Thank you so much! This answers my question perfectly!It detects the presence of traction current for display on a P Crid. This is a permanent current rail indicator device which are on tunnel walls or other standalone locations. These assets were installed by Tube Lines across the Jubilee, Northern and Piccadilly line and display the status of traction current.
I guess this implies the prior existence of portable, temporary CRIDs that would have been used by engineering teams for safety checklists?It detects the presence of traction current for display on a P Crid. This is a permanent current rail indicator device which are on tunnel walls or other standalone locations. These assets were installed by Tube Lines across the Jubilee, Northern and Piccadilly line and display the status of traction current.
I think I read somewhere they are due for replacement with an updated version soon, but happy to be corrected.As put above, It's a PCRID installed on the JNP lines only and are no longer (if ever) used for safety critical decisions.
Yes, they’ve awarded a contract to Drallim Industries for this (subscription only article which I can’t read, so that’s all I know!)I think I read somewhere they are due for replacement with an updated version soon, but happy to be corrected.
UK: London Underground has awarded Drallim Industries a contract to design, manufacture and service an enhanced version of the Permanent Current Rail Indicating Device.
UK: London Underground has awarded Drallim Industries a contract to design, manufacture and service an enhanced version of the Permanent Current Rail Indicating Device.
The permanently-fixed traction current status indicators are designed to reduce the risk of staff accessing the track when the traction current is switched on, or when its status cannot be determined.
Drallim manufactured the original version from 2007.
Announcing the latest contract on February 26, the Sussex-based company said advances in high voltage and power backup electronics now offer the opportunity to replace the ageing installed base and to expand deployment to the whole London Underground network.
The second generation PCRID will be optimised for fast installation and swap-out maintenance, with a 90 h internal backup battery suitable for on-site replacement. It will be lightweight and robust with upgraded ingress protection ad Safety Level 2 certified, and will tolerate regenerated power.
Yes, portable CRIDs (simply CRIDs) are an essential piece of kit for anyone accessing LUL track.
Despite the providence of PCRIDs on former Tube Lines/JNP lines, they were never fully signed off for use to replace the CRID.
More on a CRID here: https://www.unipartrail.com/wp-content/uploads/2020/04/st-crid.pdf