LCRTrainfan979
Member
The problem with closing down all of those stations is that I can imagine much of the demand the further east you go being for services to Portsmouth instead of Southampton. Getting rid of those services would just cause new issues where people would cram onto buses going into a nearby junction station. That is why I would personally have such a tram system continue onto Portsmouth, so that could fully replace all demand from those quiet stations. Having all of the way to Portsmouth could in turn allow more fast trains from Portsmouth to Southampton, as no trains would now no longer have to call at all of the quiet stations on the Netley line. That could also allow better spacing, as all of the trains on the section would have more similar stopping patterns, rather than among loads of semi fast or fast services, having to squeeze in a stopping service which calls at 8 more stations than the fastest non-stop services over the same line. That in turn would mean better regional services for people travelling well beyond Southampton, and could eliminate some of the poor spacing that was evident on the timetable before the May 2024 timetable change with Southern.I can envisage St Denys, Swaythling, Bitterne, Woolston, Sholing being obviated by a decent tram network
Beyond all doubts, the Netley line cannot close, and I was absolutely never suggesting that line is closed down. Rather I would suggest that in such a scenario, you could close all except maybe a few of the busiest stations, which I would personally say should be Woolston, Netley and Swanwick, each of which could in turn have passenger interchanges to the tram for onward travel connections.