This is a new thread to answer the following question by @Class15 in the EWR Countdown discussion.
Well, that's a good question. After thinking about it for a while, I'd say there are six reasons, but not necessarily in this order:
Genuine question for you here, and not only about this post: why are you so anti-electrification?
Well, that's a good question. After thinking about it for a while, I'd say there are six reasons, but not necessarily in this order:
- At £3-5 million per stk, 25kV OHLE is grossly expensive and the railway industry doesn't seem capable of reducing that cost. I've not seen any business cases for electrification that make economic sense - even if you allow 60 years to recoup that investment.
- The technology of overhead wires is rapidly being overtaken by advances in battery technology. It seems clear to me that in ten years time, continuous electrification by OHLE will be seen as an expensive mistake. Yet we taxpayers will still be paying interest for decades on the extra national debt incurred to pay for those stranded assets.
- Installing OHLE this decade uses up resources in the National Grid that should be directed at providing connections for BESS grid batteries and transmission capacity to allow faster roll out of renewable resources. That's the fastest route to decarbonisation.
- Current electrification practice results in grossly overspecified kit. One example is Braybrooke grid feeder: the capacity of the two 80 MVA grid circuits exceed the total power uptake of all EMRs 810s (33 x 3MW) plus all their 360s (21 x 1.5MW), all accelerating at full throttle simultaneously and all taking their power only from Braybrooke. The second grid transformer at Braybrooke is a complete waste, given that the only trains passing it will be diesel bimodes with built-in [N-1] redundancy.
- Current projects are putting wires and grid connections in the wrong place. Today's priority should be grid connections to the WCML north of Crewe, and the ECML in Northumberland, where those connections are needed today. New electrification projects should be directed to places like Exeter and Inverness, where they will be needed in future, rather than places like Tweedbank, which is well within the round-trip range of battery EMUs that could and should be ordered today.
- I'm not against electrification as such, just the way it is being done now. I do support the plans to electrify the routes to Saltburn and Hull with overhead recharging of BEMUs at the terminal stations, with battery boost to reduce the cost of the grid connections there.