zwk500
Veteran Member
With moveable or very high OLE? If the wagons are loaded from the top and side then it may be viable for high OLE but if they're loaded from a hopper directly over the track then the OLE will need to be moveable or the 92 pushed over the gap.My suggestion included electrifying the terminals.
Weston SM is off the XC spine, which depending on your definition would either end at Bristol TM or use the avoiding line. It would however make a lot of sense to electrify Bristol-Weston and then use Battery from the end of OLE to Taunton.But these should all be electrified though. Weston to Yate is on the XC spine anyway.
Portishead is a classic case for batteries, especially if working through to Henbury. It's sensitive and engineeringly challenged through the gorge and isn't going to see sustained high power requirements between stations.
There's 2 tunnels on the Stapleton Road-Avonmouth section that would be very awkward to electrify for double-track, which would be needed to increase the service. However I do agree that electrifying out to at least Avonmouth should really be done.
Henbury is much less awkward, so I would hope is done (although IIRC when WECA announced they were looking at the Filton Bank again it didn't mention going round to Henbury).
Yate-Bristol Parkway is probably going to have to wait for Swindon-Gloucester/Cheltenham to get wired, and that's a very very long way off right now.