That is far from given. Bigger box capability doesnt mean more capacity. Two plus two doesnt make four here. We need more W10 first.So clearly preparing for a huge increase in freight by rail - good news.
No, just a contemporary benefit of Electrification - clearance for wires almost always results in clearance for boxes.So clearly preparing for a huge increase in freight by rail - good news.
AIUI it will, although it won't be fully OLE-ready.I wonder if EWR will also be W12 cleared once Bicester - Bletchley is fully open?
I'm sure I read a while ago that all new lines are built to W12 standard.I wonder if EWR will also be W12 cleared once Bicester - Bletchley is fully open?
Correct.AIUI the vast majority of intercontinental container traffic fits within W10, and there’s no intention to change that.
Just send a DM me an email address to send login details to.No, just a contemporary benefit of Electrification - clearance for wires almost always results in clearance for boxes.
AIUI it will, although it won't be fully OLE-ready.
@Legolash2o would it be possible to make the Overall Loading Gauge views viewable without login, or should I DM you about access (I'm no longer with NR so my old login certainly won't work).
EWR doesn't technicallly count as a new lineI'm sure I read a while ago that all new lines are built to W12 standard.
CheersJust send a DM me an email address to send login details to.
It'd be a rare arch that was clear at the centre but not at the corners, but yes it's theoretically possible.Electrification doesn't necessarily give W12 clearance. An arched bridge or tunnel may well be clear for the wires, but the corners of the boxes foul the arch.
Not a problem. I've also got to map the new W7A, W8A, W9A and W10A gauges as well if anyone is interested in seeing those maps.BTW @Legolash2o - thanks for the maps and the post/thread
I would have thought it was quite a common situation. Where an arched bridge exists over a double track line, it will be highest in the middle, and I would have thought it would often happen that that highest point would be higher than the top of the rectangle that defines the required cross section. But the top corners of the rectangle will often be higher than the arch.It'd be a rare arch that was clear at the centre but not at the corners, but yes it's theoretically possible.
W10 and W9plus/A would be good to see.Not a problem. I've also got to map the new W7A, W8A, W9A and W10A gauges as well if anyone is interested in seeing those maps.
I'd be surprised if many arch bridges had a small enough arch radius that they were clear for a Pantograph and contact wire but still clipped W12 is all. I don't doubt it happens especially in areas where the dynamic profile for W12 is quite large.I would have thought it was quite a common situation. Where an arched bridge exists over a double track line, it will be highest in the middle, and I would have thought it would often happen that that highest point would be higher than the top of the rectangle that defines the required cross section. But the top corners of the rectangle will often be higher than the arch.
I think we're at cross purposes. I wasn't assuming that the arch would be clear for electrification, merely that it could be higher at its highest point than the minimum height for a hypothetical rectangular-section bridge that was clear for electrification.W10 and W9plus/A would be good to see.
== Doublepost prevention - post automatically merged: ==
I'd be surprised if many arch bridges had a small enough arch radius that they were clear for a Pantograph and contact wire but still clipped W12 is all. I don't doubt it happens especially in areas where the dynamic profile for W12 is quite large.