• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thames Travel poor reliability?

Status
Not open for further replies.

NSEFAN

Established Member
Joined
17 Jun 2007
Messages
3,518
Location
Southampton
I am travelling from reading to Harwell each day this week, catching a first great western service to Didcot, and then a Thames travel bus to Harwell campus. On both days so far, the X1/X32 buses have been late (at least 30 minutes behind schedule). Am I just having bad luck, or are they always this unreliable?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bill Badger

Member
Joined
28 Nov 2008
Messages
298
Don't catch them regularly but my, limited, experience of this serivce is similar to yours I'm afraid, :(
 

Wolvercoter

Member
Joined
29 Sep 2010
Messages
607
Location
Exeter, Devon
I imagine that the roadworks on the roundabout near Redbridge Park & Ride in Oxford might be causing some delays to the X1/X2/X32 routes at the moment. There is also Abingdon Fair which would affect X1/X2 on Monday and Tuesday this week.

I caught an X1 from Abingdon to Didcot yesterday (Monday) late morning and it was about 20 mins late.

But, irrespective of the above obstructions, from what I've experienced for myself, the reliability of these routes isn't that great anyway.
 

CatfordCat

Member
Joined
23 Jan 2013
Messages
639
I've not had a lot to do with Thames Travel lately (they have retreated somewhat from mid Berkshire)

It did appear that they tended to base tenders etc on "highly efficient" schedules - or unrealistic running times and little in the way of recovery time. I'm not sure if or how far things have changed since they passed to Go-Ahead.

Ultimately, bus operators are expected to make best efforts to run to timetables in the light of likely traffic conditions (to put it another way, they can't timetable to expect the consequences of an accident or a car breaking down at just the wrong spot, but the timetable ought to allow for peak hours)

This isn't an exact science, as even peak hours will vary from one day to the next for no obvious reason, apart from more predictable delays depending on whether it's school or college term or both.

And from the passengers' perspective, while buses on time are what people want, people also don't want a timetable where the bus is timetabled to pass their stop at 8.15 on Monday mornings in school term, 8.18 other school days and 8.22 on school holidays...

http://bususers.org/complaints/how-to-make-a-complaint may be worth a look
 

Busaholic

Veteran Member
Joined
7 Jun 2014
Messages
14,671
I've not had a lot to do with Thames Travel lately (they have retreated somewhat from mid Berkshire)

It did appear that they tended to base tenders etc on "highly efficient" schedules - or unrealistic running times and little in the way of recovery time. I'm not sure if or how far things have changed since they passed to Go-Ahead.

Ultimately, bus operators are expected to make best efforts to run to timetables in the light of likely traffic conditions (to put it another way, they can't timetable to expect the consequences of an accident or a car breaking down at just the wrong spot, but the timetable ought to allow for peak hours)

This isn't an exact science, as even peak hours will vary from one day to the next for no obvious reason, apart from more predictable delays depending on whether it's school or college term or both.

And from the passengers' perspective, while buses on time are what people want, people also don't want a timetable where the bus is timetabled to pass their stop at 8.15 on Monday mornings in school term, 8.18 other school days and 8.22 on school holidays...

http://bususers.org/complaints/how-to-make-a-complaint may be worth a look

I believe Carousel Buses in Bucks, also fairly recently taken over by Go-Ahead ,have had similar scheduling problems and have had to recast their High Wycombe to Uxbridge/Heathrow services a couple of times this year.
 

W-on-Sea

Established Member
Joined
18 Dec 2009
Messages
1,447
I use these routes daily, and I really think the substantial road works on the Oxford Ring Road (and ensuing diversions and delays) are the main cause of the problems now. In general, after some bad times (and a ludicrously over-ambitious timetable that was scrapped as unworkable after a few months last year), I think they have - mostly - got their act together (if anything, under normal conditions, the current timetables for some of the South Oxfordshire routes contain excessive recovery time). And I expect that once the road works are complete (not till the end of November), things will return more or less to normal. Though it will get worse first..as the next phase of the road works, starting later this month, more or less rules out the use of the alternative routes between Oxford and Abingdon that there been using when the A34 has been particularly congested.


That said, the maintenance of some of their buses can leave a certain amount to be desired
 

NSEFAN

Established Member
Joined
17 Jun 2007
Messages
3,518
Location
Southampton
Thanks for the replies everyone. I have been catching earlier trains from Reading and catching an earlier bus from Didcot. Each day the buses to Harwell have been delayed by random amounts. For example, I am currently on an X1 which is about 45 minutes behind schedule, but I will be on time at Harwell so it doesn't matter too much to me.

Those who mentioned the Oxford roadworks must be correct, as the return bus at 1645 from Harwell has been bang on time each day.
 
Status
Not open for further replies.

Top