the window.
 

junglejames

Established Member
Joined
8 Dec 2010
Messages
2,069
Since it has an electric transmission and a similar power to weight to a HST it will perform similarily to a HST at higher speeds, and will be superior at lower speeds due to the higher percentage of weight on its driven axles.

What engine is providing the power is largely irrelevant, with an electric transmission all that matters is the gearing on the traction motor final drives and how much power it can develop.
Electric transmissions are inherently more able to develop both higher speeds and higher starting tractive efforts than the mechanical/hydraulic transmissions used in Sprinter derived units, as you demonstrate yourself with your reference to Class 168 timings compared to load 6 Class 67s.

No, the 67/ 168 comparison has little to do with the transmission. Its down to the nice amounts of power the 67 has. However i was just using it to show a HST would be better than your new 223.
Yes, a diesel electric setup would provide better acceleration, but then that is reduced by gearing it for 125, and by adding an extra unpowered coach onto it. Overall, you would surely have worse acceleration than a 172 at present.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,401
No, the 67/ 168 comparison has little to do with the transmission. Its down to the nice amounts of power the 67 has. However i was just using it to show a HST would be better than your new 223.
Yes, a diesel electric setup would provide better acceleration, but then that is reduced by gearing it for 125, and by adding an extra unpowered coach onto it. Overall, you would surely have worse acceleration than a 172 at present.

I don't recall making any comparisons to the Class 172.... it would have similar acceleration to a HST in the power-limited regime, and greater acceleration than the HST in the traction-limited regime. (Due to the greater proportion of train weight on the driven axles)
 

junglejames

Established Member
Joined
8 Dec 2010
Messages
2,069
I don't recall making any comparisons to the Class 172.... it would have similar acceleration to a HST in the power-limited regime, and greater acceleration than the HST in the traction-limited regime. (Due to the greater proportion of train weight on the driven axles)

I know you never made a 172 comparison. Im just saying that your train would have worse acceleration than a 172, which in turn has worse acceleration than a HST I believe.
I just cannot imagine this fantasy 223 having better acceleration than a HST at any range.

Anyway, I just cannot see a need for it. IEP will give us plenty, and if the voyagers/ meridians are given a panto car, with the 222s replaced after electrification, we have plenty of bimodes. Away from XC, FGW and EC (GC included), nobody needs bimodes. Adding bimodes to a route just because it may have a handful of miles of wires is daft. You just add cost to a franchise for next to no benfit. The amount of miles under the wires would be so small, they probably wouldnt bother shutting the engines down!
 
Status
Not open for further replies.

Top