• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Poll: What are your suggestions for the future redundant HST sets?

What should happen to the HST sets?


  • Total voters
    295
Status
Not open for further replies.

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,424
Location
UK
That doesn't really alter the point that HST's represent potential greater capacity and an InterCity standard interior which would suit the service.

And unlike class 37's recently, they have a proven track record of operating on routes which are more winding and stop/start than the S&C.

Because 158s are better suited to the route?
I don't see why the S&C needs a Intercity Standard interior, when it's a regional stopping service?
The 158s have a much better acceleration for the frequent stops, and they are much cheaper to maintain than the HSTs!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,419
Location
Yorks
Because 158s are better suited to the route?
I don't see why the S&C needs a Intercity Standard interior, when it's a regional stopping service?
The 158s have a much better acceleration for the frequent stops, and they are much cheaper to maintain than the HSTs!

But there aren't enough 158's to go around. The FoSC for example want to see longer trains on the route, and that isn't going to happen without additional resources.

Plus the S&C is a tourist attraction in its own right, as well as being a regional "stopper" (It's the fast service between Leeds and Skipton). The large windows and widely spaced seating in a 1st class mk 3 are ideal for tourists doing the scenic trip.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,424
Location
UK
But there aren't enough 158's to go around. The FoSC for example want to see longer trains on the route, and that isn't going to happen without additional resources.

Plus the S&C is a tourist attraction in its own right, as well as being a regional "stopper" (It's the fast service between Leeds and Skipton). The large windows and widely spaced seating in a 1st class mk 3 are ideal for tourists doing the scenic trip.

But won't more 158s be available when the 195s enter service?
Anyway the Mk3s are almost life expired, with quite extensive corrosion, so would be unsuitable in the long term.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,419
Location
Yorks
But won't more 158s be available when the 195s enter service?
Anyway the Mk3s are almost life expired, with quite extensive corrosion, so would be unsuitable in the long term.

There's going to be quite a lot of call on the 158's, even with new stock coming in, as so much older stock is being withdrawn. Plus, their comparatively high density layout doesn't quite suit the tourist market.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,578
Location
Macclesfield
As I recall, there was a proposal put to BR when they were considering closing the S&C in the eighties to illustrate that utilising 1+4 HST formations, released from the East Coast by electrification, over the route to a clockface (2-hourly?) timetable, combined with continuously welded rail, selective singling to improve alignment and enhance linespeeds and RETB signalling, could reduce operating costs overall and attract custom by improving the passenger experience.

This was against the contemporary infrequent loco-hauled operation using some of BR's most decrepit stock over a decaying route starved of investment, rather than the current Sprinter operation over a line maintained for heavy freight, however, and the HSTs are now over thirty years older.
Have any of the preserved lines expressed an interest in keeping a set (or two)?
Not specifically as far as I am aware, but the 125 Group are currently raising funds to build a storage and running shed for their current and future HST stock on the Great Central Railway (North).
 
Last edited:

GrimShady

Established Member
Joined
13 Dec 2016
Messages
1,740
As I recall, there was a proposal put to BR when they were considering closing the S&C in the eighties to illustrate that utilising 1+4 HST formations, released from the East Coast by electrification, over the route to a clockface (2-hourly?) timetable, combined with continuously welded rail, selective singling to improve alignment and enhance linespeeds and RETB signalling, could reduce operating costs overall and attract custom by improving the passenger experience.

This was against the contemporary infrequent loco-hauled operation using some of BR's most decrepit stock over a decaying route starved of investment, rather than the current Sprinter operation over a line maintained for heavy freight, however, and the HSTs are now over thirty years older.

Not specifically as far as I am aware, but the 125 Group are currently raising funds to build a storage and running shed for their current and future HST stock on the Great Central Railway (North).

Maybe a return of Glasgow - Yorkshire services that haven't run since the 70s?
 
Status
Not open for further replies.

Top