• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

VIDEO: dog stops train at paignton level crossing

Status
Not open for further replies.

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,419
Location
Back in Sussex
I'd pedestrianise Torbay Road - it has been proposed - close the level xing and provide an underpass for pedestrians / cyclists. It would be a wide, open underpass with shallow ramps so as not to attract anti- social behaviour. Plent of examples on the Netherlands where flat xings have been replaced.

Since we left Torbay 4 years ago I believe they've had a failed attempt to pedestrianise Torbay Rd, just catching the odd news article I think it was a complete failure and almost bankrupted the majority of local businesses, very much like most Torbay council decisions in my experience, I think the main sea front road either is or is likely to get the same treatment with the council wasting money while the entire infrastructure of Torbay falls apart
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,481
Location
Gomshall, Surrey
I wonder about the logic of NOT allowing the train to continue at a slow crawl into the station. The dog would be fine at 1mph and the train would be out of the way of the LC, and passengers could disembark. I'm not criticising the driver, but just questioning the logic in this (unusual) situation.
 

bleeder4

Member
Joined
19 Jan 2019
Messages
792
Location
Worcester
Since we left Torbay 4 years ago I believe they've had a failed attempt to pedestrianise Torbay Rd, just catching the odd news article I think it was a complete failure and almost bankrupted the majority of local businesses, very much like most Torbay council decisions in my experience, I think the main sea front road either is or is likely to get the same treatment with the council wasting money while the entire infrastructure of Torbay falls apart
Yes, it was pedestrianised during 2022 but local shops were up in arms about it. I was in Paignton at the time and all the shops had banners up about it protesting about it as it was negatively affecting their trade. Then the council tried one way traffic for a time, but went back to full two way traffic. Basically, there is zero local desire for pedestrianisation.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
Yes, it was pedestrianised during 2022 but local shops were up in arms about it. I was in Paignton at the time and all the shops had banners up about it protesting about it as it was negatively affecting their trade. Then the council tried one way traffic for a time, but went back to full two way traffic. Basically, there is zero local desire for pedestrianisation.
And that weird blue junction where Torbay Road meets Queens Road.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,587
Location
Torbay
Yes, it was pedestrianised during 2022 but local shops were up in arms about it. I was in Paignton at the time and all the shops had banners up about it protesting about it as it was negatively affecting their trade. Then the council tried one way traffic for a time, but went back to full two way traffic. Basically, there is zero local desire for pedestrianisation.
By a previous Lib Dem/Ind admin, following support from the broader town population in a consultation. It was reversed very quickly by incoming Tories, the very first thing they did, after business owners started complaining vociferously that they could no longer park their personal cars immediately outside their front doors, sorry I mean that their customers (the vast majority on foot) couldn't access their stores. The problem with closing Torbay Road and the level crossing to traffic is there are few suitable alternative roads crossing the railway through the town.

I agree about underpasses generally but this site might be a challenge as it's rather low. The entire area between railway and current sea wall is reclaimed salt marsh. The railway embankment rises a little above that, and sea defences are planned to be improved over the next few years. The Netherlands manages to construct underpasses all over the place of course, in a country where much of the land is below sea level! If a wide underpass was practical at Paignton, the south side of it might be fenced off as 'railside' with separate platform access ramps, a way to achieve step-free access to platform #1 from the booking office side without leaving the station. That could allow Paignton to become ticket-gated with only one barrier line on the town side.

The big advantage of going under rather than over is you only have to clear a human or cyclist rather than the tallest rail vehicle plus electrification clearances etc, so ramps can be significantly shorter. The UK seems to have a particular aversion to underpasses, no doubt partly due to some very poorly designed implementations from the 1960s and 70s, and lack of subsequent maintenance and security monitoring. In many town centre developments today, examples from this period are being removed. Making approach ramps broad and open, ensuring there aren't any hidden areas etc, can help design out antisocial potential.

Another possibility might be that the crossing could be closed to normal traffic, but full vehicle access to the road might be retained as a cul-de-sac from the east (the sea front side). That would divorce the level crossing issue from the business premises access issue, though they'd still no doubt start moaning about loss of 'passing trade'.
 
