Much as it might make operational sense, I think that electrifying any part of the VoG while ignoring the SWML west of Cardiff would be politically impossible for NR/GBR.
Which is why I suggested electrifying only to Barry & Penarth for the high frequency TfW routes. But let VoG wait until NR stumps up the cash for SWML (inc VoG) electrification.

Barry to Bridgend should then be possible using batteries.

== Doublepost prevention - post automatically merged: ==

While the current Crossrail plans (Phase 1A & 1B) are relatively modest, there are some interesting options in the future phases. In the Council Planning Documents (see agenda item 60 - item 2 Appendix B) it shows the Penarth line being incorporated into the Crossrail and/or Circle line with a connection from Callaghan Square north towards Queen Street.

But how? Would it require a viaduct across Callaghan Square? Or is there room for a rising ramp to be built alongside the existing viaduct (similar to the one to the south).

And could it incorporate a Herbert Street station?
 
Last edited:

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
Which is why I suggested electrifying only to Barry & Penarth for the high frequency TfW routes. But let VoG wait until NR stumps up the cash for SWML (inc VoG) electrification.

Barry to Bridgend should then be possible using batteries.

== Doublepost prevention - post automatically merged: ==

While the current Crossrail plans (Phase 1A & 1B) are relatively modest, there are some interesting options in the future phases. In the Council Planning Documents (see agenda item 60 - item 2 Appendix B) it shows the Penarth line being incorporated into the Crossrail and/or Circle line with a connection from Callaghan Square north towards Queen Street.

But how? Would it require a viaduct across Callaghan Square? Or is there room for a rising ramp to be built alongside the existing viaduct (similar to the one to the south).

And could it incorporate a Herbert Street station?
I think there is room for them to build a ramp and bridge across to join the bay line towards queen street. A station at Callanghan square could take pressure off central
 

Smwrff

Member
Joined
27 Dec 2023
Messages
255
Location
Cymru Fawr
From a traffic perspective it would be better to build a ramp on Callaghan Square leading up to a bridge over Bute Street - but not so much from a visual perspective - or cost.

== Doublepost prevention - post automatically merged: ==

But if you are going to build a bridge then maybe it should connect south as well - and also replace Herbert Street bridge to remove the bottleneck on the road junction (this was planned earlier by CC but now dropped). A new three-way elevated junction!!!
 
Last edited:

EveningStarr

Member
Joined
24 Oct 2024
Messages
54
Location
South Wales
There is potential for Treherbert to get 4tph before the track work, if the current Bay-Pontypridd diagrams extend (dependent on successful implementation of enough 398s), thus not increasing the number of trains through CDQ. I say Treherbert, as they run 12 minutes after the previous ones, so would create a more-or-less quarter-hourly service to TRB.
 

tigermonstera

Member
Joined
11 Mar 2025
Messages
150
Location
UK
There's more information about the proposed station included in the planning application (P/25/0165 on Merthyr's planning portal), especially on pages 63-64 of the Design and Access Statement and in TFW's consultation responses:
Phased Delivery & Safeguarding

• Ensure the future metro station and transport hub can be seamlessly integrated without disrupting initial residential development.

• Safeguard a 15m corridor for future infrastructure, including public open space, active travel routes, and public realm enhancements.

• Phase the design of the pylon area, facilitating access to residential units while allowing for the future integration of a bus turning and transport interchange area.
(From the DAS)
As noted above, an area of land has been safeguarded along the western boundary of the site, which could be developed in the future to accommodate a metro station. The development of the metro station itself does not form part of this application, as this would need to be delivered by Transport for Wales who are responsible for the railway network. However, the intention is to ensure sufficient land remains available for such purposes should this come forward in the future.
It is acknowledged that concerns were raised as a result of the publicity exercise in respect of the potential loss of the existing train station in favour of the Metro Station. At this stage there is only an intention to safeguard an area of land to accommodate a potential metro station in the future. There is no certainty that this would come forward or that it would impact on the existing Pentrebach Train Station. This would be subject to separate considerations in conjunction with Transport for Wales who are responsible for the railway line.
(From the committee report)
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,016
While the current Crossrail plans (Phase 1A & 1B) are relatively modest, there are some interesting options in the future phases. In the Council Planning Documents (see agenda item 60 - item 2 Appendix B) it shows the Penarth line being incorporated into the Crossrail and/or Circle line with a connection from Callaghan Square north towards Queen Street.

But how? Would it require a viaduct across Callaghan Square? Or is there room for a rising ramp to be built alongside the existing viaduct (similar to the one to the south).

And could it incorporate a Herbert Street station?
I think you're referring to this diagram? It's the only one in the referenced document that shows the service pattern.

If you are, I think you've misunderstood it. This is a diagrammatic map and it hides the details around Cardiff Central and Callaghan Square. If you look at the detailed design drawings in the same document (see attached) there is no mention of a future alignment branching off in Callaghan Square and heading towards Queen St. What I understand from the diagram below and the wider design drawings is that trains coming from Penarth will either continue to use the existing route into Central and then on to Queen St and Coryton, or they will diverge at Cardiff West Junction, go down the proposed ramp to the tram platforms outside Central's south entrance, and then continue via Callaghan Square to the Bay. We can only speculate as to service patterns, but Coryton-Penarth-Cardiff Bay-Penarth and repeat seems likely given the diagram.

