Surely better value to simply upgrade the batteries, giving ongoing battery improvementsAnother reason why I suggested wiring the VOG to Penarth but also Llantwit Major or ewenny to Bridgend
Surely better value to simply upgrade the batteries, giving ongoing battery improvementsAnother reason why I suggested wiring the VOG to Penarth but also Llantwit Major or ewenny to Bridgend
Which is why I suggested electrifying only to Barry & Penarth for the high frequency TfW routes. But let VoG wait until NR stumps up the cash for SWML (inc VoG) electrification.Much as it might make operational sense, I think that electrifying any part of the VoG while ignoring the SWML west of Cardiff would be politically impossible for NR/GBR.
I think there is room for them to build a ramp and bridge across to join the bay line towards queen street. A station at Callanghan square could take pressure off centralWhich is why I suggested electrifying only to Barry & Penarth for the high frequency TfW routes. But let VoG wait until NR stumps up the cash for SWML (inc VoG) electrification.
Barry to Bridgend should then be possible using batteries.
== Doublepost prevention - post automatically merged: ==
While the current Crossrail plans (Phase 1A & 1B) are relatively modest, there are some interesting options in the future phases. In the Council Planning Documents (see agenda item 60 - item 2 Appendix B) it shows the Penarth line being incorporated into the Crossrail and/or Circle line with a connection from Callaghan Square north towards Queen Street.
But how? Would it require a viaduct across Callaghan Square? Or is there room for a rising ramp to be built alongside the existing viaduct (similar to the one to the south).
And could it incorporate a Herbert Street station?
The former Hoover site in Merthyr is undergoing development. Some talk of a new station to serve it.The development extends beyond just residential properties. It will also incorporate a new community hub featuring shops alongside a metro station and transport hub, reports WalesOnline.
Yes and they're are concerned it will affect the current closest station at Quakers yardhttps://www.mirror.co.uk/news/uk-news/whole-new-uk-town-created-36616806
The former Hoover site in Merthyr is undergoing development. Some talk of a new station to serve it.
Pentre-Bach is the station close by.Yes and they're are concerned it will affect the current closest station at Quakers yard
Sorry that's the onePentre-Bach is the station close by.
(From the DAS)Phased Delivery & Safeguarding
• Ensure the future metro station and transport hub can be seamlessly integrated without disrupting initial residential development.
• Safeguard a 15m corridor for future infrastructure, including public open space, active travel routes, and public realm enhancements.
• Phase the design of the pylon area, facilitating access to residential units while allowing for the future integration of a bus turning and transport interchange area.
As noted above, an area of land has been safeguarded along the western boundary of the site, which could be developed in the future to accommodate a metro station. The development of the metro station itself does not form part of this application, as this would need to be delivered by Transport for Wales who are responsible for the railway network. However, the intention is to ensure sufficient land remains available for such purposes should this come forward in the future.
(From the committee report)It is acknowledged that concerns were raised as a result of the publicity exercise in respect of the potential loss of the existing train station in favour of the Metro Station. At this stage there is only an intention to safeguard an area of land to accommodate a potential metro station in the future. There is no certainty that this would come forward or that it would impact on the existing Pentrebach Train Station. This would be subject to separate considerations in conjunction with Transport for Wales who are responsible for the railway line.
I think you're referring to this diagram? It's the only one in the referenced document that shows the service pattern.While the current Crossrail plans (Phase 1A & 1B) are relatively modest, there are some interesting options in the future phases. In the Council Planning Documents (see agenda item 60 - item 2 Appendix B) it shows the Penarth line being incorporated into the Crossrail and/or Circle line with a connection from Callaghan Square north towards Queen Street.
But how? Would it require a viaduct across Callaghan Square? Or is there room for a rising ramp to be built alongside the existing viaduct (similar to the one to the south).
And could it incorporate a Herbert Street station?

It is 'relatively' easy - the tram would need to rise onto a viaduct on Callaghan Square - to cross over Bute Street before turning north to join Bay line to Queen Street.I can't see how a route from Callaghan Square up to Queen Street would be remotely feasible without demolishing much of the square itself and probably the Bay line too. It's also unnecessary, as it would be paralleling the existing rail connection.
Almost certainly incompatible with going towards the Bay as well, which is much more useful.It is 'relatively' easy - the tram would need to rise onto a viaduct on Callaghan Square - to cross over Bute Street before turning north to join Bay line to Queen Street.
Not saying it will happen - only that it is feasible.
No - still feasible and compatible. Think of the three way raised junction on DLRAlmost certainly incompatible with going towards the Bay as well, which is much more useful.
If it's towards the north end of the site then I don't think it's that much of an impact on the existing station.https://www.mirror.co.uk/news/uk-news/whole-new-uk-town-created-36616806
The former Hoover site in Merthyr is undergoing development. Some talk of a new station to serve it.
Thanks - I'd not seen that before, but that's a 2019 article, so it looks like that was an option that was evaluated and ruled out. The John Street development, which appears to have been subject to a planning application in 2025, will eventually fill the space between the main and Bay railway lines with two new residential tower blocks - if Cardiff Council (lead on Crossrail) and TfW had decided that they needed that piece of land they'd have put protection in for it by now.No - still feasible and compatible. Think of the three way raised junction on DLR
== Doublepost prevention - post automatically merged: ==
I knew I had seen this somewhere - see attached article showing Cardiff Circle Line proposal - clearly showing tram line crossing Callaghan Square and then splitting north to Queen Street and south to Bay.
![]()
The maps and full details of Cardiff's £1bn 'Crossrail' plan revealed
Cardiff has drawn up a blueprint for a £1bn plan to bring tram-trains back to the streets of the citywww.walesonline.co.uk
But ok - this is not for Penarth services.
It may be feasible at the cost of slapping a ramp down in the middle of what's supposed to be a prime site for Cardiff. But I come back to my previous question - what's the point if it just duplicates the route from Central main line platforms?Thanks - I'd not seen that before, but that's a 2019 article, so it looks like that was an option that was evaluated and ruled out. The John Street development, which appears to have been subject to a planning application in 2025, will eventually fill the space between the main and Bay railway lines with two new residential tower blocks - if Cardiff Council (lead on Crossrail) and TfW had decided that they needed that piece of land they'd have put protection in for it by now.
None at all so far as I can see, unless you buy the weird argument that unless people see trams running on the streets, they won't realise they exist.It may be feasible at the cost of slapping a ramp down in the middle of what's supposed to be a prime site for Cardiff. But I come back to my previous question - what's the point if it just duplicates the route from Central main line platforms?