Last edited:

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,190
Location
Wilmslow
By a previous Lib Dem/Ind admin, following support from the broader town population in a consultation. It was reversed very quickly by incoming Tories, the very first thing they did, after business owners started complaining vociferously that they could no longer park their personal cars immediately outside their front doors, sorry I mean that their customers (the vast majority on foot) couldn't access their stores. The problem with closing Torbay Road and the level crossing to traffic is there are few suitable alternative roads crossing the railway through the town.

I agree about underpasses generally but this site might be a challenge as it's rather low. The entire area between railway and current sea wall is reclaimed salt marsh. The railway embankment rises a little above that, and sea defences are planned to be improved over the next few years. The Netherlands manages to construct underpasses all over the place of course, in a country where much of the land is below sea level! If a wide underpass was practical at Paignton, the south side of it might be fenced off as 'railside' with separate platform access ramps, a way to achieve step-free access to platform #1 from the booking office side without leaving the station. That could allow Paignton to become ticket-gated with only one barrier line on the town side.

The big advantage of going under rather than over is you only have to clear a human or cyclist rather than the tallest rail vehicle plus electrification clearances etc, so ramps can be significantly shorter. The UK seems to have a particular aversion to underpasses, no doubt partly due to some very poorly designed implementations from the 1960s and 70s, and lack of subsequent maintenance and security monitoring. In many town centre developments today, examples from this period are being removed. Making approach ramps broad and open, ensuring there aren't any hidden areas etc, can help design out antisocial potential.

Another possibility might be that the crossing could be closed to normal traffic, but full vehicle access to the road might be retained as a cul-de-sac from the east (the sea front side). That would divorce the level crossing issue from the business premises access issue, though they'd still no doubt start moaning about loss of 'passing trade'.
Interesting, thanks. I was shocked at how sad and decrepit Paignton is these days - an underpass and pedestrianisation would be a good regeneration project. The whole Torbay area is so ludicrously car dependent - what should be a pleasant, scenic walk from Torquay to Paignton is a fume-filled nightmare. Ideal territory for a tram system - but that is a topic for another thread!
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,517
Interesting, thanks. I was shocked at how sad and decrepit Paignton is these days - an underpass and pedestrianisation would be a good regeneration project. The whole Torbay area is so ludicrously car dependent - what should be a pleasant, scenic walk from Torquay to Paignton is a fume-filled nightmare. Ideal territory for a tram system - but that is a topic for another thread!
An underpass would be an atrocious addition to the town! Even the nicest ones are gloomy, damp, graffiti covered and smell of urine. The walk from Paignton high st to the beach is already unattractive, an underpass would finish ripping the heart out of this town.

If the level crossing is unacceptable and can't be fixed by reducing closed time (by improving signalling and adding a crossover so trains can depart from either platform) then the best solution for redevelopment would be to move the station across the road. The crossing would still be needed for occasional moves to the steam railway and Goodrington sidings, but would be open almost all the time. A new station would no doubt be a much nicer gateway to the town than the current run down one.

As a local, I very much support proper pedestrianisation of this road. It could and should be an attractive spacious boulevard to the sea.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
An underpass would be an atrocious addition to the town! Even the nicest ones are gloomy, damp, graffiti covered and smell of urine. The walk from Paignton high st to the beach is already unattractive, an underpass would finish ripping the heart out of this town.

If the level crossing is unacceptable and can't be fixed by reducing closed time (by improving signalling and adding a crossover so trains can depart from either platform) then the best solution for redevelopment would be to move the station across the road. The crossing would still be needed for occasional moves to the steam railway and Goodrington sidings, but would be open almost all the time. A new station would no doubt be a much nicer gateway to the town than the current run down one.

As a local, I very much support proper pedestrianisation of this road. It could and should be an attractive spacious boulevard to the sea.

Not sure you’d want to build a station on a 1:80 gradient really? There wouldn’t be much space for station facilities and/or transport interchange. Sounds pretty impractical and customer-unfriendly in the extreme.
 

michael74

Member
Joined
3 Jul 2014
Messages
585
I wonder about the logic of NOT allowing the train to continue at a slow crawl into the station. The dog would be fine at 1mph and the train would be out of the way of the LC, and passengers could disembark. I'm not criticising the driver, but just questioning the logic in this (unusual) situation.
The logic is the train is only just over a train length from it's stop board, while I don't know off the top of my head what the maximum speed approxing the SB would be, it's going to be slow anyway.

