Does This bay platform get used by any of the occssional services which start there towards Shanklin? Or is it somply a stabling Siding?
Any gen would be great
Cheers
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CarrotPie

On Moderation
Joined
18 Mar 2021
Messages
1,128
Location
Does This bay platform get used by any of the occssional services which start there towards Shanklin? Or is it somply a stabling Siding?
Any gen would be great
Cheers
I believe it is just used as a stabling siding these days, but it may have been used a platform in the past.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,962
Location
Up the creek
My understanding is that, until the recent rebuild, it was occasionally used for a southbound departure, most commonly for an unscheduled changeover of a unit. I believe that the biggest problem was that the signalman had to put a clip on the trap point at the south end of the bay. Whether they can still do this, I know not.
 

P Binnersley

Member
Joined
30 Dec 2018
Messages
532
A 1989 photo of the signalling diagram shows the third platform as "Down Siding" with a disc exit signal and no facing point lock. This doesn't seem to have changed since the 1967 rationalisation/electrification.

This doesn't rule out the move described by Gloster above, but it would be an exception.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,745
Location
West of Andover
In the current timetable where the unit working the 2nd train per hour (Ryde Esplanade - Shanklin) where it has a little 3 hour 'rest' between 13:07 & 16:17 sitting in the bay platform during those time. That unit will shift from the bay to the regular southbound platform after the 15:51 Shanklin has departed.
 
Joined
27 May 2021
Messages
689
Location
Daventry
In the current timetable where the unit working the 2nd train per hour (Ryde Esplanade - Shanklin) where it has a little 3 hour 'rest' between 13:07 & 16:17 sitting in the bay platform during those time. That unit will shift from the bay to the regular southbound platform after the 15:51 Shanklin has departed.
Interesting. Thanks everyone.
 