Haywain
Veteran Member
- Joined
- 3 Feb 2013
- Messages
- 24,582
Thanks, the reason for asking is that I have been told that drivers are not specifically told which signals are approach controlled and there is an obvious link to this subject.AFAIK, no. As it's a fully signalled move, their route knowledge training will (should) cover this situation.
I only really interacted with them at a technical level (modelling runtimes and junction margins) rather than an operational one so I may be wrong on this.