Also the driver can clearly see a lot of people at the barriers where there is history of people who clearly think that those barriers are mere ornaments to be disregarded l, it's a warm day and people have likely had a couple of shandys; and in this case the second something is amiss Mr Stella (note the sunburn so has been in the beer garden some time)leaps over the barriers to "save the day......"
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,517
Not sure you’d want to build a station on a 1:80 gradient really? There wouldn’t be much space for station facilities and/or transport interchange. Sounds pretty impractical and customer-unfriendly in the extreme.
There are several adjacent buildings on both sides of the tracks that could be demolished as part of a wider redevelopment of the area. The gradient sounds like more of an issue, but probably not impossible to solve (e.g. By changing the profile of the track over the embankment and lowering the park underpass a little.

If done well it would give a much better first impression of the town, and would remove the level crossing challenges, but it would need to be a part of a wider redevelopment.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,780
Location
SW London
An underpass would be an atrocious addition to the town! Even the nicest ones are gloomy, damp, graffiti covered and smell of urine.
In the UK maybe, but the Dutch do it well, and I recently saw the one in Konstanz which is also wide, spacious, well lit and thus well used.
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,517
In the UK maybe, but the Dutch do it well, and I recently saw the one in Konstanz which is also wide, spacious, well lit and thus well used.
Hmmmm

It's going to have to go down at least 3m to give a nice un-oppressive 2.5m headroom. With a 1:12 minimum slope and intermediate landings, that's going to need over 40m long ramps on both sides.

There's less than 35m to Victoria Street to the west, whilst 40m to the east goes well past the steam railway and parkside road. I just can't see where there's space for a nice underpass that isn't going to be massively less pleasant to use than the level crossing.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,190
Location
Wilmslow
In the UK maybe, but the Dutch do it well, and I recently saw the one in Konstanz which is also wide, spacious, well lit and thus well used.
I was thinking something like this at Bilthoven (near Utrecht) in the Netherlands

Bilthoven

Five years ago the railway underpass at Bilthoven station was opened after a three year reconstruction. That project converted a very dangerous level railway crossing in a busy road into a pleasant and safe space for walking and cycling. The possibilities to improve urban spaces are endless when you divert motorised vehicles to another location.
 

Zamracene749

Member
Joined
11 Dec 2005
Messages
919
Location
East Durham
Fact check for those that thought that chap was drinking Stella. That was a can of caffeine laced energy drink, 'monster' or similar. Not alcohol. However, if pressed i'd bet a tenner that the suspiciously large hand rolled thing he was smoking probably wasn't 100 percent tobacco!
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,517
I was thinking something like this at Bilthoven (near Utrecht) in the Netherlands

Bilthoven
Even that crossing is a very significant visual barrier to a key route through the town. And there really isn't room for anything remotely that size. The current level crossing is far, far better.