1770300752958.png
 

Attachments

  • Item 6 - Appendix B.pdf
    5.1 MB · Views: 7

Smwrff

Member
Joined
27 Dec 2023
Messages
255
Location
Cymru Fawr
Yes - I see your point with this diagram which is ambiguous.... but I thought I saw a more specific proposal in an earlier document...let me try and find it
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,680
Location
Nottingham
I can't see how a route from Callaghan Square up to Queen Street would be remotely feasible without demolishing much of the square itself and probably the Bay line too. It's also unnecessary, as it would be paralleling the existing rail connection.
 

The Pelican

Member
Joined
3 Oct 2025
Messages
412
Location
London
A Central-queen street service via a series of street tram sections, on the other hand, might make the trams more visible in the city centre, as has helped in Manchester, and allow one or two extra stops near to where people are shopping or using offices. After Queen Street, it could rejoin one or the other of the two routes which head north. This would allow for trams to run through Cardiff without using Queen Street's northern junction. As in Manchester, it would probably be cheap compared to the cost of the scheme as a whole, and make it obvious to the public that there is a new tram system.
 

Smwrff

Member
Joined
27 Dec 2023
Messages
255
Location
Cymru Fawr
I can't see how a route from Callaghan Square up to Queen Street would be remotely feasible without demolishing much of the square itself and probably the Bay line too. It's also unnecessary, as it would be paralleling the existing rail connection.
It is 'relatively' easy - the tram would need to rise onto a viaduct on Callaghan Square - to cross over Bute Street before turning north to join Bay line to Queen Street.

Not saying it will happen - only that it is feasible.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,680
Location
Nottingham
It is 'relatively' easy - the tram would need to rise onto a viaduct on Callaghan Square - to cross over Bute Street before turning north to join Bay line to Queen Street.

Not saying it will happen - only that it is feasible.
Almost certainly incompatible with going towards the Bay as well, which is much more useful.
 

Smwrff

Member
Joined
27 Dec 2023
Messages
255
Location
Cymru Fawr
Almost certainly incompatible with going towards the Bay as well, which is much more useful.
No - still feasible and compatible. Think of the three way raised junction on DLR

== Doublepost prevention - post automatically merged: ==

I knew I had seen this somewhere - see attached article showing Cardiff Circle Line proposal - clearly showing tram line crossing Callaghan Square and then splitting north to Queen Street and south to Bay.


But ok - this is not for Penarth services.
 
Last edited:

positron

Member
Joined
18 Oct 2022
Messages
710
Location
Cardiff
https://www.mirror.co.uk/news/uk-news/whole-new-uk-town-created-36616806

The former Hoover site in Merthyr is undergoing development. Some talk of a new station to serve it.
If it's towards the north end of the site then I don't think it's that much of an impact on the existing station.

Troedyrhiw is already fairly close to the south. The tram trains are designed for exactly this.

Costs more but potentially pentre could be moved a little to the south, to even the spacing a bit if there is a concern of redundancy.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,016
No - still feasible and compatible. Think of the three way raised junction on DLR

== Doublepost prevention - post automatically merged: ==

I knew I had seen this somewhere - see attached article showing Cardiff Circle Line proposal - clearly showing tram line crossing Callaghan Square and then splitting north to Queen Street and south to Bay.


But ok - this is not for Penarth services.
Thanks - I'd not seen that before, but that's a 2019 article, so it looks like that was an option that was evaluated and ruled out. The John Street development, which appears to have been subject to a planning application in 2025, will eventually fill the space between the main and Bay railway lines with two new residential tower blocks - if Cardiff Council (lead on Crossrail) and TfW had decided that they needed that piece of land they'd have put protection in for it by now.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,680
Location
Nottingham
Thanks - I'd not seen that before, but that's a 2019 article, so it looks like that was an option that was evaluated and ruled out. The John Street development, which appears to have been subject to a planning application in 2025, will eventually fill the space between the main and Bay railway lines with two new residential tower blocks - if Cardiff Council (lead on Crossrail) and TfW had decided that they needed that piece of land they'd have put protection in for it by now.
It may be feasible at the cost of slapping a ramp down in the middle of what's supposed to be a prime site for Cardiff. But I come back to my previous question - what's the point if it just duplicates the route from Central main line platforms?
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
917
It may be feasible at the cost of slapping a ramp down in the middle of what's supposed to be a prime site for Cardiff. But I come back to my previous question - what's the point if it just duplicates the route from Central main line platforms?
None at all so far as I can see, unless you buy the weird argument that unless people see trams running on the streets, they won't realise they exist.
 

Smwrff

Member
Joined
27 Dec 2023
Messages
255
Location
Cymru Fawr
I am not suggesting this will happen - or is desirable - but it was planned at one stage and is still feasible.

Many years ago the plan was to replace Herbert Street bridge and widen the road junction there to let trams under the bridge before turning south. That plan has unfortunately been scrapped.
 