The Barlow Boy
Member
- Joined
- 29 Aug 2010
- Messages
- 696
Conversely the Long Bridge on the Euston - Watford DC line under the City Goods Lines at Willesden is 147 yards long.
This difference between a tunnel and a bridge has more than one answer, as it depends why you are asking the question a bit like 42 and the meaning of life etc.
The list of tunnels in the Sectional Appendix is a list of those structures the operating department wanted their train drivers and signalmen to carry out the rules relating to working in tunnels.
The length qualification usually derives from structures inspection, where over a certain length the inspection is carried out in sections rather than as a whole. Different companies and regions had different standards, so what would be a tunnel to one works section would be a bridge to another.
A more pure Civils definition is based on how the structure was formed.
A tunnel is bored (or tunnelled) through an existing feature.
A bridge is a built structure that spans over something.
A covered way is where a hole is dug and a structure built that is then buried when the hole is backfilled.
But the bottom line is, that for railway operating purposes if it's listed in table "A" as a tunnel it is one. Otherwise it's a bridge or covered way.