If anything, this incident also shows that the crossing is safe - even when a dog and people broke onto the crossing the train is going slow enough to stop.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,587
Location
Torbay
An underpass would be an atrocious addition to the town! Even the nicest ones are gloomy, damp, graffiti covered and smell of urine. The walk from Paignton high st to the beach is already unattractive, an underpass would finish ripping the heart out of this town.
I can't agree that underpasses are by their very nature unpleasant. Much of the poor experience in the UK is from questionable design and execution, and that in many feral sub intersection rabbit warrens, foot traffic has become negligable, so people can get away with doing things they couldn't in busier, more overlooked environments. The best antidote to antisocial behaviour is plenty of people milling around. This is one of the busiest areas possible, and has a wide approach that could include much of the current road width. Regular cleaning and effective security monitoring should be possible.
If the level crossing is unacceptable and can't be fixed by reducing closed time (by improving signalling and adding a crossover so trains can depart from either platform) then the best solution for redevelopment would be to move the station across the road. The crossing would still be needed for occasional moves to the steam railway and Goodrington sidings, but would be open almost all the time. A new station would no doubt be a much nicer gateway to the town than the current run down one.
A Sheringham solution. It's quite narrow to the north of the road. It would likely need to be part of a comprehensive redevelopment either side of the railway, and it would likely encroach on Victoria Park, which might prove controversial. That a rail connection is still needed across the road for access to sidings and the DSR complicates matters. Unless the platforms were moved a long way north (starting say ~200m north perhaps) the booms might still need to be down for a down approach. The existing station could do with some work, but isn't really 'run down' in my view. An entire new two-platform station would be a considerable expense, difficult to justify when the existing one is functional, but at least platform lengths and standage could be better optimised for current traffic under new construction. With 270m+ platforms and 200m overlap, the starting signals could be nearly at Lower Polsham Road, already well into the gradient towards Preston, having climbed ~5m from the crossing. I can't really support the idea of moving the station further from the town centre, the beach, the steam railway and the bus station. If grade separation was impossible, I think the crossing could be better managed with a shorter road closed time before a down arrival, and other measures to reduce the number of empty shunting movements at the north end and allow up departures from either platform.
As a local, I very much support proper pedestrianisation of this road. It could and should be an attractive spacious boulevard to the sea.
Fully agree, though a concern I had at the time was the extent to which free blue badge parking would be restricted in the area. There is a lot of that in meter parking along Torbay Road today and the original full proposal just removed all of it without replacement. The annoying thing is that non-street council-owned carparks nearby don't offer the same concession, which disincentivises using them compared to street meter parking.
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,517
I think the crossing could be better managed with a shorter road closed time before a down arrival, and other measures to reduce the number of empty shunting movements at the north end and allow up departures from either platform
Oh definitely. By far the best solution.
Shunting movements across the crossing should go completely. For departing trains the barriers should go down simultaneously with the train doors closing.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
Oh definitely. By far the best solution.
Shunting movements across the crossing should go completely. For departing trains the barriers should go down simultaneously with the train doors closing.

The shunt moves to/from Goodrington take longer and require GWR staff to operate Paignton South LC barriers, plus there is a noise issue with the surrounding properties by the sidings. Hence why the Paignton North shunt is used outside of summer season where possible.
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,517
The shunt moves to/from Goodrington take longer and require GWR staff to operate Paignton South LC barriers, plus there is a noise issue with the surrounding properties by the sidings. Hence why the Paignton North shunt is used outside of summer season where possible.
Which is why an extra set of points is needed to allow departures from both platforms. Surely it can't be impossible to make that small alteration to the signalling?
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,587
Location
Torbay
The shunt moves to/from Goodrington take longer and require GWR staff to operate Paignton South LC barriers, plus there is a noise issue with the surrounding properties by the sidings. Hence why the Paignton North shunt is used outside of summer season where possible.
I suggest Sands Road should become either remote controlled by the signaller with CCTV or more automated with obstacle detection and local monitoring to reduce the time taken and staff requirements for a south end shunt movement. There's a new type of crossing known as the Automatic Full Barrier Crossing Locally monitored (AFBCL) that could be ideal, but as currently designed it needs a four-barrier installation, unlike Sands Rd, a one-way narrow thoroughfare with only two booms. Perhaps a half barrier ABCL might be suitable. Likely initiated in the down direction by a simple platform plunger operated by the guard, one on each NR platform and one for the DSR dual control. The noise issue is something that will likely have to wait until the coming of battery/hybrid trains. In the meantime, engines might be shut down in the sidings whenever possible, though the throaty roar when restarting is also annoying.
 

