Adam morrison
Member
Can anybody walk me through the step by step on what you’d do if you came to a low voltage track circuit fault. Thanks in advance
This sounds very much like an examination question.Can anybody walk me through the step by step on what you’d do if you came to a low voltage track circuit fault. Thanks in advance
Do you work for the railway? Are you a signaller or NR employee?Can anybody walk me through the step by step on what you’d do if you came to a low voltage track circuit fault. Thanks in advance
Or, in one case for me, many years ago, a bogie left on the track by contractors.And check that there isn’t, in fact, a train in the section.
Or, in one case for me, many years ago, a bogie left on the track by contractors.
We also regularly get reports of drivers, having pressed the button to lower the barriers at two of our stations, reporting to the signaller that the crossing sequence completed but the signal didn’t come off.
Yes driver, 2 aspect Signalling and a 5 mile section ahead of you. Have you considered that there may be a train present? I’m amazed that these reports make it past the signaller, the signalbox supervisor and control.