stevieinselby
Established Member
There are three LCs where the railway crosses minor A-roads (one of which has a bypass with a heigh limit of 8'0"), and about another 20 where it crosses unclassified roads or access roads/tracks.Are there level crossings that might need attention before significantly increasing the service?
Some of the crossings on private access are not signalised and so might not be considered suitable.
I don't think traffic levels are high enough that the crossings being closed twice an hour would cause a major problem.