OverlordBWT

Member
Joined
30 Dec 2024
Messages
27
Location
York
I'd agree with that. There is so much focus on level crossing safety, but this is rarely an aspect that seems to be considered. Trains are never going at more than walking pace across this crossing, I can't see any reason why the gates couldn't go down less than a minute before an arriving train, and simultaneously with the doors closing for a departing train.
I agree I live in a small town and occasionally have to drive down a small road in an industrial village with a level crossing with speed limits of 20 heading east and 30 heading west. The barrier is down 5 minutes and causes a build up of busses passenger and industrial traffic
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,587
Location
Torbay
Which is why an extra set of points is needed to allow departures from both platforms. Surely it can't be impossible to make that small alteration to the signalling?
Conceptually simple but still expensive. For best value, the time to do it would be when existing track and signalling are planned to be replaced, then the new layout design has more flexibility. The signalling is approaching 40 years old so should be in the window for assessment for renewal by now. Don't know about the junction pointwork.
I agree I live in a small town and occasionally have to drive down a small road in an industrial village with a level crossing with speed limits of 20 heading east and 30 heading west. The barrier is down 5 minutes and causes a build up of busses passenger and industrial traffic
The assumptions are likely based on worst-case rail incident scenarios such as a runaway train losing control, descending the gradient, much less likely with modern rolling stock. There's no doubt also an element of starting to get the barriers down as early as possible so you've time to deal with any 'problem customers' and retry until successful without potentially causing delay.
 
Last edited:

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,190
Location
Wilmslow
I seem to remember that the GWR 1937 plan envisaged moving the station slightly further south to avoid trains blocking the level crossing - and it would have had a pair of long island platforms! Significantly it also included a bridge in place of Sands Rd. Crossing - no idea if such a bridge would be feasible today. C.R. Pott's book on the branch has a plan - can't find my copy at the mo! The only part of the plan enacted was doubling to Goodrington and the new goods depot (now demolished and replaced by housing).
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,587
Location
Torbay
I seem to remember that the GWR 1937 plan envisaged moving the station slightly further south to avoid trains blocking the level crossing - and it would have had a pair of long island platforms! Significantly it also included a bridge in place of Sands Rd. Crossing - no idea if such a bridge would be feasible today. C.R. Pott's book on the branch has a plan - can't find my copy at the mo! The only part of the plan enacted was doubling to Goodrington and the new goods depot (now demolished and replaced by housing).
The bridge to replace Sands Road crossing was successfully built before WW2. It carries Roundham Road and joins Dartmouth Road (A379) at a mini-roundabout. Along the rail alignment, it is about 160m from the crossing it was intended to replace. BR tried to close the crossing post-war, perhaps on several occasions. The proprietor of the corner shop at the Dartmouth Rd junction was the most vociferous objector in the last attempt at resignalling in the 1980s, kicking up a media storm claiming closure would destroy his business as they would be cut off from the quickest route to the beach.
 

OverlordBWT

Member
Joined
30 Dec 2024
Messages
27
Location
York
The assumptions are likely based on worst-case rail incident scenarios such as a runaway train losing control, descending the gradient, much less likely with modern rolling stock. There's no doubt also an element of starting to get the barriers down as early as possible so you've time to deal with any 'problem customers' and retry until successful without potentially causing delay.
Gonna be honest. Its a mining route that connects Kirkby Lane end JN to Ironville JN. Its used a minimum of once daily. Its poorly maintained and it was gonna be reopened but there is no gradient or nothing. Its weirdly long activation from east West but not West east
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,816
Location
West is best
Does anyone know when the Exeter area is due for resignalling? Given the age of most of the signals in it this can't be too far, I suspect if such a crossing was to be installed, this would be when it happens.
Exeter PSB is not likely to be replaced for some time to come. There is no money for it and there are other, older areas of signalling that have a higher priority. How long before Exeter PSB is replaced will depend on many factors, one of which may be the roll out of ETCS/ERTMS.

In terms of the closed time of level crossings, there are others with a longer closed time.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,587
Location
Torbay
Exeter PSB is not likely to be replaced for some time to come. There is no money for it and there are other, older areas of signalling that have a higher priority. How long before Exeter PSB is replaced will depend on many factors, one of which may be the roll out of ETCS/ERTMS.

In terms of the closed time of level crossings, there are others with a longer closed time.
Equipment in the far west was generally considered to be very well maintained and cared for, which tends to keep it going reliably for longer. That's partly down to the quality of talent the railway is able to attract to an area attractive to live in. Management are often able to select the best from far more candidates than apply for more urban and industrial areas for example. Long-term retention is also better.

On the pedestrian underpass issue, here's an interesting presentation from the USA which introduces the concept of 'human tolerance factor'.
 
Last edited:
Status
Not open for further replies.

Top