May I suggest that the Werrington dive under could have been done better.

If the down fast, up fast and up slow had gone down into a subterranean box, a junction with the Spalding line could have got trains over the top without conflicting with the main lines.

Add to this an extra left-hand turnout from the up slow before the dive under to then also cross the box to join the Stamford lines, and you would also remove the need for Liverpool - Norwich services to cross over at Spital Bridge Jn.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yoyothehobo

Member
Joined
21 Aug 2015
Messages
853
The line speed on the fasts at the Werrington are 125mph on the fasts. This means you would need an absolutely massive "box" with which to get the gradients in, also a 3 line wide box would be very expensive.

Groundwater conditions in the area were also very difficult making construction even more difficult than it already was.

You would also struggle to construct such a box without massive disruption to the ECML for an extended period.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,392
Location
The Fens
Here is how the Werrington tunnel was built:


A £200m railway tunnel dubbed a "UK engineering first" has been officially opened by the rail minister.

The Werrington Tunnel was created by "pushing" an 11,000-tonne concrete curve under the East Coast Main Line (ECML) near Peterborough.

The "dive-under" system is designed to take freight traffic off the passenger routes - and took a year to build.

The same construction technique could not have been used if the box had needed to contain 3 ECML tracks.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,585
Location
Northampton
May I suggest that the Werrington dive under could have been done better.

If the down fast, up fast and up slow had gone down into a subterranean box, a junction with the Spalding line could have got trains over the top without conflicting with the main lines.

Add to this an extra left-hand turnout from the up slow before the dive under to then also cross the box to join the Stamford lines, and you would also remove the need for Liverpool - Norwich services to cross over at Spital Bridge Jn.
That's all very well, but 1. How much extra would all of this cost, 2. How much more disruptive would it have been to do, and 3. how much extra benefit would it have got?

The Liverpool-Norwich cross is 1 movement per hour in 1 direction, of a reasonably short unit. The bigger issue is the need for freight trains into/out of Peterborough yard to/from Stamford or Ely to still use the flat crossings. To that end the change I would make would be a new grade-separated movement from Up Stamford to Up Slow at Helpston Jn, and to make the Up Slow bi-di between there and Peterbrough so Down freight from the Yard doesn't have to cross the fasts.
If possible, squeezing in a tight curve from the Up Slow to the Up March just south of the station would then mean that only 1 freight movement was required to cross the fasts on the flat (Down Ely to the yard), although I'd retain the junction themselves for flexibility.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,392
Location
The Fens
To that end the change I would make would be a new grade-separated movement from Up Stamford to Up Slow at Helpston Jn, and to make the Up Slow bi-di between there and Peterbrough so Down freight from the Yard doesn't have to cross the fasts.
If possible, squeezing in a tight curve from the Up Slow to the Up March just south of the station would then mean that only 1 freight movement was required to cross the fasts on the flat (Down Ely to the yard), although I'd retain the junction themselves for flexibility.
That's all very well, but 1. How much extra would all of this cost, 2. How much more disruptive would it have been to do, and 3. how much extra benefit would it have got?
Which trains do you have in mind that need to get between the Stamford lines and the yards at Peterborough? Most freight on the Stamford lines runs through to/from the March line and passes under the ECML near the bridges over the River Nene. The up slow is already bi-directional between Peterborough station and Werrington, for passenger trains departing the up side at Peterborough and going towards Spalding.

The proposed curve from the up slow, south of the station, onto the March line has no feasible alignment and also requires a very expensive bridge over the River Nene. There is a significant height difference between the two existing rail bridges over the river, as anyone who has walked to the Nene Valley Railway's station will know.

If we are worrying about remaining at grade conflicting moves across the ECML at Peterborough then highest priority are the morning peak ECS moves out of Nene sidings.
 

jamieP

Member
Joined
27 Feb 2012
Messages
311
Which trains do you have in mind that need to get between the Stamford lines and the yards at Peterborough? Most freight on the Stamford lines runs through to/from the March line and passes under the ECML near the bridges over the River Nene. The up slow is already bi-directional between Peterborough station and Werrington, for passenger trains departing the up side at Peterborough and going towards Spalding.

The proposed curve from the up slow, south of the station, onto the March line has no feasible alignment and also requires a very expensive bridge over the River Nene. There is a significant height difference between the two existing rail bridges over the river, as anyone who has walked to the Nene Valley Railway's station will know.

If we are worrying about remaining at grade conflicting moves across the ECML at Peterborough then highest priority are the morning peak ECS moves out of Nene sidings.

Still get a freights running across the junctions at Spital and New England Nth Jn to access the GBRf depot. Not much can be done about them all the ECS from the Nene without completely rebuilding the railway at and around Peterborough. The Werrington diverunder does what it was built for.
 
Status
Not open for further replies.

Top