Cheshire Scot
Established Member
Driving south on the A9 today on the Pitlochry to Ballinluig dual carriageway section we overtook a low loader with a freight wagon on it - looked like a cement wagon presumably unfit to return south on the return empties.
A few miles further south and now on single carriageway we met a northbound railway carriage on the back of a low loader. Firm identification difficult with a passing speed of around 100mph - me at 50 to 60mph, the lorry (with escort) I assume at 40 to 50 mph - on the adjacent lane, but from that brief viewing I would have said Caley Sleeper livery with the word Generator on the side. Is this sleepers solution to avoid of last years very expensive burst pipe scenario when the sleepers spent three frostynights unheated in Millburn Yard resulting i the cancellation of the first post Christmas southbound sleeper from Inverness and consequent expensive repairs to plumbing carppets and bedding?
I assume Scotrail must have first bid on Inverness shore supplies for overnight stabling.
A few miles further south and now on single carriageway we met a northbound railway carriage on the back of a low loader. Firm identification difficult with a passing speed of around 100mph - me at 50 to 60mph, the lorry (with escort) I assume at 40 to 50 mph - on the adjacent lane, but from that brief viewing I would have said Caley Sleeper livery with the word Generator on the side. Is this sleepers solution to avoid of last years very expensive burst pipe scenario when the sleepers spent three frostynights unheated in Millburn Yard resulting i the cancellation of the first post Christmas southbound sleeper from Inverness and consequent expensive repairs to plumbing carppets and bedding?
I assume Scotrail must have first bid on Inverness shore supplies for overnight stabling.