With regards to the question asked; what lines do you think should be next for electrification, my answers are below:
Midland Main Line
This should have been completed or nearing completion at the same time as the GWML scheme with Kettering to Sheffield via Langley Mill and Derby/Nottingham with a addon scheme towards the completion of said scheme to take the wires to Doncaster/Wakefield Westgate as well as Bedford to Bletchley.
Liverpool - Hull
This should be done together with electrification of the TransPennine routes HOWEVER Doncaster/York to Hull should be done first.
GWML west of Cardiff
This is already being done as far as Swansea and should include the Cardiff Valleys with the latter being used as a more metro type of operation.
Bristol - Devon/Cornwall and Newbury - Devon/Cornwall
If this is to be considered then both lines ought to be done around the same time but as far as Exeter St Davids with the second part of the scheme if funding is still available to take the wires to Plymouth and Paignton only.
Chiltern Main Line
If done then it should start from the West Midlands with the Snow Hill lines done first then continued to Oxford via Banbury with a addon scheme to take the wires from Leamington Spa to Nuneaton via Coventry.
As to London Marylebone to Banbury/Oxford/Aylesbury; it should be done with OHL between Harrow on the Hill Platforms 1/2 to London Marylebone/Amersham Platforms 1/3 to Aylesbury Vale Parkway/Princes Risborough to Aylesbury/Oxford with the Harrow on the Hill Platforms 1/2 to Amersham section being kept as LUL 4th rail.
Yes this means having dual voltage trains but it can't be that difficult to have a metro fleet capable of both 4th rail and OHL operation as well as a outer surburban/IC fleet capable of OHL.
Bristol - Birmingham/Birmingham - Derby
This ought to be done as one scheme however I believe that it should be shortened to Bristol Parkway to Bromsgrove and Birmingham New Street to Derby with Derby to Nottingham already been done as part of the MML electrification scheme.
Oxford - Coventry/Nuneaton
This would be completed under the Chiltern Electrification scheme.
Oxford - Bedford (Varsity Line)
This would be completed under the Midland Mainline Electrification scheme.
WofE Main Line/Wessex Main Line
Not yet but should be considered.
North Downs Line
This should be done together with the Oxted to Uckfield line however as much as there is a safety case against it, I think it should be done as 3rd rail.
Peterborough - Ely - Norwich/Ipswich/Birmingham - Leicester - Peterborough
Once this is competed, it will mean that Cross Country would not be using 2 car DMUs on a inter regional route with 3tph of 4 car EMUs on the Birmingham to Leicester route with 2tph to Stansted Airport.
Nottingham - Newark - Lincoln
This should only go ahead when the solution to replace the flat crossing at Newark has been resolved, in the meantime OHL should be extended from Newark Northgate to Lincoln.
Transpennine Lines
As part of electrifying the Transpennine routes, the following line should all be done one by one;
Calder Valley Line/Huddersfield Line/Ribble Valley Line/Liverpool to Manchester Lines.
Hope Valley Line
This should be done as a infill scheme once the MML is finished.
Crewe - Holyhead
No, much like Plymouth to Penzance I can't see a strong enough business case.
Edinburgh/Glasgow - Aberdeen
No until the Forth Bridge is resolved.